Phase I
This project is under construction. The items shown in this drawing are similar to the features that will be constructed.
Drawing 1
Picture 1 - Bridge Rail, July 30, 2003
Picture 2 - Towne Centre Drive, East Abutment, July 30, 2003
Picture 3 - Mesquite Section, Phase 1, Center Bent, July 30, 2003
Picture 4 - Looking North, West Abutment, July 30, 2003
Picture 5 - The Towne Centre Drive bridge from west of the Mesquite Drive intersection
Picture 6 - The Towne Centre Drive bridge driving through the southbound frontage road intersection
Picture 7 - The Towne Centre Drive bridge stopped east of the northbound frontage road intersection
Picture 8 - The Towne Centre Drive bridge U-turn, classic rail and paver sidewalk
Picture 9 - The south side of the Towne Centre Drive bridge center bent column, pedestrian fence, classic rail and paver sidewalk
Picture 10 - The south elevation view of the Towne Centre Drive bridge from the west approach to the east approach
Picture 11 - The south elevation view of the Town Centre Drive bridge from the west abutment to the east abutment
Picture 12 - A close in view of the south elevation of the Towne Centre Drive bridge center bent column
 
Phase II
This project is in the early design stage. The items shown in these drawings is the approach being undertaken at this time. The look at Town East Blvd. is being developed to complement the Phase 1 project.