DIVISION I - EARTHWORK

Table Of Contents

100 Preparing Right of Way
103 Disposal of Wells
104 Removing Concrete
105 Removing Stabilized Base and/or Asphaltic Pavement
106 Obliterating Abandoned Road
110 Excavation
112 Subgrade Widening
132 Embankment
134 Backfilling Pavement Edges
150 Blading
152 Road Grader Work
154 Scraper Work
156 Bulldozer Work
158 Specialized Excavation Work
160 Furnishing and Placing Topsoil
162 Sodding for Erosion Control
164 Seeding for Erosion Control
166 Fertilizer
168 Vegetative Watering
169 Soil Retention Blanket
170 Irrigation System
180 Wildflower Seeding
192 Roadside Planting and Establishment
193 Landscape Maintenance

ITEM NO. TITLE AND REQUIREMENTS

100 - PREPARING RIGHT OF WAY

SPECIFICATION REQUIREMENTS

1) Limits must be shown on the plans.
2) Trees, shrubs and other landscape features specified for preservation should be clearly shown on the plans.
3) When removing trees, must specify the diameter of the trees being removed.

OPTIONAL REQUIREMENTS
1) When wells are included to be removed, the shall be removed and paid for in accordance with Item 103.

PAYMENT DESCRIPTION UNITS
1) "Preparing Right of Way" AC, STA
2) "Preparing Right of Way (Palms)" EA
3) "Preparing Right of Way (Trees) (Diameter Specified)" EA

REFERENCE ITEMS
(132)

Go to Top

103 - DISPOSAL OF WELLS

SPECIFICATION REQUIREMENTS
1) Location and type of well(s) must be shown on the plans.
2) Areas to be restored must be shown on the plans.

OPTIONAL REQUIREMENTS
None

PAYMENT DESCRIPTION UNITS
1) "Disposal of Water Well" EA
2) "Disposal of Petroleum or Sulfur Well" EA

REFERENCE ITEMS
(100)

Go to Top

104 - REMOVING CONCRETE

SPECIFICATION REQUIREMENTS
1) Limits and/or locations of removal must be shown on the plans.
2) Removal of monolithic curbs and/or dowel concrete curbs on concrete pavements is considered part of the concrete pavement and will not be measured separately for payment.
3) This is a plans quantity measurement Item.
4) Removal of stabilized base or asphaltic concrete will be paid for by the applicable bid Items unless otherwise shown on the plans. 5) All retaining wall footings will not be paid for directly by considered subsidiary.

OPTIONAL REQUIREMENTS
None  

PAYMENT DESCRIPTION UNITS
1) "Removing Concrete (Type Specified)" LF, SY, CY

REFERENCE ITEMS
None

Go to Top

105 - REMOVING STABILIZED BASE AND/OR ASPHALTIC PAVEMENT

SPECIFICATION REQUIREMENTS
1) Locations and depth must be shown on the plans.
2) Stockpile locations must be shown on the plans.
3) Placement of salvaged material in stockpiles will conform to the dimensions and requirements shown on the plans.
4) This is a plans quantity measurement Item.
5) For Class 2, the limits of measurement will be as shown on the plans.

OPTIONAL REQUIREMENTS
None

PAYMENT DESCRIPTION UNITS
1) "Removing Stabilized Base and/or Asphaltic Pavement (Measurement Class Specified) (Depth Specified)" STA (Class 1), SY (Class 2), CY (Class 3)

REFERENCE ITEMS
None

Go to Top

106 - OBLITERATING ABANDONED ROAD

SPECIFICATION REQUIREMENTS
1) Limits must be shown on the plans.
2) Removal of abandoned structures will be considered subsidiary to this Item, unless otherwise shown on the plans.
3) Removal of any asphaltic material will be paid for in conformance with applicable bid Items and can be stockpiled at locations shown on the plans or as directed by the Engineer.

OPTIONAL REQUIREMENTS
None

PAYMENT DESCRIPTION UNITS
1) "Obliterating Abandoned Road" STA

REFERENCE ITEMS
None

Go to Top

110 - EXCAVATION

SPECIFICATION REQUIREMENTS
1) Roadway, channel and/or special excavation areas must be shown on the plans.
2) This is a plans quantity measurement Item.
3) Excavation in backfill areas of retaining walls will not be measured for payment. Limits of measurement for excavation in retaining wall areas will be as shown on the following Statewide Standard Details Sheet:

EMRW-94

Earthwork Measurement at Retaining Walls

4) Shrinkage or swelling factors will not be considered in determining the calculated quantities.

OPTIONAL REQUIREMENTS
None

PAYMENT DESCRIPTION UNITS
1) "Excavation (Roadway)" CY
2) "Excavation (Channel)" CY
3) "Excavation (Special)" CY
4) "Excavation (Roadway and Channel)" CY

REFERENCE ITEMS
(132)

Go to Top

112 - SUBGRADE WIDENING

SPECIFICATION REQUIREMENTS
1) Limits must be shown on the plans.
2) Show areas to be widened on the typical section(s).
3) Type of compaction must be specified on the plans.
4) This is a plans quantity measurement Item.
5) When "Ordinary Compaction" is specified, all sprinkling and rolling, except proof rolling, will not be paid for directly, but will be considered subsidiary to this Item, unless otherwise shown on the plans.
6) When "Density Control" is specified, all sprinkling and rolling, except proof rolling, will not be paid for directly, but will be considered subsidiary to this Item.

OPTIONAL REQUIREMENTS
1) When proof rolling is shown on the plans, it will be paid for in accordance with Item 216.

PAYMENT DESCRIPTION UNITS
1) "Subgrade Widening (Ordinary Compaction)" STA
2) "Subgrade Widening (Density Control)" STA

REFERENCE ITEMS
(132, 204)

Go to Top

132 - EMBANKMENT

SPECIFICATION REQUIREMENTS
1) Limits and/or locations for embankments must be shown on the plans.
2) Type C material must conform to the specification requirements shown on the plans.
3) For type D material, the required excavation areas must be shown on the plans.
4) Type of compaction must be specified on the plans.
5) When "Ordinary Compaction" is specified, all sprinkling and rolling, except proof rolling, will not be paid for directly, but will be considered subsidiary to this Item, unless otherwise shown on the plans.
6) When "Density Control" is specified, all sprinkling and rolling, except proof rolling, will not be paid for directly, but will be considered subsidiary to this Item.
7) Retaining wall backfill areas which are also in embankment areas will be measured for payment as embankment except as shown on the plans. Limits of measurement for embankment in retaining wall areas will be as shown on the following Statewide Standard Details Sheet:

EMRW-94 Earthwork Measurement at Retaining Walls

8) Shrinkage or swelling factors will not be considered in determining the calculated quantities. 9) Class 3 measurement is a plans quantity measurement Item

OPTIONAL REQUIREMENTS
1) When proof rolling is shown on the plans, it will be paid for in accordance with Item 216.

PAYMENT DESCRIPTION UNITS
1) "Embankment (Compaction Method) (Type Specified) (Class Specified)" CY

REFERENCE ITEMS
(204, 400)

Go to Top

134 - BACKFILLING PAVEMENT EDGES

SPECIFICATION REQUIREMENTS
1) Limits must be shown on the plans.
2) Show areas to be backfilled on typical section(s).
3) Type A requirements must be shown on the plans.
4) When emulsified asphalt is to be applied, the rate of application and type must be shown on the plans.
5) When fertilizer is designated on the plans, the type of fertilizer analysis and rate of application must be shown on the plans.

OPTIONAL REQUIREMENTS
None

PAYMENT DESCRIPTION UNITS
1) "Backfill (Type Specified)" STA

REFERENCE ITEMS
(162, 166, 204, 300)

Go to Top

150 - BLADING

SPECIFICATION REQUIREMENTS
1) Limits of work can be shown on the plans or can be as directed by the Engineer.

OPTIONAL REQUIREMENTS
None

PAYMENT DESCRIPTION UNITS
1) "Blading" STA, HR
2) "Blading (Erosion Control)" STA, HR

REFERENCE ITEMS
None

Go to Top

152 -ROAD GRADER WORK

SPECIFICATION REQUIREMENTS
1) Limits must be shown on the plans.
2) Minimum length of "Road Grader Work" section is not less than five consecutive 100-foot stations, with exception of bridge replacement projects.
3) Type of compaction must be specified on the plans.
4) When "Ordinary Compaction" is specified, "Sprinkling" and "Rolling" will not be paid for directly, but shall be considered as subsidiary work pertaining to this Item, unless otherwise specified on the plans.
5) When "Density Control" is specified, "Sprinkling" and "Rolling" will not be paid for directly, but shall be considered as subsidiary work pertaining to this Item.

OPTIONAL REQUIREMENTS
1) If "Scraper Work" and/or "Bulldozer Work" is specified on the plans, this work will be paid for in accordance with those Items, respectively.

PAYMENT DESCRIPTION UNITS
1) "Road Grader Work (Ordinary Compaction)" STA,  SY
2) "Road Grader Work (Density Control)" STA,  SY

REFERENCE ITEMS
(110, 132)

Go to Top

154 - SCRAPER WORK

SPECIFICATION REQUIREMENTS
1) Limits of work can be shown on the plans or can be as directed by the Engineer.
2) Type of compaction must be specified on the plans.
3) When "Ordinary Compaction" is specified, "Sprinkling" and "Rolling" will not be paid for directly, but shall be considered as subsidiary work pertaining to this Item, unless otherwise specified on the plans.
4) When "Density Control" is specified, "Sprinkling" and "Rolling" will not be paid for directly, but shall be considered as subsidiary work pertaining to this Item.

OPTIONAL REQUIREMENTS
1) If "Scraper Work" and/or "Bulldozer Work" is specified on the plans, this work will be paid for in accordance with those Items, respectively.

PAYMENT DESCRIPTION UNITS
1) "Scraper Work (Ordinary Compaction)" YH
2) "Scraper Work (Density Control)" YH
3) "Scraper Work (Ordinary Compaction/Erosion Control)" YH
4) "Scraper Work (Density Control/Erosion Control)" YH

REFERENCE ITEMS
(132)

Go to Top

156 - BULLDOZER WORK

SPECIFICATION REQUIREMENTS
1) Limits of work can be shown on the plans or can be as directed by the Engineer.
2) Specify type of bulldozer to be used on the plans.
3) Type of compaction must be specified on the plans.
4) When "Ordinary Compaction" is specified, "Sprinkling" and "Rolling" will not be paid for directly, but shall be considered as subsidiary work pertaining to this Item, unless otherwise specified on the plans.
5) When "Density Control" is specified, "Sprinkling" and "Rolling" will not be paid for directly, but shall be considered as subsidiary work pertaining to this Item.

OPTIONAL REQUIREMENTS
1) If "Scraper Work" and/or "Bulldozer Work" is specified on the plans, this work will be paid for in accordance with those Items, respectively.

PAYMENT DESCRIPTION UNITS
1) "Bulldozer Work (Ordinary Compaction) (Type Specified)" HR
2) "Bulldozer Work (Density Control) (Type Specified)" HR
3) "Bulldozer Work (Ordinary Compaction/Erosion Control) (Type Specified)" HR
4) "Bulldozer Work (Density Control/Erosion Control) (Type Specified)" HR

REFERENCE ITEMS
(132)

Go to Top

158 - SPECIALIZED EXCAVATION WORK

SPECIFICATION REQUIREMENTS
1) Locations/Limits of work can be shown on the plans or can be as directed by the Engineer.
2) Specify type of equipment to be used on the plans.

OPTIONAL REQUIREMENTS
None

PAYMENT DESCRIPTION UNITS
1) "Specialized Excavation Work (Type Specified)" HR, CY
2) "Specialized Excavation Work (Erosion Control) (Type Specified)" HR, CY

REFERENCE ITEMS
(132)

Go to Top

160 - FURNISHING AND PLACING TOPSOIL

SPECIFICATION REQUIREMENTS
1) Location and depth of topsoil to be placed can be shown on the plans or can be as directed by the Engineer.
2) The approximate quantity of topsoil to be salvaged from the project will be shown on the plans.
3) "Rolling" and "Sprinkling" will not be paid for directly, but considered subsidiary to this Item, unless otherwise shown on the plans.

OPTIONAL REQUIREMENTS
None

PAYMENT DESCRIPTION UNITS
1) "Furnishing and Placing Topsoil (Measurement Class Specified) (Depth Specified)" STA (Class 1), SY (Class 2), CY (Class 3, 4 or 5)

REFERENCE ITEMS
(204)

Go to Top

162 - SODDING FOR EROSION CONTROL

SPECIFICATION REQUIREMENTS
1) Areas to receive sodding can be shown on the plans or can be as directed by the Engineer.
2) Specify type of sodding to be used on the plans.
3) The rate of application of water can be shown on the plans or can be as directed by the Engineer and will be paid for in accordance with Item 168.
4) Type of fertilizer analysis and rate of application must be shown on the plans.

OPTIONAL REQUIREMENTS
None

PAYMENT DESCRIPTION UNIT
1) "Spot Sodding (Type Specified)" SY
2) "Block Sodding" SY
3) "Grass Retards" SY
4) "Straw or Hay Mulch" SY
5) "Mulch Sodding" SY, CY

REFERENCE ITEMS
(166, 300)

Go to Top

164 - SEEDING FOR EROSION CONTROL

SPECIFICATION REQUIREMENTS
1) Seeding will be distributed over the areas shown on the plans or where directed by the Engineer.
2) The rate of application of water can be shown on the plans or can be as directed by the Engineer and will be paid for in accordance with Item 168.
3) Type of fertilizer analysis and rate of application must be shown on the plans. Fertilizer will not be paid for directly, but will be considered subsidiary unless otherwise shown on the plans.

OPTIONAL REQUIREMENTS
1) Soil Retention Blanket will be paid for under Item 169, "Soil Retention Blanket".

PAYMENT DESCRIPTION UNITS
1) "Broadcast Seeding (Temporary) (Warm or Cool)" SY, AC
"Broadcast Seeding (Temporary) (Cool) (Legume)" SY, AC
"Broadcast Seeding (Permanent) (Urban or Rural) (Clay or Sand)" SY, AC
2) "Cellulose Fiber Mulch Seeding (Temporary) (Warm or Cool)" SY, AC
"Cellulose Fiber Mulch Seeding (Temporary) (Cool) (Legume)" SY, AC
"Cellulose Fiber Mulch Seeding (Permanent) SY, AC
(Urban or Rural) (Clay or Sand)"
3) "Straw or Hay Mulch Seeding (Temporary) (Warm or Cool)" SY, AC
"Straw or Hay Mulch Seeding (Temporary) (Cool) (Legume)" SY, AC
"Straw or Hay Mulch Seeding (Permanent) SY, AC
(Urban or Rural) (Clay or Sand)"
4) "Drill Seeding (Temporary) (Warm or Cool)" SY, AC
"Drill Seeding (Temporary) (Cool) (Legume)" SY, AC
"Drill Seeding (Permanent) (Urban or Rural) (Clay or Sand)" SY, AC
5) "Straw or Hay Mulching" SY, AC
"Standard Seeding for Cool Season Temporary Erosion Control" SY, AC
"Standard Seeding for Warm Season Temporary Erosion Control" SY, AC
"Legume Seeding for Temporary Erosion Control" SY, AC

REFERENCE ITEMS
(166, 169, 300)

Go to Top

166 - FERTILIZER

SPECIFICATION REQUIREMENTS
1) Areas to be fertilized must be shown on the plans.
2) Type of fertilizer analysis and rate of application must be shown on the plans.

OPTIONAL REQUIREMENTS
None

PAYMENT DESCRIPTION UNITS
1) "Fertilizer (Analysis Specified)" TON

REFERENCE ITEMS
None

Go to Top

168 - VEGETATIVE WATERING

SPECIFICATION REQUIREMENTS
1) Areas to be watered must be shown on the plans or can be as directed by the Engineer.
2) The rate of application can be shown on the plans or can be as directed by the Engineer.

OPTIONAL REQUIREMENTS
None

PAYMENT DESCRIPTION UNITS
1) "Vegetative Watering" MG

REFERENCE ITEMS
None

Go to Top

169 - SOIL RETENTION BLANKET

SPECIFICATION REQUIREMENTS
1) Areas of placement can be shown on the plans or as directed by the Engineer.

OPTIONAL REQUIREMENTS
None

PAYMENT DESCRIPTION UNITS
1) "Soil Retention Blanket (Class Specified) (Type Specified)" SY

REFERENCE ITEMS
None

Go to Top

170 - IRRIGATION SYSTEM

SPECIFICATION REQUIREMENTS
1) Requirements for miscellaneous accessories must be shown on the plans.
2) Limits and/or locations of work must be shown on the plans.
3) Size of pipe and fittings must be shown on the plans.
4) Location of sprinkler heads must be shown on the plans.
5) All boring locations (if needed) must be shown on the plans.
6) When allowed on the plans, all jetting operation locations must be shown.
7) Locations for pipe encasement (if needed) must be shown on the plans.
8) Protection methods for excavations greater than 5 feet in depth will be paid for as required under "Trench Excavation Protection" or "Temporary Special Shoring".

OPTIONAL REQUIREMENTS
1) Protection methods for excavations greater than 5 feet in depth will be paid for as required under Item 402, "Trench Excavation Protection" or Item 403, "Temporary Special Shoring".

PAYMENT DESCRIPTION UNITS
1) "Irrigation System" LS

REFERENCE ITEMS
None

Go to Top

180 - WILDFLOWER SEEDING

SPECIFICATION REQUIREMENTS
1) The amount and type of seed planting must be shown on the plans.
2) Seed will be sown in rates based on pure live seed (PLS) per acre as shown on the plans and will be distributed over the areas shown on the plans or where directed by the Engineer.

OPTIONAL REQUIREMENTS
None

PAYMENT DESCRIPTION UNITS
1) "Wildflower Seeding" AC

REFERENCE ITEMS
None

Go to Top

192 - ROADSIDE PLANTING AND ESTABLISHMENT

SPECIFICATION REQUIREMENTS
1) Location and size of plants must be shown on the plans.
2) Ball sizes for "Balled or Burlapped Stock", "Collected Stock", and/or "Bag Grown Stock" must be shown on the plans.
3) Approved minimum root spread and condition for "Bare Root Stock" must be as shown on the plans.
4) Backfill material will be mixed in proportions shown on the plans.
5) Plant supports will be of the type shown on the plans and/or as directed by the Engineer.
6) Tree wrapping will be of the type shown on the plans.
7) Pesticides, including herbicides, must be of the types shown on the plans.
8) Type of fertilizer analysis, frequency and rate of application must be shown on the plans.
9) Areas to be mowed or trimmed, mowing heights and frequency must be shown on the plans.
10) For plant replacement (if needed), the plants replaced will be of the species and sizes as shown on the plans and will be replaced according to the placement and backfilling details shown on the plans.

OPTIONAL REQUIREMENTS
1) When an irrigation system is specified, it will be paid for in accordance with Item 170.

PAYMENT DESCRIPTION UNITS
1) "Plant Type and Size as Specified" EA

REFERENCE ITEMS
(166, 168)

Go to Top

193 - LANDSCAPE MAINTENANCE

SPECIFICATION REQUIREMENTS
1) Locations and/or areas for landscape maintenance can be shown on the plans or can be as directed by the Engineer.
2) Pesticides, including herbicides, must be of the types shown on the plans.
3) Type of fertilizer analysis, frequency and rate of application must be shown on the plans.
4) Areas to be mowed or trimmed, mowing heights and frequency must be shown on the plans.
5) Plant supports will be of the type shown on the plans and/or as directed by the Engineer.
6) For plant replacement (if needed), the plants replaced will be of the species and sizes as shown on the plans and will be replaced according to the placement and backfilling details shown on the plans.
7) Areas to be watered and rates of application can be shown on the plans or can be as directed by the Engineer if irrigation system is not available.
8) The existing condition of the irrigation system and any known deficiencies must be shown on the plans.

OPTIONAL REQUIREMENTS
1) When "Landscape Maintenance" is used in conjunction with Item 192, all work is to be accomplished subsequent to the work shown in Item 192.

PAYMENT DESCRIPTION UNITS
1) "Plant Maintenance" MO
2) "Plant Replacement (Plant Species and Size Specified)" EA
3) "Vegetative Watering" MG
4) "Irrigation System Operation and Maintenance" MO

REFERENCE ITEMS (166, 168, 192)

Go to Top