| Phase I |
| This project is under construction. The items shown in this drawing are similar to the features that will be constructed. |
| Drawing 1 |
| Picture 1 - Bridge Rail, July 30, 2003 |
| Picture 2 - Towne Centre Drive, East Abutment,
July 30, 2003 |
| Picture 3 - Mesquite Section, Phase 1, Center
Bent, July 30, 2003 |
| Picture 4 - Looking North, West Abutment, July
30, 2003 |
| Picture 5 - The Towne Centre Drive bridge from west of the Mesquite Drive
intersection |
| Picture 6 - The Towne Centre Drive bridge driving through the southbound frontage
road intersection |
| Picture 7 - The Towne Centre Drive bridge stopped east of the northbound frontage
road intersection |
| Picture 8 - The Towne Centre Drive bridge U-turn, classic rail and paver sidewalk |
| Picture 9 - The south side of the Towne Centre Drive bridge center bent column,
pedestrian fence, classic rail and paver sidewalk |
| Picture 10 - The south elevation view of the Towne Centre Drive bridge from the west
approach to the east approach |
| Picture 11 - The south elevation view of the Town Centre Drive bridge from the west
abutment to the east abutment |
| Picture 12 - A close in view of the south elevation of the Towne Centre Drive bridge
center bent column |
| |
| Phase II |
| This project is in the early design stage. The items shown in these drawings is the approach being undertaken at this time. The look at Town East Blvd. is being developed to complement the Phase 1 project. |
| Drawing 1 |
| Drawing 2 |
| Drawing 3 |
| Drawing 4 |
| |
| |