Table Of Contents
ITEM NO. - TITLE AND REQUIREMENTS
5001 - TEMPORARY METAL BEAM
GUARD FENCE
SPECIFICATION REQUIREMENTS
1) Locations and/or limits can be shown on the plans or as directed by the
Engineer.
2) Construction details for the temporary metal beam guard fence must be shown
on the plans along with the following Statewide Standard Details Sheet for the
design and installation details of metal beam guard fence:
- MBGF-01(M) Metal Beam Guard Fence
3) Any portions of the temporary metal beam guard fence furnished by the State
must be
shown on the plans and can be picked up at a designated location shown on
the plans.
4) If using temporary barrel mounted guard fence, must include the following
Statewide Standard Details
Sheet for the installation details of temporary barrel
mounted metal beam guard fence:
- TB(BMGF)-95(M) Temporary Barrier Barrel-Mounted Guard Fence
OPTIONAL REQUIREMENTS
None
|
PAYMENT DESCRIPTION |
UNITS |
1) |
"Temporary Metal Beam Guard Fence (Guage Specified)" |
M |
2) |
"Temporary Metal Beam Guard Fence (Barrier) (Guage Specified)" |
M |
3) |
"Temporary Metal Beam Guard Fence (Relap)" |
EA |
REFERENCE ITEMS
(540)
Go to Top
5002 - ROCK FILTER DAMS FOR
EROSION AND SEDIMENTATION CONTROL
SPECIFICATION REQUIREMENTS
1) The locations of rock filter dams can be shown on the plans or as directed
by the Engineer.
2) The types of rock filter dams must be shown on the plans.
3) The dimensions for the volume of rock must be shown on the plans for rock filter
dams measured by the cubic meter.
4) The length must be shown on the plans for rock filter dams measured by the meter.
5) Must include the following Statewide Standard Details Sheet for the design
and
installation details for rock filter dams:
- EC(2)-95(M) Temporary Erosion, Sediment and Water Pollution
Control
Measures---Rock Filter Dams
6) The construction details of a type 5 rock filter dam must be shown on the plans.
7) The removal of accumulated sediment deposits will be measured and paid for
under
Special Specification Item 5005, "Earthwork for Erosion
Control".
OPTIONAL REQUIREMENTS
None
|
PAYMENT DESCRIPTION |
UNITS |
1) |
"Rock Filter Dams (Type Specified)" |
M, M3 |
2) |
"Rock Filter Dams (Remove and Replace) (Type
Specified)" |
M, M3 |
3) |
"Rock Filter Dams (Remove) (Type
Specified)" |
M, M3 |
REFERENCE ITEMS
(506)
Go to Top
5003 - BALED HAY FOR EROSION
AND SEDIMENTATION CONTROL
SPECIFICATION REQUIREMENTS
1) The locations of the hay bales can be shown on the plans or as
directed by
the Engineer.
2) Must include the following Statewide Standard Details Sheet for the design
and
installation details for hay bales:
- EC(1)-95(M) Temporary Erosion, Sediment and Water Pollution
Control
Measures---Fence & Baled Hay
3) The removal of accumulated sediment deposits will be measured and paid for
under
Special Specification Item 5005, "Earthwork for Erosion
Control".
OPTIONAL REQUIREMENTS
None
|
PAYMENT DESCRIPTION |
UNITS |
1) |
"Baled Hay for Erosion and
Sedimentation Control" |
EA |
2) |
"Baled Hay for Erosion and
Sedimentation Control (Remove and Replace)" |
EA |
3) |
"Baled Hay for Erosion and
Sedimentation Control (Remove)" |
EA |
REFERENCE ITEMS
(506)
Go to Top
5005 - EARTHWORK FOR EROSION
CONTROL
SPECIFICATION REQUIREMENTS
1) The type of equipment used or a combination of equipment used must be shown
on
the plans, unless, the bid item "Earthwork (Erosion Control)"
is used, then the
equipment used will be at the Contractor's option as long as it is approved
by the Engineer.
2) The details for dikes, swales, sediment basins and sediment traps can be
shown on
the plans or you can include one or more of the following Statewide
Standard Details
Sheets for earthwork for erosion control:
- EC(4)-95(M) Temporary Erosion, Sediment and Water Pollution
Control
Measures---Dikes (Earthwork for Erosion Control)
- EC(5)-95(M) Temporary Erosion, Sediment and Water Pollution
Control
Measures---Swales (Earthwork for Erosion Control)
- EC(6)-95(M) Temporary Erosion, Sediment and Water Pollution
Control
Measures---Sediment Basins and Traps (Earthwork
for Erosion Control)
3) The locations for dikes, swales, sediment basins and sediment traps can be
shown on
the plans or as directed by the Engineer.
OPTIONAL REQUIREMENTS
None
|
PAYMENT DESCRIPTION |
UNITS |
1) |
"Earthwork (Erosion Control)
(Measurement
Class Specified)" |
M3 (Class 2 or 3) |
2) |
"Dragline Work (Erosion Control) |
|
|
(Measurement Class Specified)" |
H, M3 (Class1, 2 or 3) |
3) |
"Backhoe Work (Erosion Control) |
|
|
(Measurement Class Specified)" |
H, M3 (Class1, 2 or 3) |
4) |
"Excavator Work (Erosion Control) |
|
|
(Measurement Class Specified)" |
H, M3 (Class1, 2 or 3) |
5) |
"Front End Loader Work (Erosion Control) |
|
|
(Measurement Class Specified)" |
H, M3 (Class1, 2 or 3) |
6) |
"Blading Work (Erosion Control) |
|
|
(Measurement Class Specified)" |
H, M3 (Class1, 2 or 3) |
7) |
"Scraper Work (Erosion
Control) |
|
|
(Measurement Class Specified)" |
H, M3 (Class1, 2 or 3) |
8) |
"Bulldozer Work (Erosion Control) |
|
|
(Measurement Class Specified)" |
H, M3 (Class1, 2 or 3) |
9) |
"Backhoe Work or Front End Loader Work
(Erosion Control) |
|
|
(Measurement Class Specified)" |
H, M3 (Class1, 2 or 3) |
REFERENCE ITEMS
(506, 556)
Go to Top
5006 - CONSTRUCTION EXITS
SPECIFICATION REQUIREMENTS
1) The types of construction exits must be shown on the plans.
2) The locations for the construction exits will be identified by the Engineer.
3) Must include the following Statewide Standard Details Sheet for the design
and
installation details for construction exits:
- EC(3)-95(M) Temporary Erosion, Sediment and Water Pollution
Control
Measures---Construction Exits
4) The construction of sediment traps and the removal of accumulated sediment
deposits will be measured and paid for under Special Specification Item
5005,
"Earthwork for Erosion Control".
5) The construction details of a Type 4 construction exit must be shown on the plans.
OPTIONAL REQUIREMENTS
None
|
PAYMENT DESCRIPTION |
UNITS |
1) |
"Construction Exits (Type Specified)" |
M2 |
2) |
"Construction Exits (Remove and
Replace) (Type Specified)" |
M2 |
3) |
"Construction Exits (Remove) (Type
Specified)" |
M2 |
REFERENCE ITEMS
(506)
Go to Top
5008 - HEX-FOAM SANDWICH SYSTEM CRASH
CUSHIONS
SPECIFICATION REQUIREMENTS
1) The locations for Polymer Nosing Sealed Expansion Joints shall be as shown on
the plans.
2) The nose cover shall be supported by two legs as shown on the plans.
3) All steel materials used shall be fabricated with ASTM A36 steel unless
otherwise specified
and after fabrication, shall be galvanized in accordance with
ASTM A123.
OPTIONAL REQUIREMENTS
None
|
PAYMENT DESCRIPTION |
UNITS |
1) |
"Hex-Foam Sandwich System Crash Cushions (Bridge
Structure Type)" |
EA |
2) |
"Hex-Foam Sandwich System Crash Cushions (Roadway
Type)" |
EA |
REFERENCE ITEMS
(421)
Go to Top
5009 - SANDBAGS FOR EROSION
CONTROL
SPECIFICATION REQUIREMENTS
1) The locations of the sandbags or sandbag berms/dams can be shown on the
plans or as directed by the Engineer.
OPTIONAL REQUIREMENTS
None
|
PAYMENT DESCRIPTION |
UNITS |
1) |
"Sandbags" |
EA |
2) |
"Sandbag Berms/Dams (Height
Specified)" |
M |
REFERENCE ITEMS
(506)
Go to Top
5010 - TEMPORARY PAVED FLUMES FOR
EROSION AND SEDIMENTATION CONTROL
SPECIFICATION REQUIREMENTS
1) Locations for the temporary paved flumes can be shown on the plans or as
directed by the Engineer.
2) The details for the temporary paved flumes and sediment traps can be shown on
the plans
or you can include one or both of the following Statewide
Standard Details Sheets for
earthwork for erosion control:
- EC(6)-95(M) Temporary Erosion, Sediment and Water Pollution
Control
Measures---Sediment Basins and Traps (Earthwork for
Erosion Control)
- EC(8)-95(M) Temporary Erosion, Sediment and Water Pollution
Control
Measures---Temporary Paved Flumes
3) The construction of sediment traps and the removal of accumulated sediment
deposits will be
measured and paid for under Special Specification Item 5005,
"Earthwork for Erosion Control".
OPTIONAL REQUIREMENTS
None
|
PAYMENT DESCRIPTION |
UNITS |
1) |
"Temporary Paved Flumes for Erosion and
Sedimentation Control" |
M2 |
2) |
"Paved Flume (Remove and Replace)" |
M2 |
3) |
"Paved Flume (Remove)" |
M2 |
REFERENCE ITEMS
(506)
Go to Top
5011 - TEMPORARY PIPE SLOPE DRAINS FOR EROSION AND SEDIMENTATION
CONTROL
SPECIFICATION REQUIREMENTS
1) The locations for the temporary pipe slope drains can be shown on the plans or
as directed by the Engineer.
2) The temporary pipe will be either corrugated metal pipe, PVC pipe or flexible
tubing
of the diameter shown on the plans.
3) The flared inlet details will be as shown on the plans.
4) The details for the temporary pipe slope drains and sediment traps can be
shown on the
plans or you can include one or both of the following Statewide Standard
Details Sheets
for earthwork for erosion control:
- EC(6)-95(M) Temporary Erosion, Sediment and Water Pollution
Control Measures---
Sediment Basins and Traps (Earthwork for Erosion Control)
- EC(7)-95(M) Temporary Erosion, Sediment and Water Pollution
Control Measures---
Temporary Pipe Slope Drains
5) The construction of sediment traps and the removal of accumulated sediment
deposits
will be measured and paid for under Special Specification Item 5005,
"Earthwork for Erosion Control".
6) The riprap concrete and/or stone used as an energy dissipater or for
stabilizing the
sediment trap will be measured and paid for under Item 432.
OPTIONAL REQUIREMENTS
None
|
PAYMENT DESCRIPTION |
UNITS |
1) |
"Temporary Pipe Slope Drains for Erosion
and Sediment Control |
|
|
(Size Specified)" |
M |
2) |
"Pipe Slope Drains (Remove and
Replace)" |
M |
3) |
"Pipe Slope Drains (Remove)" |
M |
REFERENCE ITEMS
(432, 506)
Go to Top
5012 - TEMPORARY SEDIMENT
CONTROL FENCE
SPECIFICATION REQUIREMENTS
1) Locations of the temporary sediment control fence can be shown on the plans
or as directed by the Engineer.
2) Must include the following Statewide Standard Details Sheet for the details
and
installation of temporary sediment control fence:
- EC(1)-95(M) Temporary Erosion, Sediment and Water Pollution
Control Measures
---Fence & Baled Hay
3) The removal of accumulated sediment deposits will be measured and paid for
under
Special Specification Item 5005, "Earthwork for Erosion
Control".
OPTIONAL REQUIREMENTS
None
|
PAYMENT DESCRIPTION |
UNITS |
1) |
"Temporary Sediment Control Fence" |
M |
2) |
"Temporary Sediment Control Fence (Remove
and Replace)" |
M |
3) |
"Temporary Sediment Control Fence
(Remove)" |
M |
REFERENCE ITEMS
(506)
Go to Top
5014 - REMOVING SINGLE
GUARDRAIL TERMINALS
SPECIFICATION REQUIREMENTS
1) Locations for the S.G.T.'s to be removed must be shown on the plans.
2) All materials removed and salvaged will be neatly stored at designated sites
or
disposed of as directed by the Engineer.
OPTIONAL REQUIREMENTS
None
|
PAYMENT DESCRIPTION |
UNITS |
1) |
"Removing Single Guardrail Terminals" |
EA |
REFERENCE ITEMS
None
Go to Top
5015 - ANTI-GRAFFITI COATING
SPECIFICATION REQUIREMENTS
1) The type of anti-graffiti coating must be shown on the plans.
2) The anti-graffiti coating will be applied at locations and/or areas shown on
the
plans or as directed by the Engineer.
3) The anti-graffiti coating product name, producer name, and the exact location
where the coating was applied must be recorded for future reference because it
is important that the material applied for the recoat is the same as the material that
was initially
applied.
4) This is a plans quantity measurement Item.
OPTIONAL REQUIREMENTS
None
|
PAYMENT DESCRIPTION |
UNITS |
1) |
"Anti-Graffiti Coating - Type I " |
M2 |
2) |
"Anti-Graffiti Coating - Type II " |
M2 |
REFERENCE ITEMS
(427)