1993 Statewide Special Specifications
(Items 7000 to 7640)
Last Updated (02/19/2004)
Click here to return to Index Page
Table Of Contents
ITEM NO. - TITLE AND REQUIREMENTS
7000 - POTHOLE REPAIR
SPECIFICATION REQUIREMENTS
1) The locations for Pothole Repair will be as directed by the Engineer.
2) The Department will furnish all materials unless otherwise specified.
Materials, when furnished
by the Department, will be at the sites designated on
the plans.
3) Materials not used which were furnished by the Department, will be returned
to the location from
which the materials were obtained upon completion of the
work.
OPTIONAL REQUIREMENTS
None
|
PAYMENT DESCRIPTION |
UNITS |
1) |
"Standard Repair, Type A" |
SY, CY |
2) |
"Saw-Cut Repair, Type B" |
SY, CY |
REFERENCE ITEMS
None
Go to Top
7002 - LITTER PICKUP AND DISPOSAL
SPECIFICATION REQUIREMENTS
1) The locations for Litter Pickup and Disposal will be as directed by the
Engineer.
2) Bagged litter shall be picked up the same day of collection unless otherwise
approved by the Engineer.
3) All whole tires shall be picked up and taken to the site(s) designated in the
General Notes and
Specification Data Sheets.
OPTIONAL REQUIREMENTS
None
|
PAYMENT DESCRIPTION |
UNITS |
1) |
"Litter Pickup and Disposal" |
AC, CY |
REFERENCE ITEMS
None
Go to Top
7004 - PICNIC AREAS
SPECIFICATION REQUIREMENTS
1) The janitorial and grounds maintenance of Picnic Areas will be as shown on
the plans.
2) Picnic area(s) shall be cleaned of all litter within the limits shown on the
plans.
3) Picnic Areas shall be mowed as designated on the plans.
4) Methods and/or directions for the removal and disposal of grass clippings,
tree clippings, leaves
and/or pine straw shall be as shown in the General Notes and
Specification Data Sheet(s).
OPTIONAL REQUIREMENTS
None
|
PAYMENT DESCRIPTION |
UNITS |
1) |
"Janitorial Maintenance" |
CYC |
2) |
"Grounds Maintenance" |
CYC, AC |
REFERENCE ITEMS
None
Go to Top
7005 - REST AREAS
SPECIFICATION REQUIREMENTS
1) The number and location of rest areas, the number of attendants, their duty
hours and other scheduled
items of work shall be as designated in the General
Notes and Specification Data Sheet(s). Work
performed under this Item shall be done seven (7) days a week,
including holidays.
2) Attendants shall not perform grounds maintenance while responsible for
janitorial maintenance unless
otherwise designated in the General Notes and
Specification Data Sheet(s).
3) Methods and/or directions for the removal and disposal of grass clippings,
tree clippings, leaves and/or
pine straw shall be as shown in the General Notes and
Specification Data Sheet(s).
OPTIONAL REQUIREMENTS
None
|
PAYMENT DESCRIPTION |
UNITS |
1) |
"Janitorial Maintenance" |
CYC |
2) |
"Grounds Maintenance" |
CYC or AC |
REFERENCE ITEMS
None
Go to Top
7006 - TREES, UNDERBRUSH AND SHRUBS
SPECIFICATION REQUIREMENTS
1) The locations for the removal and disposal of trees, underbrush, shrubs and
vines, the pruning and
trimming of trees and shrubs shall be as designated in
the General Notes and Specification
Data Sheet(s).
2) Those trees, shrubs and other landscape features designated by the Engineer
for preservation, shall be
carefully protected from abuse, marring or damage.
3) Any diseased and/or infected trees shall be disposed of as designated in the
General Notes and
Specification Data Sheet(s) or as directed by the Engineer.
4) All dead tree limbs shall be removed. Tree limbs extending over the pavement
shall be trimmed to the
height shown on the plans.
OPTIONAL REQUIREMENTS
None
|
PAYMENT DESCRIPTION |
UNITS |
1) |
"Tree Removal (Diameter Specified)" |
EA |
2) |
"Tree Pruning and Trimming" |
LS, STA, MI |
3) |
"Underbrush Removal and/or Shrub Trimming" |
LS, STA, MI |
REFERENCE ITEMS
None
Go to Top
7007 - STORM SEWER SYSTEM CLEANING
SPECIFICATION REQUIREMENTS
1) The locations for Storm Sewer Cleaning will be as directed by the Engineer.
2) Ability to clean pump house wells up to a 55 foot depth is required unless
otherwise approved or
directed by the Engineer.
OPTIONAL REQUIREMENTS
None
|
PAYMENT DESCRIPTION |
UNITS |
1) |
"Inlet Cleaning" |
EA |
2) |
"Well Cleaning" |
EA |
3) |
"Sump Cleaning" |
EA |
4) |
"Storm Sewer Cleaning (Diameter or Size, Specified)" |
LF |
REFERENCE ITEMS
None
Go to Top
7008 - METAL BEAM GUARD FENCE REPAIR
SPECIFICATION REQUIREMENTS
1) The locations for Metal Beam Guard Fence Repair will be as directed by the
Engineer.
2) All metal beam guard fence removed for replacement or upgrading purposes
shall be replaced
during the same workday unless otherwise approved by the
Engineer.
3) Materials furnished by the Department will be relocated at sites designated
in the General Notes
and Specification Data Sheet(s).
4) Posts shall be set plumb and firm to the line and grade shown on the plans.
OPTIONAL REQUIREMENTS
None
|
PAYMENT DESCRIPTION |
UNITS |
1) |
"Repair and/or Upgrade Rail Element" |
LF |
2) |
"Remove and replace Timber
and/or Steel Post without Concrete Foundation" |
EA |
3) |
"Remove and replace Timber and/or Steel Post with
Concrete Foundation" |
EA |
4) |
"Repair Steel Posts with Base Plate" |
EA |
5) |
"Repair Concrete Foundation of Steel Posts with Base
Plate" |
EA |
6) |
"Repair of Terminal Anchor Post" |
EA |
7) |
"Replace and/or Upgrade of Terminal Anchor
Post" |
EA |
8) |
"Repair Headlight Barrier Fencing" |
LF |
9) |
"Remove and Replace and/or Place Barrels" |
EA |
10) |
"Bridge End Connection Upgrade" |
EA |
11) |
"Remove Undamaged Guardrail" |
LF |
12) |
"Repair Guardrail Extruder Terminal System" |
EA |
REFERENCE ITEMS
(421)
Go to Top
7009 - STEEL BRIDGE MEMBER REPAIR
SPECIFICATION REQUIREMENTS
1) The locations for Steel Bridge Member Repair will be located at sites
designated in the General
Notes and Specification Data Sheet(s).
OPTIONAL REQUIREMENTS
None
|
PAYMENT DESCRIPTION |
UNITS |
1) |
"Repairing Steel Bridge Members"
|
LS |
REFERENCE ITEMS
(441, 446, 448)
Go to Top
7011 - TRAFFIC SIGNALS
SPECIFICATION REQUIREMENTS
1) The locations for Traffic Signals will be as designated in the General Notes
and Specification
Data Sheet(s).
2) All materials that are to become part of the final work will be furnished by
the Department unless
otherwise specified. A list of required materials shall be submitted to the
Department at least
24 hours in advance of the requested pickup date between the hours of 8:00 AM and 4:00 PM
at sites
designated in the General Notes and specification Data Sheet(s).
OPTIONAL REQUIREMENTS
None
|
PAYMENT DESCRIPTION |
UNITS |
1) |
"Service Poles" |
EA |
2) |
"Signal Heads" |
EA |
3) |
"Flashing Beacon Heads" |
EA |
4) |
"Pedestrians Heads" |
EA |
5) |
"Support System" |
EA |
6) |
"Complete Head Replacement" |
EA |
7) |
"Painting" |
EA |
REFERENCE ITEMS
None
Go to Top
7135 -
JANITORIAL AND/OR GROUNDS MAINTENANCE
SPECIFICATION REQUIREMENTS
1) The locations for Janitorial
and/or Grounds Maintenance shall be as described in the General
Notes and
Specification Data Sheet(s).
2) Unless otherwise specified,
vehicles shall be equipped with highly visible Omni-directional flashing
amber
lights.
3) Methods and/or directions for the
removal and disposal of grass clippings, tree clippings, leaves
and/or pine
straw shall be as shown in the General Notes and Specification Data Sheet(s).
4) Schedules for janitorial and/or grounds maintenance are designated in the
General Notes and
Specification Data Sheet(s).
OPTIONAL REQUIREMENTS
None
|
PAYMENT DESCRIPTION |
UNITS |
1) |
"Janitorial Maintenance" |
CYC |
2) |
"Grounds Maintenance" |
CYC, AC |
REFERENCE ITEMS
None
Go to Top
7153 - SNOW AND ICE CONTROL
SPECIFICATION REQUIREMENTS
1) The locations for Snow and Ice Control will be as directed by the Engineer.
2) Trucks and spreaders must be fully equipped and ready for use during the time
specified on the General
Notes and Specification Data Sheet(s).
3) The Department will not furnish transportation for any of the Contractors
equipment or operators.
4) The Contractor shall furnish the number of truck-trains as specified in the
General Notes and
Specification Data Sheet(s).
5) The trucks shall not be less than the size as specified in the General Notes
and Specification Data
Sheet(s) and shall be equipped with a working telephone.
6) Trail vehicles will be equipped with signs as shown on the General Notes and
Specification Data
Sheet(s).
7) Spreader size shall be as specified in the General Notes and
Specification Data Sheet(s).
8) Sanding materials shall be provided and loaded onto the Contractors trucks
by the Department at
stockpile areas designated by the Engineer.
9) Time charges will start when the operator, with the truck and spreader,
reports to the designated
location and will end when work is complete and the Contractor has
returned to the designated
location. The designated location shall be as shown on the General Notes and
Specification
Data Sheet(s).
OPTIONAL REQUIREMENTS
None
|
PAYMENT DESCRIPTION |
UNITS |
1) |
"Snow and Ice Control" |
HR |
REFERENCE ITEMS
None
Go to Top
7157 - REPAIR AND/OR MODIFY SIGNAL EQUIPMENT
SPECIFICATION REQUIREMENTS
1) The locations of the Traffic Signals shall be as designated in the General
Notes and Specification Data
Sheet(s).
2) Unless otherwise noted on the plans all materials that become part of the
final installation are to be
furnished to the Contractor at no charge. Materials shall be
picked up at the time(s) and location(s)
set out in the General Notes and Specification Data Sheet(s).
3) Installation of the proposed signal projects will be as described in the
General Notes and Specification
Data Sheet(s).
4) Unless otherwise shown on the plans, all conductors shall be in conduit,
except when in metal poles.
The conduits shall be placed as shown on the plans or as directed by the
Engineer. Unless
otherwise shown on the plans, conduit placed in an open trench shall be placed at least 18
inches
deep.
5) PVC junction boxes shall be installed at locations shown on the plans or as
directed by the Engineer.
OPTIONAL REQUIREMENTS
None
|
PAYMENT DESCRIPTION |
UNITS |
1) |
"Signal Pole Replacement" |
EA |
2) |
"Signal Head Assembly Replacement" |
EA |
3) |
"Span Wire Cable Replacement" |
EA |
4) |
"Electrical Service Replacement" |
EA |
5) |
"Signal Related Sign Replacement" |
EA |
6) |
"Signal Controller Cabinet Replacement" |
EA |
7) |
"Flashing Beacon Controller Cabinet
Replacement" |
EA |
8) |
"Luminaire Head and Mast Arm Replacement" |
EA |
9) |
"PVC Junction Box" |
EA |
10) |
"Installation of ground box" |
EA |
11) |
"Foundations" |
EA |
12) |
"Overhead Cable Replacement" |
LF |
13) |
"Jacking and Boring" |
LF |
14) |
"Vehicle Detector Inductive Loop (Loop
Detector)" |
LF |
15) |
"Trenching and Installation of Conduit" |
LF |
16) |
"Cable in Conduit" |
LF |
REFERENCE ITEMS
None
Go to Top
7158 - BLADE LEVEL-UP
SPECIFICATION REQUIREMENTS
1) The locations for Blade Level-up will be in accordance with the details in
the General Notes
and Specification Data Sheet(s).
2) All materials shall be furnished by the Department, unless otherwise shown on
the plans.Tack
coat material shall be the type as shown in the General Notes and
Specification Data Sheet(s).
3) The asphaltic level-up material shall be the type as specified in the General
Notes and Specification
Data Sheet(s) and will be furnished by the Department unless
otherwise shown on the plans. The
material will be available at the locations shown on the plans.
Abbreviated centerline tape will be
furnished by the Department.
OPTIONAL REQUIREMENTS
None
|
PAYMENT DESCRIPTION |
UNITS |
1) |
"Blade Level-Up" |
CY |
REFERENCE ITEMS
(210, 211, 212, 213, 214, 217)
Go to Top
7159 - REPAIR FENDER SYSTEMS
SPECIFICATION REQUIREMENTS
1) The locations for Repair Fender Systems will be as directed by the Engineer.
2) The length of Piling shall be as shown on the plans.
3) Galvanized batter plates are to be furnished by the Contractor, when
required. Dimensions shall be as
shown on the plans.
4) Polyethylene pipe (PE) shall be placed on designated piling when shown on the
plans.
5) All steel plates shall be removed from the faces of existing damaged clusters
for use in the
new installation.
6) The Contractor shall drive 1, 3, 5, 7, 12, 17, 19, 21, 31, 62 (44-50 long,
6-60 long and 12-70 long)
or 65 (50 long) new piles in a cluster so as to create the
core of a dolphin as directed by the Engineer or
as shown on the plans.
7) Each 1-pile, 3-pile, and 5-pile dolphin shall be wrapped with 5/8 inch
diameter wire rope cable a
minimum of six (6) wraps as directed by the Engineer or as shown on the plans.
Each 7-pile, 12-pile,
21-pile, dolphin shall be wrapped with 5/8 in diameter wire rope cable a minimum of 10 wraps as
directed by the Engineer or as shown on the plans.
8) Each 7-pile, 12-pile 19-pile, 21-pile dolphin shall be wrapped with 5/8 in
diameter wire rope cable
a minimum of 10 wraps as directed by the Engineer or as shown on the
plans.
9) Treated timbers, 10 inch X 12 inch, shall be affixed to the dolphins as
directed by the Engineer or as
shown on the plans.
OPTIONAL REQUIREMENTS
None
|
PAYMENT DESCRIPTION |
UNITS |
1) |
"Removing and Replacing Dolphins (Size Specified)" |
EA |
2) |
"Batter Plates" |
EA |
3) |
"10 X 12 Timbers" |
LF |
4) |
"Polyethylene Pipe" |
LF |
REFERENCE ITEMS
None
Go to Top
7160 - LANE CLOSURES
SPECIFICATION REQUIREMENTS
1) The locations for Lane Closures will be as shown on the plans and details
or as specified by the
Engineer.
2) All barricades, signs, cones, arrowboards and other types of devices,
necessary for the installation
and maintenance of the lane closures, shall
conform to details shown on the plans or those indicated
in the Texas Manual on
Uniform Traffic Control Devices (TMUTCD).
OPTIONAL REQUIREMENTS
None
|
PAYMENT DESCRIPTION |
UNITS |
1) |
"Lane Closures Type I" |
EA |
2) |
"Lane Closures Type II" |
EA |
REFERENCE ITEMS
None
Go to Top
7171 - REMOVE AND/OR INSTALL SIGN
PANELS (OVERHEAD)
(Routine Maintenance
Contracts Only)
SPECIFICATION REQUIREMENTS
1) Locations and types of roadway illumination assemblies to be relocated must
be shown on the plans.
OPTIONAL REQUIREMENTS
None
|
PAYMENT DESCRIPTION |
UNITS |
1) |
"Remove and/or Install Sign
Panels (Overhead)" |
EA |
REFERENCE ITEMS
None
Go to Top
7172 - SPOT
REPAIR OF FLEXIBLE BASE AND/OR SUBGRADE
(Routine Maintenance
Contracts Only)
SPECIFICATION REQUIREMENTS
1) The locations, will be shown on the plans.
2) The minimum length and width for any segment of work to be performed under
this Item
shall be as specified in the General Notes and Specification
Data Sheet(s). This work shall
involve the repairing of subgrade, base, and replacing
surface with asphaltic prime, seal or
asphaltic material as shown in the General Notes and
Specification Data Sheet(s).
3) The Contractor shall furnish all materials unless otherwise specified.
4) Materials, when furnished by the department, will be located at sites
designated in the
General Notes and Specification Data Sheet(s).
5) All materials such as basr, prime, aggregate, asphalt for seal or tack, hot
mix, hot mix cold-laid
asphaltic concrete or limestone rock asphalt, shall come from
an approved source and be the
type as shown in the General Notes and Specification Data Sheet(s).
6) The finished base shall recieve an application of prime asphalt, the type and
rate as set forth in
the General Notes and Specification Data Sheet(s). and
allowed to cure sufficiently
(minimum 24 hours) prior to applying surface treatment as set
forth in the General Notes and
Specification Data Sheet(s).
7) The rate of application of asphalt and aggregate will be as set forth in the
General Notes and
Specification Data Sheet(s).
OPTIONAL REQUIREMENTS
1) When directed by the Engineer, the surface applied shall be Cold Mix
Asphaltic Concrete or
Limestone Rock Asphalt and shall be the type as specified in
the General Notes and
Specification Data Sheet(s).
|
PAYMENT DESCRIPTION |
UNITS |
1) |
"Spot Repair of
Flexible Base and/or Subgrade (Depth Specified)" |
CY |
2) |
"Prime/Seal
(Depth Specified)" |
SY |
3) |
"Hot Mix
Asphaltic Concrete or Limestone Rock Asphalt Pavement (Depth
Specified)" |
TON |
4) |
"Cold Mix
Asphaltic Concrete or Limestone Rock Asphalt Surface (Depth
Specified)" |
CY |
REFERENCE ITEMS
(204, 247, 300, 302, 330, 332, 334, 340, 345)
Go to Top
7173 - LOOP
DETECTOR REPAIR AND/OR REPLACEMENT
(Routine Maintenance
Contracts Only)
SPECIFICATION REQUIREMENTS
1) Locations for detector loops must be shown on the plans as well as in the
General Notes and Specification Data Sheet(s).
2) All materials that are to become part of the final work will be furnished by
the
Department unless otherwise specified in the General Notes
and Specification
Data Sheet(s). A list of required materials shall be
submitted to the Department
at least 24 hours in advance of the requested pickup date
between the hours of
8:00 A.M. and 4:00 P.M. at sites designated in the General
Notes and
Specification Data Sheet(s).
3) Unless otherwise shown on the plans, all conductors shall be in conduit,
except
when in metal poles, unless otherwise shown on the plans.
4) Unless otherwise shown on the plans, conduit placed in an open trench shall
be
placed at least 18 inches deep.
OPTIONAL REQUIREMENTS
None
|
PAYMENT DESCRIPTION |
UNITS |
1) |
"Saw Cuts" |
LF |
2) |
"Installation of Loop Detector Wire in Conduit" |
LF |
3) |
"Wire Splices" |
EA |
4) |
Installation of Pull Boxes" |
EA |
5) |
"Installation of PVC Boxes" |
EA |
6) |
"Special Anchorage" |
EA |
7) |
"Loop Lead-In Cable" |
LF |
8) |
Span Wire" |
EA |
9) |
"Overhead Cable Placement" |
LF |
10) |
"Jacking and Boring" |
LF |
11) |
"Trenching and Installation of Conduit" |
LF |
REFERENCE ITEMS
None
Go to Top
7174 - PREVENTATIVE MAINTENANCE OF
SIGNAL EQUIPMENT
(Routine Maintenance
Contracts Only)
SPECIFICATION REQUIREMENTS
1) Locations for preventative maintenance shall be shown on the plans.
OPTIONAL REQUIREMENTS
None
|
PAYMENT DESCRIPTION |
UNITS |
1) |
"Preventative Maintenance" |
EA |
2) |
"Replace/Install Ground Box" |
EA |
3) |
"Replace Signal Head (Type Specified)" |
EA |
4) |
"Replace Guy Down" |
EA |
5) |
"Solder and Weatherproof Splice" |
EA |
6) |
"Paint Signal Pole and Mast Arm" |
EA |
7) |
"Maintain Controller Cabinet" |
EA |
REFERENCE ITEMS
None
Go to Top
7202 - END TERMINAL AND ATTENUATOR
REPAIR
(Routine Maintenance
Contracts Only)
SPECIFICATION REQUIREMENTS
1) Unless otherwise shown on the plans, the Contractor shall supply all
materials.
2) A list of required materials shall be submitted to the Department
at least 48 hours in advance of the requested pickup date
between the hours of
8:00 A.M. and 4:00 P.M. at sites designated in the General
Notes and
Specification Data Sheet(s).
3) Repair of each system or component of a system shall be done in accordance
with
the manufacturer's shop drawings, the details shown on the
plans, the appropriate
standard design sheet(s), and as directed by the Engineer.
OPTIONAL REQUIREMENTS
None
|
PAYMENT DESCRIPTION |
UNITS |
1) |
"Repair and/or Upgrade Steel Barrels" |
EA |
2) |
"Replace and/or Upgrade Vehicle Impact Attenuator" |
EA |
3) |
"Repair Guardrail Extruder Terminal System" |
EA |
4) |
"Install and/or Repair Bridge Rail" |
EA |
5) |
"Installation of Crash Cushion Attenuating
Terminal" |
EA |
6) |
"Replacement of Crash Cushion Attenuating Terminal
(Front Section)" |
EA |
7) |
"Replacement of Crash Cushion Attenuating Terminal
(Rear Section)" |
EA |
8) |
"Repair of Guardrail Energy Absorbing Terminal" |
EA |
9) |
"End Treatment Module Repair" |
EA |
10) |
"Installation of Guardrail Extruder System" |
EA |
11) |
"Installation of Hex - Foam Sandwich System" |
EA |
12) |
"Repair of Hex - Foam Sandwich System" |
EA |
13) |
"Installation of Hydro Crash Cushion (HCC) (Free
Stand)" |
EA |
14) |
"Repair of Hydro Crash Cushion (HCC) (Free Stand)" |
EA |
15) |
"Repair Guardrail End ABS Terminal (EA BAY) |
EA |
16) |
"Repair of ET - 2000" |
EA |
17) |
"Replace SGT Impact Terminal (Head Only)" |
EA |
18) |
"Repair of SGT (Excluding Head)" |
EA |
19) |
"Single Guardrail Terminal (Type I)" |
EA |
20) |
"Single Guardrail Terminal (Type II)" |
EA |
21) |
"Single Guardrail Terminal (Type III)" |
EA |
22) |
"Single Guardrail Terminal (Type I, II or III)" |
EA |
23) |
"Repair of Single Guardrail Terminal" |
EA |
24) |
"Repair Quadguard System (EA BAY)" |
EA |
25) |
"Repair Beam Eating Steel Terminal" |
EA |
26) |
"Repair React System" |
EA |
27) |
"Reset Vehicle Impact Attenuation Assembly
Barrels" |
EA |
28) |
"Replace Vehicle Impact Attenuation Assembly
Barrels" |
EA |
REFERENCE ITEMS
None
Go to Top
7243 - ILLUMINATION
(Routine Maintenance
Contracts Only)
SPECIFICATION REQUIREMENTS
1) Location for Illumination may be shown on the plans.
2) Unless otherwise shown in the General Notes and Specification Data Sheet(s),
the Contractor (Owner) or the Superintendent shall hold a
Master Electrician's
License from a city with a population of 50,000 or greater.
3) Materials furnished by the Department will be located at sites designated in
the General Notes and Specification Data Sheet(s).
OPTIONAL REQUIREMENTS
1) When shown on the plans, a Class "B" concrete riprap apron
conforming to
Item 421, "Portland Cement Concrete", shall be
provided by the Contractor.
|
PAYMENT DESCRIPTION |
UNITS |
1) |
"Replace
Lamp" |
EA |
2) |
"Replace Fuse" |
EA |
3) |
"Replace Fuse Holder" |
EA |
4) |
"Replace Starter Board" |
EA |
5) |
"Replace Duct Cable" |
LF |
6) |
"Replace Standard Single Mast" |
EA |
7) |
"Replace Standard Double Mast" |
EA |
8) |
"Replace and/or Install Mast Arm" |
EA |
9) |
"Replace Luminaire" |
EA |
10) |
"Replace Service Pole" |
EA |
11) |
"Replace Lamp Socket" |
EA |
12) |
"Replace Transformer Base Cover" |
EA |
13) |
"Replace Luminaire Wall Pack" |
EA |
14) |
"Replace Photo Cell and/or Bracket |
EA |
15) |
"Replace/Install 3 Post Hand - Off - Auto Cont
Switch" |
EA |
16) |
"Replace/Install Fused Disconnect Switch" |
EA |
17) |
"Replace or Install Electromagnetic Contactor" |
EA |
18) |
"Replace or Install Meter Base" |
EA |
19) |
"Replace or Install Time Clock" |
EA |
20) |
"Replace or Install Breaker Panel" |
EA |
21) |
"Replace or Install Breaker" |
EA |
22) |
"Replace Wall Pack Ballast" |
EA |
23) |
"Replace or Install Wall Pack Lens Guard" |
EA |
24) |
"Replace or Install Pole Guard" |
EA |
25) |
"Replace Wall Pack Socket" |
EA |
26) |
"Replace Pole Lamp Socket" |
EA |
27) |
"Replace Overhead Sign Ballast" |
EA |
28) |
"Replace Overhead Sign Lamp" |
EA |
29) |
"Replace Overhead Sign Florescent Tubes" |
EA |
30) |
"Replace Overhead Sign Light Fixtures" |
EA |
31) |
"Replace Overhead Sign Fuse" |
EA |
32) |
"Replace Overhead Sign Lamp Socket" |
EA |
33) |
"Re - Aim and/or Clean Lens on High Mast Pole" |
EA |
34) |
"Remove and/or Replace Overhead Lens" |
EA |
35) |
"Remove and/or Replace Wall Pack Lens" |
EA |
36) |
"Underground Splice" |
EA |
37) |
"Aboveground Splice" |
EA |
38) |
"Add or Replace Conductor" |
LF |
39) |
"Add or Replace Above Ground Conduit" |
LF |
40) |
"Add or Replace Underground Conduit" |
LF |
41) |
"Install Ground Rod" |
EA |
42) |
"Install Ground Box" |
EA |
43) |
"Pavement Bore" |
LF |
44) |
"Install Foundation" |
EA |
45) |
"Re - Strap Conduit" |
EA |
46) |
"Replacement of Transformer Base Only" |
EA |
47) |
"Remove Ground Box" |
EA |
48) |
"Remove and Replace Ground Box" |
EA |
49) |
"Replace Service" |
EA |
REFERENCE ITEMS
(400, 476, 627, 628, 656)
Go to Top
7285 - MAINTENANCE OF ILLUMINATION
SYSTEMS
(Routine Maintenance
Contracts Only)
SPECIFICATION REQUIREMENTS
1) Location for Illumination may be shown on the plans.
2) Unless otherwise shown on the plans,
the Contractor (Owner) or the Superintendent shall hold a
Master Electrician's
License from a city with a population of 50,000 or greater.
3) Materials furnished by the Department will be located at sites designated on
the plans.
OPTIONAL REQUIREMENTS
None
|
PAYMENT DESCRIPTION |
UNITS |
1) |
"Breakaway Base
Inspection and Repair" |
LS |
2) |
"Maintaining
Luminaires" |
MO |
3) |
"Maintaining
Electrical Services" |
MO |
4) |
"Emergency Call" |
EA |
REFERENCE ITEMS
(447, 620, 624)
Go to Top
7293 - REMOVAL OF UNDERGROUND FUEL
STORAGE TANK SYSTEMS
(Routine Maintenance
Contracts Only)
SPECIFICATION REQUIREMENTS
1) The locations may be shown on the plans or as directed by the Engineer.
OPTIONAL REQUIREMENTS
None
|
PAYMENT DESCRIPTION |
UNITS |
1) |
"Removal of
Underground Storage Tank Systems" |
LS |
REFERENCE ITEMS
(104, 105, 134, 400, 403)
Go to Top
7294 - INSTALLATION OF ABOVEGROUND
FUEL STORAGE TANK SYSTEMS
(Routine Maintenance
Contracts Only)
SPECIFICATION REQUIREMENTS
1) The Contractor shall submit as-built drawings upon completion of the
aboveground
storage tank system installation.
OPTIONAL REQUIREMENTS
None
|
PAYMENT DESCRIPTION |
UNITS |
1) |
"Installation of
Aboveground Fuel Storage Tank Systems |
LS |
REFERENCE ITEMS
(400, 402, 409, 420, 421, 437, 440, 441, 446)
Go to Top
7328 - ABANDONMENT
AND PERMANENT REMOVAL FROM SERVICE OF UNDERGROUND FUEL STORAGE TANK
SYSTEMS
(Routine Maintenance
Contracts Only)
SPECIFICATION REQUIREMENTS
1) The locations may be shown on the plans, or as directed by the Engineer.
OPTIONAL REQUIREMENTS
None
|
PAYMENT DESCRIPTION |
UNITS |
|
"Abandonment of
Underground Storage Tank Systems" |
LS |
REFERENCE ITEMS
(140, 105, 134, 400, 403)
Go to Top
7430 - POST AND CABLE FENCE
(Routine Maintenance Contracts Only)
SPECIFICATION REQUIREMENTS
1) The locations for Post and Cable Fence will be as shown on the plans or as
directed by the
Engineer.
2) Unless otherwise shown on the plans, the Contractor will furnish all
materials. Materials to
be furnished by the Department will be designated
on the plans.
3) Painting is not required unless
otherwise stated on the plans.
4) Spacing of pull posts will be shown on the plans.
5) Reflectors will be shown on the plans.
OPTIONAL REQUIREMENTS
None
|
PAYMENT DESCRIPTION |
UNITS |
1) |
"Post and Cable Fence (Removal)" |
LF |
2) |
"Post and Cable Fence (Remove Concrete Anchor)" |
EA |
3) |
"Post and Cable Fence (New Installation)" |
LF |
4) |
"Post and Cable Fence (New Concrete Anchor)" |
EA |
5) |
"Post and Cable Fence (Remove and Replace Posts)" |
EA |
6) |
"Post and Cable Fence (Remove and Replace Concrete
Anchors)" |
EA |
7) |
Post and Cable Fence (Remove and Replace Cable)" |
LF |
REFERENCE ITEMS
(421, 540)
Go to Top
7445 ROADSIDE MOWING
(Routine Maintenance
Contracts Only)
SPECIFICATION REQUIREMENTS
1)
2) Identify Non-Mow Areas.
3) Show tables of roads to be mowed including: County, Highway, Beginning
Laymans Description,
Beginning Reference Marker, Ending Laymans Description, Ending Reference
Marker, Strip Acres,
and Full Width Acres.
4) Strip and Full-Width mowing are plans quantity items.
5) Spot mowing has a minimum acreage per work request is 3 acres.
6) The following Statewide Standard Details Sheet is required for mowing:
Mowing Standards
OPTIONAL REQUIREMENTS
None
|
PAYMENT DESCRIPTION |
UNITS |
1) |
"Strip Mowing" |
AC |
2) |
"Full-Width Mowing" |
AC |
3) |
"Spot Mowing" |
AC |
REFERENCE ITEMS
None
Go to Top
7446 CLEANING AND SWEEPING HIGHWAYS
(Routine Maintenance
Contracts Only)
SPECIFICATION REQUIREMENTS
1)
Designate on the plans pavement surfaces and other
areas which require debris removal. Other
areas could be all sides of raised pavement markers, barrier drain slots,
slotted drains. Inlet openings,
attenuators, and guardrails.
2) Spot sweeping requires response time period on the plans.
The minimum work request length is
1 shoulder mile.
3) Handwork areas need to be shown on the plans.
OPTIONAL REQUIREMENTS
None
|
PAYMENT DESCRIPTION |
UNITS |
1) |
"Cleaning and Sweeping (Center Median)" |
MI, CYC |
2) |
"Cleaning and Sweeping (Outside Main Lane)" |
MI, CYC |
3) |
"Cleaning and Sweeping (Frontage Road)" |
MI, CYC |
4) |
"Cleaning and Sweeping (Entrance and Exit
Ramp)" |
MI, CYC |
5) |
Cleaning and Sweeping (Aggregate Removal) |
MI |
6) |
"Cleaning and Sweeping (Spot)" |
MI |
7) |
"Cleaning and Sweeping (Handwork)" |
SY |
REFERENCE ITEMS
None
Go to Top
7450 DEBRIS
REMOVAL
(Routine Maintenance
Contracts Only)
SPECIFICATION REQUIREMENTS
1) Show locations of debris removal on plans.
2) Center medians and mainlanes debris removal, frontage roads debris removal,
and entrance and
exit ramps debris removal goes an additional 5 ft. adjacent to the pavement,
unless otherwise shown
on the plans.
3) For spot debris removal the Contractor is to respond within 2 hours of
notification, unless otherwise
shown on the plans. A minimum of 1
roadbed mile will be paid per call-out, unless otherwise shown
on the plans.
4) Traffic control will not be paid for directly but will be subsidiary to this
Item, unless otherwise shown
on the plans.
OPTIONAL REQUIREMENTS
None
|
PAYMENT DESCRIPTION |
UNITS |
1) |
"
Debris Removal and Disposal (Center Medians and
Mainlanes)" |
CYC, MI |
2) |
"
Debris Removal and Disposal (Frontage Roads)" |
CYC, MI |
3) |
"
Debris Removal and Disposal (Entrance and Exit Ramps)" |
CYC, MI |
4) |
Debris Removal and Disposal (Spot Debris)" |
MI |
REFERENCE ITEMS
None
Go to Top
7640 PREFABRICATED PEDESTRIAN STEEL TRUSS
BRIDGE SPAN
SPECIFICATION REQUIREMENTS
1) Show details on the plans for governs the design, fabrication, and installation
of prefabricated pedestrian steel truss bridge spans including bearing devices,
anchor bolts, bridge deck, and pedestrian railings.
2) Provide materials in accordance with Items listed,
unless otherwise shown on the plans.
3) Show on the plans whether to paint, galvanize, or leave the steel truss
surfaces exposed.
4) Paint gray
, unless otherwise shown on the plans.
5) Include the steel truss span superstructure as shown on the plans.
6) Erect the bridge and construct the deck in accordance with Items
listed, unless otherwise shown on the plans.
OPTIONAL REQUIREMENTS
None
|
PAYMENT DESCRIPTION |
UNITS |
1) |
"Pedestrian Truss Bridge Span (Length
Specified)" |
EA |
REFERENCE ITEMS
(420, 421, 435, 440, 441, 442, 447, 448, 449, 491)
Go to Top
|