1993 Statewide Special Specifications
(Items 1000 to 3637)
Last Updated (03/10/2004)
Click here to return to Index Page
Table of Contents
ITEM NO. - TITLE AND REQUIREMENTS
1000 -
PLANTING BED PREPARATION
SPECIFICATION REQUIREMENTS
1) The location and/or areas
for the preparation of planting beds can be shown on the plans or as specified
by the Engineer.
2) The details for the preparation
of planting beds can be shown on the plans and as noted within the General
Notes and Specifications, or as specified by the Engineer.
OPTIONAL REQUIREMENTS
None
|
PAYMENT DESCRIPTION |
UNITS |
1) |
"Planting Bed
Preparation" |
SF, SY, LS |
REFERENCE ITEMS
None Go to Top 1002 -
VEGETATION BARRIER SPECIFICATION REQUIREMENTS
1) The location and/or area
for installing a ground cover fabric as a vegetation barrier can be shown
on the plans or as
designated by the Engineer.
2) The details for the installation
of the vegetation barrier can be shown on the plans and as noted
within the General Notes and
Specifications, or as specified by the Engineer.
OPTIONAL REQUIREMENTS
None
|
PAYMENT DESCRIPTION |
UNITS |
1) |
"Vegetation
Barrier" |
SF, SY, LS |
REFERENCE ITEMS
None Go to Top 1003 -
SEEDLING PLANTING SPECIFICATION REQUIREMENTS
1) The areas/locations for
seedling planting can be shown on the plans or as designated by the Engineer.
2) Seedlings shall be planted
and spaced over the designated areas in quantities shown on the plans
or as directed by the Engineer.
OPTIONAL REQUIREMENTS
None
|
PAYMENT DESCRIPTION |
UNITS |
1) |
"Seedling Planting" |
AC |
REFERENCE ITEMS
None Go to Top 1058 - COMPOST SPECIFICATION REQUIREMENTS
1) Designated areas to receive
compost material.
2) The type of composted
material shall be shown on the plans.
3) Show depth specified for all
measurements except for measurement by the cubic yard.
OPTIONAL REQUIREMENTS
1) "Rolling" and "Sprinkling"
will not be paid for directly, but shall be considered subsidiary to this
Item, unless otherwise
shown on the plans.
|
PAYMENT DESCRIPTION |
UNITS |
1) |
"Compost Manufactured
Topsoil (BOS) |
STA, along baseline |
|
(Depth Specified)" |
SY,
complete in place |
2) |
"Compost Manufactured
Topsoil (PB) |
CY in vehicles at |
|
(Depth Specified)" |
the point of delivery |
3) |
"Erosion Control
Compost (ECC) (Depth Specified)" |
|
4) |
"General Use
Compost (GUC) (Depth Specified)" |
|
REFERENCE ITEMS
None Go to Top
1059 - COMPOST/MULCH FILTER BERM SPECIFICATION REQUIREMENTS
1) The areas/locations for
compost/mulch berm shall be shown on the plans.
2) Show on the plans the berm type: compost filter
berm or mulch filter berm.
3)
Pay for removal of accumulated sediment deposits under Special Specification, "Earthwork for Erosion Control."
OPTIONAL REQUIREMENTS
None
|
PAYMENT DESCRIPTION |
UNITS |
1) |
"Compost Filter Berm" |
CY |
2) |
"Mulch Filter Berm" |
CY |
REFERENCE ITEMS
(1058, 5012) Go to Top 1201 - 12 INCH LED TRAFFIC SIGNAL LAMP
UNIT
SPECIFICATION REQUIREMENTS
1) The locations for 12 Inch LED (light emitting diode) traffic signal lamp unit will be noted
on the plans.
2) The LED traffic signal lamp unit shall be designed to retrofit existing traffic signal housings built
to ITE Vehicle Traffic Signal Head Standards without the use of any special tools.
OPTIONAL REQUIREMENTS
None
|
PAYMENT DESCRIPTION |
UNITS |
1) |
"12 Inch LED Traffic Signal Lamp Unit (Color and Type Specified)"
|
EA |
REFERENCE ITEMS
(682) Go to Top 1619
- TRAY CABLE
SPECIFICATION REQUIREMENTS
1) The location for tray cable will be noted on the plans.
2) This is a plans quantity measurement item.
OPTIONAL REQUIREMENTS
None
|
PAYMENT DESCRIPTION |
UNITS |
1) |
"Tray Cable (Type and Size Specified)" |
FT |
REFERENCE ITEMS
None
Go to Top 2003
- CEMENT TREATMENT FOR BASE (DRIVEWAYS, OVERFLOW AREAS, ETC.)
SPECIFICATION REQUIREMENTS
1) Entire area over which
completed stabilized mixture to be spread shall be shown on the plans.
2) Quality of cement per
cubic yard or ton of base shall be shown on the plans.
3) Type of flexible base
material and required haul, as applicable, shall be shown on the plans
and paid
for under the applicable bid Item(s).
4) Excavation necessary
to prepare the subgrade for stabilized base will be shown on the plans and paid
for under the pertinent bid Item(s).
OPTIONAL REQUIREMENTS
None
|
PAYMENT DESCRIPTION |
UNITS |
1) |
"Cement Treatment
for Base" |
CWT, BBL |
REFERENCE ITEMS
(421) Go to Top 2004 - PLACING FLEXIBLE BASE (RECLAIMED ASPHALTIC PAVEMENT) SPECIFICATION REQUIREMENTS
1) Shall be constructed
in conformity with the typical sections shown on the plans.
2) Stockpile locations for
asphaltic materials shall be shown on the plans.
OPTIONAL REQUIREMENTS
None
|
PAYMENT DESCRIPTION |
UNITS |
1) |
"Placing Flexible
Base (Reclaimed Asphaltic Pavement) (Class Specified)" |
CY (Class I)
or CY(Class II) |
REFERENCE ITEMS
(251) Go to Top
2028 -
LIME-FLY ASH (LFA) OR FLY ASH (FA) TREATMENT FOR
MATERIALS IN PLACE
SPECIFICATION REQUIREMENTS
1) Material shall be placed
to the lines, grades, thickness(es) and typical cross section(s) shown
on the plans.
2) The percent lime and/or
fly ash to be added to the material specified for treatment must be shown
on the plans.
3) Contractor shall select,
from the types shown on the plans, and prior to construction, the type
of lime to be used.
OPTIONAL REQUIREMENTS
1) When shown on the plans
or directed by the Engineer, proof rolling will be paid for in accordance
with Item 216, "Rolling (Proof)".
|
PAYMENT DESCRIPTION |
UNITS |
1) |
"Lime (Type
Specified)" |
TON |
2) |
"Fly Ash" |
TON |
3) |
"LFA Treated
Subgrade (Compaction Method Specified) (Depth Specified)" |
SY |
4) |
"LFA Treated
Existing Subbase (Compaction Method Specified) (Depth Specified)" |
SY |
5) |
"LFA Treated
Existing Base (Compaction Method Specified) (Depth Specified)" |
SY |
6) |
"FA Treated
Subgrade (Compaction Method Specified) (Depth Specified)" |
SY |
7) |
"FA Treated
Existing Subbase (Compaction Method Specified) (Depth Specified)" |
SY |
8) |
"FA Treated
Existing Base (Compaction Method Specified) (Depth Specified)" |
SY |
REFERENCE ITEMS
(204, 264, 300, 520) Go to Top 3020 -
SAWED JOINTS SPECIFICATION REQUIREMENTS
1) Limits and/or locations
for sawed joints in existing concrete slabs can be shown on the plans
or as directed by the Engineer.
2) The depth of the sawed
cut shall be one inch, unless otherwise shown on the plans.
OPTIONAL REQUIREMENTS
None
|
PAYMENT DESCRIPTION |
UNITS |
1) |
"Sawed Joints
(Depth Specified)" |
LF |
REFERENCE ITEMS
None Go to Top 3024 -
WATERPROOFING JOINTS IN CONCRETE PAVEMENT SPECIFICATION REQUIREMENTS
1) Limits and/or locations
must be shown on the plans or as directed by the Engineer.
2) Spalls shall be repaired
using Asphaltic Concrete materials approved by the Engineer, unless
otherwise shown on the plans.
OPTIONAL REQUIREMENTS
None
|
PAYMENT DESCRIPTION |
UNITS |
1) |
"Waterproofing
Pavement Joints (Width Specified)" |
LF |
REFERENCE ITEMS
None Go to Top 3031 -
FABRIC JOINT SEAL SPECIFICATION REQUIREMENTS
1) Limits, areas and/or
locations must be shown on the plans.
OPTIONAL REQUIREMENTS
None
|
PAYMENT DESCRIPTION |
UNITS |
1) |
"Fabric Joint
Underseal (Width Specified)" |
LF |
REFERENCE ITEMS
None Go to Top 3092 - CRUMB RUBBER MODIFIED (CRM) HOT MIX ASPHALTIC CONCRETE PAVEMENT
SPECIFICATION REQUIREMENTS
1) Limits, areas and/or
locations must be shown on the plans.
2) Specify if construction
consists of a level-up course, a surface course, or any combination
of these courses.
3) The width and depth of
these courses must be shown on the typical section(s).
4) The type of CRM hot mix
asphaltic concrete pavement, as shown in Table 2, must be shown
on the plans.
5) The rate of application
of CRM hot mix asphaltic concrete pavement must be shown on the plans.
6) The polish value of the
coarse aggregate used in the surface course of the travel lanes must be
shown on the plans.
7) Unless otherwise shown
on the plans, air void control shall be required for all mixtures.
OPTIONAL REQUIREMENTS
1) The paving mixtures shall
consist of a uniform mixture of aggregate, hot asphalt-rubber, and
additives if allowed or required.
2) When Antistripping Agents
are required, they will be in accordance with Item 301.
|
PAYMENT DESCRIPTION |
UNITS |
1) |
"Crumb Rubber Modified Asphaltic
Concrete (Type Specified)" |
TON, CY |
REFERENCE ITEMS
(300, 520, 5591) Go to Top 3118
ASPHALTIC CONCRETE SURFACE REHABILITATION (WITHOUT NEW ASPHALTIC CONCRETE MATERIAL)
SPECIFICATION REQUIREMENTS
1) Limits, areas and/or
locations must be shown on the plans.
2) The pavement surface
shall be evenly heated, scarified and reworked to the widths and depths
shown on the plans.
3) The depth of the hot
mix asphaltic concrete overlay must be shown on the plans and shall be
immediately applied on top of the compacted rehabilitated material.
4) If a testing laboratory
is required, it shall meet the requirements shown on the plans.
5) If an asphalt recycling
agent is required, the application rate shall be based on the laboratory
tests on the pavement samples and shall be applied
uniformly to the scarified material prior to mixing and leveling.
6) Measurement and payment
of the hot mix asphaltic concrete shall be in accordance with Special
Specification, "Quality Control/Quality Assurance of Hot Mix Asphalt".
OPTIONAL REQUIREMENTS
1) When required, scarified
material shall be blended with an asphalt recycling agent.
|
PAYMENT DESCRIPTION |
UNITS |
1) |
"Asphaltic Concrete
Surface Rehabilitation (Without New |
|
|
Asphaltic
Concrete Material) (Depth Specified)" |
SY |
2) |
"Recycling Agent" |
GAL |
REFERENCE ITEMS
(300, 340, 3116) Go to Top 3126
- REINFORCEMENT MESH FOR JOINT REPAIR SPECIFICATION REQUIREMENTS
1) Limits, locations and/or
areas to receive the reinforcement mesh must be shown on the plans.
2) Details for the placement
of reinforcement mesh must be shown on the plans.
3) Type of reinforcement
mesh must be shown on the plans.
4) Specify the width of
the reinforcement mesh on the plans when the measurement is by linear feet.
OPTIONAL REQUIREMENTS
None
|
PAYMENT DESCRIPTION |
UNITS |
1) |
"Reinforcement
Mesh for Joint Repair (Type Specified)" |
SY |
2) |
"Reinforcement
Mesh for Joint Repair (Type Specified) (Width Specified)" |
LF |
REFERENCE ITEMS
(3116) Go to Top 3127 - COLD
POUR CRACK SEALING SPECIFICATION REQUIREMENTS
1) Locations for cold pour
crack sealing shall be performed as specified in the General Notes and
Specification Data Sheets.
2) The cracks will be cleaned
to the depth specified in the General Notes and Specification Data Sheets.
3) The average daily workload
shall be specified in the General Notes and Specification Data Sheets.
OPTIONAL REQUIREMENTS
None
|
PAYMENT DESCRIPTION |
UNITS |
1) |
"Crack Sealing" |
GAL |
REFERENCE ITEMS
None Go to Top 3138
- MICRO-SURFACING (POLYMER MODIFIED) SPECIFICATION REQUIREMENTS
1) Limits, areas and/or
locations must be shown on the plans.
2) The width of the micro-surfacing
work must be shown on the typical section(s).
3) The grade specified for
micro-surfacing must be shown on the plans.
4) The rate of application
of micro-surfacing must be shown on the plans.
OPTIONAL REQUIREMENTS
1) When approved by the
Engineer, Hydrated Lime may be used and will be in accordance with Item
264.
|
PAYMENT DESCRIPTION |
UNITS |
1) |
"Micro-Surfacing (Polymer
Modified) (Grade Specified)" |
TON |
REFERENCE ITEMS
(520, 524) Go to Top 3146
- QUALITY CONTROL/QUALITY ASSURANCE OF HOT MIX ASPHALT SPECIFICATION REQUIREMENTS
1) Limits, areas and/or
locations must be shown on the plans.
2) Specify if construction
consists of a base course, a level-up course, a surface course, or a combination
of these courses.
3) Width and depth of these
courses must be shown on the typical section(s).
4) Type and rate of application
of hot mix asphalt must be shown on the plans.
5) The asphalt material
used for the paving mixture shall be of the grade shown on the plans.
6) The approximate asphalt
material content and asphalt cement properties will be shown on the plans
when the use of state-owned RAP sources are shown on the plans or designated for
use in a Special Provision and made available for the
Contractor to use.
7) Any unused state-owned
RAP material will remain the property of the state and will be returned
to the stockpile as directed by the Engineer.
8) Unless otherwise shown
on the plans, ride quality will be required in accordance with Special
Specification, "Ride Quality for Pavement Surfaces"
OPTIONAL REQUIREMENTS
1) When required, Antistripping
Agents will be in accordance with Item 301.
|
PAYMENT DESCRIPTION |
UNITS |
1) |
"Hot Mix (Type
Specified)" |
TON, CY |
REFERENCE ITEMS
(300, 520, 5880) Go to Top 3157 - COLD
PROCESSED-RECYCLED PAVING MATERIAL (RPM)
FOR USE AS AGGREGATE BASE COURSE
SPECIFICATION REQUIREMENTS
1) Courses shall be constructed
in accordance with details as shown on the plans.
2) Prior to delivery of
the Cold Processed - RPM, the subgrade of existing road bed shall be shaped
to conform to the typical sections shown on the plans or established by the
Engineer.
OPTIONAL REQUIREMENTS
None
|
PAYMENT DESCRIPTION |
UNITS |
1) |
"Cold Processed-Recycled
Materials" |
TON, CY |
REFERENCE ITEMS
(216, 247, 300, 520) Go to Top 3175
- STONE MATRIX ASPHALTIC CONCRETE PAVEMENT
SPECIFICATION REQUIREMENTS
1) Courses shall be shown on the plans.
2) Surface aggregate classification shall be as shown on the
plans. Unless otherwise shown on the plans, surface aggregate classification requirement(s) shall apply only to the
coarse aggregate on the surface course of the travel
lanes.
3) Cellulose Fiber shall be of the type shown on the plans.
4) Required additives must be shown on the plans.
5) When use of a material feeding system is required, it
shall meet the storage capacity, remixing capability and
other requirements shall be shown on the plans.
6) In-Place compaction control and air void control
required, unless otherwise shown on the plans.
7) Required roadway specimens obtained by Contractor at
Contractors expense, unless otherwise shown on the
plans.
8) Ride Quality in accordance with Special Specification,
"Ride Quality for Pavement Surfaces", is required, unless
otherwise shown on the plans.
9) A test strip off the Right of Way will be required for
each proposed mix design, unless otherwise shown on the
plans.
10) One test strip for each proposed mix design will not be
measured for payment, unless otherwise shown on the
plans.
11) Fine aggregate shall
be supplied from sources whose coarse aggregate meets the magnesium sulfate
soundness loss requirements of this specification, unless otherwise shown on the
plans.
12) The mineral filler shall
meet the gradation requirements as shown in this specification, unless
otherwise shown on the plans.
13) Aggregate sampling during
delivery to plant or from stockpile, unless otherwise shown on the plans.
14) Asphalt cement shall
be PG 70-22, unless otherwise shown on the plans.
15) Contractor may use lime
to reduce moisture susceptibility of aggregate, unless otherwise shown
on the plans.
16) Cellulose fiber shall
be used at a rate of 0.3% by weight, unless otherwise shown on the plans.
17) The blend of aggregates
shall conform to the limits of the master grading shown in Table 2, unless
otherwise shown on the plans.
18) The mixture of aggregate,
asphalt, cellulose fiber and additives shall be evaluated in the design
stage for moisture susceptibility, unless otherwise shown
on the plans.
19) Mixing Plant equipment
changeable specifications: See Subarticle 4. (2) Mixing Plants, unless
otherwise shown on the plans.
20) Equipment to transfer
material from the hauling units or the roadbed to the
spreading and finishing machine is allowed, unless otherwise shown on the plans.
21) Fine aggregate stockpiles
may contain up to 20% by weight coarse aggregate, unless otherwise shown
on the plans.
22) Overnight storage of
mix will not be permitted, unless otherwise shown on the plans.
23) Mixture may contain
a maximum of 1% moisture by weight, unless otherwise shown on the plans.
24) Dispatching of delivery
vehicles to allow placement and completion of compaction
during daylight hours, unless otherwise shown on the plans.
25) Windrow dumping and
pick-up for placement of material into finishing machine with
windrow pick-up equipment will be allowed, unless otherwise shown on the plans.
OPTIONAL REQUIREMENTS
1) When required, Antistripping
Agents will be in accordance with Item 301.
2) Additional test requirements
affecting the quality of individual materials or the
paving mixture will be required, when shown on the plans.
3) Certain types of fine
aggregate may be allowed, required or prohibited, when specified on the
plans.
4) Measuring device for
adding mineral filler shall be tied into the automatic plant controls so
that the supply
of mineral filler will be automatically adjusted to plant production and
provide a consistent percentage to the mixture, when
shown on the plans.
5) Optional controls in
plant control room allowing manual control of mineral filler feed rates,
may be required, when shown on the plans.
6) Additional/alternate
placement surface temperatures, may be required, when shown on the plans.
|
PAYMENT DESCRIPTION |
UNITS |
1) |
"Stone Matrix Asphaltic
Concrete (Specify Type)" |
TON, CY |
|
|
|
REFERENCE ITEMS
(264, 300, 520, 5880) Go to Top
3231
- POROUS FRICTION COURSE SPECIFICATION REQUIREMENTS
1) The areas/locations for
porous friction course will be in accordance with the details as shown
on the plans.
OPTIONAL REQUIREMENTS
1) When specified on the
plans, certain coarse aggregate material may be allowed, required or prohibited.
|
PAYMENT DESCRIPTION |
UNITS |
1) |
"Asphalt (Type
and/or Grade Specified)" |
TON |
2) |
"Aggregate (Type
and/or Grade Specified)" |
CY, TON |
REFERENCE ITEMS
(300, 520) Go to Top
3241
- SUPERPAVE HOT MIX ASPHALT CONCRETE PAVEMENT (SPHMACP) SPECIFICATION REQUIREMENTS
1) The areas/locations for
Superpave Hot Mix Asphalt Concrete Pavement (SHMACP) will be
as shown on the plans.
OPTIONAL REQUIREMENTS
1) When required, Antistripping
Agents will be in accordance with Item 301.
|
PAYMENT DESCRIPTION |
UNITS |
1) |
"Hot Mix (Composite
Mass)" |
TON |
2) |
"Hot Mix (Composite
Volumetric)" |
CY |
REFERENCE ITEMS
(300, 520, 5880) Go to Top
3248 - HEAVY
DUTY STONE MATRIX ASPHALTIC CONCRETE PAVEMENT (HDSMACP)
SPECIFICATION REQUIREMENTS
1) The areas/locations for
Superpave Hot Mix Asphalt Concrete Pavement (SHMACP) will be as
shown on the plans.
OPTIONAL REQUIREMENTS
1) When required, Antistripping
Agents will be in accordance with Item 301.
|
PAYMENT DESCRIPTION |
UNITS |
1) |
"Hot Mix (Composite
Mass)" |
TON |
2) |
"Hot Mix (Composite
Volumetric)" |
CY |
REFERENCE ITEMS
(300, 520, 5880) Go to Top 3249
- STONE FILLED HOT MIX ASPHALTIC CONCRETE PAVEMENT (SFHMACP)
SPECIFICATION REQUIREMENTS
1) The areas/locations for
Stone Filled Hot Mix Asphaltic Concrete Pavement (SFHMACP)
will be as shown on the plans.
OPTIONAL REQUIREMENTS
1) When required, Antistripping
Agents will be in accordance with Item 301.
|
PAYMENT DESCRIPTION |
UNITS |
1) |
"Hot Mix (Composite
Mass)" |
TON |
2) |
"Hot Mix (Composite
Volumetric)" |
CY |
REFERENCE ITEMS
(300, 520, 5880)
Go to Top
3364
- THIN BONDED PERMEABLE FRICTION COURSE (TBPFC) SPECIFICATION REQUIREMENTS
1) The areas/locations for Thin Bonded Permeable Friction Course (TBPFC)
will be as shown on the plans.
2) Minimum surface aggregate classification (SAC) for coarse
aggregate will be shown on the plans.
3) Ride Quality in accordance with Special Specification,
"Ride Quality for Pavement Surfaces."
OPTIONAL REQUIREMENTS
1) Unless otherwise shown on the plans, aggregates shall conform to the
requirements shown in Table 1 and specification.
2) Unless otherwise shown on the plans, Class B aggregate may be blended
with a Class A aggregate in order to meet requirements for Class A materials.
3) Unless the plans specify asphalt-rubber (A-R) binder, performance grade
(PG) asphalt binder and fibers will be used.
4) When shown on the plans, use the type and rate of additive specified.
5) When required add lime as an antistripping agent.
6) Unless otherwise noted on the plans, membrane material will be measured
by the volume or weight.
|
PAYMENT DESCRIPTION |
UNITS |
1) |
"TBPFC (Membrane)" |
GAL, TON |
2) |
"TBPFC (Asphalt)" |
TON |
3) |
"TBPFC (Aggregate)" |
TON |
REFERENCE ITEMS
(210, 300, 301, 504, 520, 5880)
Go to Top
3406 - PERMEABLE FRICTION COURSE
SPECIFICATION REQUIREMENTS
1)
Specify either a Performance Grade (PG) 76 binder or an
Asphalt-Rubber (A-R) binder on the set of plans.
2)
If different aggregate quality requirements (listed in
Table 1) are desired, specify on the set of plans.
3)
Specify the surface aggregate classification on the set
of plans.
4)
When requiring A-R binder, show on the set of plans if
additional requirements other than Item 300.2.I are desired.
5)
Show on the set of plans if additional requirements
other than Item 300.2.G are desired for Grade B or C of Crumb Rubber
Modifier (CRM).
6)
Show on the set of plans if a specific type and grade of
tack coat material is desired.
7)
Specify the type and rate of additives on the set of
plans, if needed.
8)
Specify on the set of plans if lime is only allowed as
antistripping agent.
9)
If Quality Control Plan (QCP) is required, specify on
the set of plan.
10)
If a test method other than Tex-204-F, Part V is
required for mixture design, specify on the set of plans.
11)
Show on the plans if the Engineer is to provide mixture
design.
12)
Specify the weather conditions favorable for paving on
the set of plans for placing the mixture.
13) If ride quality measurement other than specified
in Special Specification, Ride Quality for Pavement Surfaces is
required, specify on the set of plans.
PAYMENT DESCRIPTION |
UNITS |
1) "PFC (Asphalt) (Binder Specified)" |
TON |
2) "PFC (Aggregate) (Grade and SAC
Specified)" |
TON |
REFERENCE
ITEMS
(210), (300), (301), (504), (520), (5880)
Go to Top
3637 - COMPUTER EQUIPMENT
SPECIFICATION REQUIREMENTS
1) The locations for computer equipment will be of the type noted on
the plans.
OPTIONAL REQUIREMENTS
None
|
PAYMENT DESCRIPTION |
UNITS |
1) |
"Desktop Microcomputer" |
EA |
2) |
"Laptop Microcomputer" |
EA |
3) |
"Printer" |
EA |
4) |
"Internet Service Provider" |
EA |
REFERENCE ITEMS
None
Go to Top
|