Division IV - Structures (Items 472 through 498)
Table Of Contents
ITEM NO. - TITLE AND REQUIREMENTS
472 - REMOVING AND RELAYING
CULVERT AND STORM SEWER PIPE
SPECIFICATION REQUIREMENTS
1) Locations must be shown on the plans.
OPTIONAL REQUIREMENTS
1) When required, protection methods for excavations greater than five (5) feet
in depth will be measured and paid for as required under Item 402, "Trench
Excavation Protection" or Item 403, "Temporary Special Shoring".
2) When corrugated metal pipe is required, it will be in accordance with Item
460.
3) When reinforced concrete pipe is required, it will be in accordance with Item
464.
|
PAYMENT DESCRIPTION |
UNITS |
1) |
"Removing and Relaying Culvert Pipe
18 inch Diameter and Under" |
LF |
2) |
"Removing and Relaying Culvert Pipe Over
18 inch Diameter" |
LF |
3) |
"Removing and Relaying Storm Sewer Pipe
(Size Specified)" |
LF |
REFERENCE ITEMS
(400)
Go to Top
473 - LAYING CULVERT AND
STORM SEWER PIPE
SPECIFICATION REQUIREMENTS
1) Locations must be shown on the plans.
OPTIONAL REQUIREMENTS
1) When required, protection methods for excavations greater than five (5) feet
in depth will be measured and paid for as required under Item 402, "Trench
Excavation Protection" or Item 403, "Temporary Special Shoring".
2) When corrugated metal pipe is required, it will be in accordance with Item
460.
3) When reinforced concrete pipe is required, it will be in accordance with Item
464.
|
PAYMENT DESCRIPTION |
UNITS |
1) |
"Laying Pipe (Size
Specified)" |
LF |
REFERENCE ITEMS
(400)
Go to Top
474 - SLOTTED DRAIN
SPECIFICATION REQUIREMENTS
1) Permissible corrugation must be shown on the plans.
2) This is a plans quantity measurement Item.
OPTIONAL REQUIREMENTS
None
|
PAYMENT DESCRIPTION |
UNITS |
1) |
"Slotted Drain (Pipe Diameter
Specified)" |
LF |
2) |
"Slotted Drain Outfall (Pipe Diameter
Specified)" |
LF |
REFERENCE ITEMS
(400, 445, 460)
Go to Top
476 - JACKING, BORING OR
TUNNELING PIPE
SPECIFICATION REQUIREMENTS
1) Specify the type of pipe to be used when jacking, boring or tunneling pipe on the plans.
2) This is a plans quantity measurement Item.
OPTIONAL REQUIREMENTS
1) When required, protection methods for excavations greater than five (5) feet
in depth will be measured and paid for as required under Item 402, "Trench
Excavation Protection" or Item 403, "Temporary Special Shoring".
2) When corrugated metal pipe is being jacked, bored or tunneled, it will be in
accordance with Item 460.
3) When reinforced concrete pipe is being jacked, bored or tunneled, it will be
in accordance with Item 464.
|
PAYMENT DESCRIPTION |
UNITS |
1) |
"Jacking or Boring Pipe (Type
Specified) (Size Specified) (Strength or Design Specified)" |
LF |
2) |
"Jacking, Boring or Tunneling Pipe (Type
Specified) (Size Specified) (Strength or Design Specified)" |
LF |
REFERENCE ITEMS
None
Go to Top
479 - ADJUSTING MANHOLES AND
INLETS
SPECIFICATION REQUIREMENTS
1) Adjusted to positions and/or elevations as shown on the plans.
2) Capping details must be shown on the plans.
OPTIONAL REQUIREMENTS
None
|
PAYMENT DESCRIPTION |
UNITS |
1) |
"Adjusting Manholes" |
EA |
2) |
"Adjusting Inlets" |
EA |
3) |
"Adjusting Manholes and Inlets" |
EA |
REFERENCE ITEMS
(400, 465)
Go to Top
480 - CLEANING EXISTING
CULVERTS
SPECIFICATION REQUIREMENTS
1) Locations must be shown on the plans.
OPTIONAL REQUIREMENTS
None
|
PAYMENT DESCRIPTION |
UNITS |
1) |
"Cleaning Existing Culverts" |
CY |
REFERENCE ITEMS
None
Go to Top
481 - PVC PIPE FOR BRIDGE
DRAINS
SPECIFICATION REQUIREMENTS
1) Locations of PVC pipe must be shown on the plans.
2) The sizes and types of PVC pipe must be shown on the plans.
OPTIONAL REQUIREMENTS
None
|
PAYMENT DESCRIPTION |
UNITS |
1) |
"PVC Pipe (Size Specified) (Type
Specified)" |
LF |
REFERENCE ITEMS
(400)
Go to Top
483 - SCARIFYING CONCRETE
BRIDGE SLAB
SPECIFICATION REQUIREMENTS
1) Depth must be shown on the plans.
2) Locations and/or areas must be shown on the plans.
OPTIONAL REQUIREMENTS
None
|
PAYMENT DESCRIPTION |
UNITS |
1) |
"Scarifying Concrete Bridge Slab" |
SY |
REFERENCE ITEMS
None
Go to Top
485 - WET
SANDBLASTING
SPECIFICATION REQUIREMENTS
1) Any change in sand particle size must be shown on the plans.
OPTIONAL REQUIREMENTS
None
PAYMENT AND MEASUREMENT
Subsidiary to the various bid items in the contract.
REFERENCE ITEMS
None
Go to Top
490 - TIMBER STRUCTURES
SPECIFICATION REQUIREMENTS
1) Lumber and piling for timber structures will be "treated" or
"untreated" as shown on the plans.
2) Timber caps will be secured to the posts or piling with the details shown on the plans.
3) Sway bracing will be connected to the cap and all piling or posts as shown on the plans.
4) Stringers may have butt joints or lapped joints as shown on the plans.
5) Wheel guards will be constructed on each side of the roadway as shown on the plans.
6) Bolts, washers and dowels will be of the size and type shown on the plans.
OPTIONAL REQUIREMENTS
None
PAYMENT AND MEASUREMENT
Subsidiary to the various bid items in the contract.
REFERENCE ITEMS
(491, 492, 445, 446)
Go to Top
491 TIMBER FOR STRUCTURES
SPECIFICATION REQUIREMENTS
1) Details must be shown on the plans.
OPTIONAL REQUIREMENTS
1) When treated material is used, it will be in accordance with Item 492.
|
PAYMENT DESCRIPTION |
UNITS |
1) |
"Treated Timber" |
MFBM |
2) |
"Untreated Timber" |
MFBM |
REFERENCE ITEMS
(490)
Go to Top
492 - TIMBER PRESERVATIVE AND
TREATMENT
SPECIFICATION REQUIREMENTS
1) Any change in preservative or retention must be shown on the plans.
OPTIONAL REQUIREMENTS
None
PAYMENT AND MEASUREMENT
Subsidiary to the various bid items in the contract.
REFERENCE ITEMS
None
Go to Top
495 - RAISING EXISTING
STRUCTURES
SPECIFICATION REQUIREMENTS
1) Location of structure(s) to be raised must be shown on the plans.
OPTIONAL REQUIREMENTS
1) When metal pedestals are allowed, they will be in accordance with Items 442
and 448.
2) When concrete pedestals are allowed, they will be in accordance with Items
420, 421, 435, 440, 520, 524 and 526.
|
PAYMENT DESCRIPTION |
UNITS |
1) |
"Raising Existing Structure" |
LS |
REFERENCE ITEMS
None
Go to Top
496 - REMOVING OLD STRUCTURES
SPECIFICATION REQUIREMENTS
1) Location of structure(s) to be removed must be shown on the plans.
OPTIONAL REQUIREMENTS
1) When portions of existing structure are to remain in place, it will be in
accordance with Item 430.
2) When steel material is sold to the Contractor, it will be in accordance with
Item 497.
|
PAYMENT DESCRIPTION |
UNITS |
1) |
"Removing Old Structure (Large)" |
EA |
2) |
"Removing Old Structure (Small)" |
EA |
3) |
"Removing Old Structure (Pipe)" |
EA, LF |
REFERENCE ITEMS
None
Go to Top
497 - DISPOSAL OF SALVAGEABLE
MATERIAL
SPECIFICATION REQUIREMENTS
1) Quantity to be shown on the plans.
OPTIONAL REQUIREMENTS
1) When material sold to the Contractor is removed under this Item, it will be
in accordance with
Items 430 and 496.
|
PAYMENT DESCRIPTION |
UNITS |
1) |
"Salvaged Material (Credit Item)" |
LS |
REFERENCE ITEMS
None
Go to Top
498 - PLANT INSPECTION
LABORATORY (EQUIPPED)
SPECIFICATION REQUIREMENTS
1) As shown in the specification.
OPTIONAL REQUIREMENTS
None
PAYMENT AND MEASUREMENT
Subsidiary to the various bid items in the contract.
REFERENCE ITEMS
(504)
Go to Top
|