DIVISION II - SUBBASE AND BASE COURSES
Table Of Contents
ITEM NO. TITLE AND REQUIREMENTS
204 - SPRINKLING
SPECIFICATION REQUIREMENTS
1) The rate of application can be shown on the plans or as directed by the Engineer.
2) Specify on plans if it is a pay Item.
OPTIONAL REQUIREMENTS
None
|
PAYMENT DESCRIPTION |
UNITS |
1) |
"Sprinkling (Base)" |
KL |
2) |
"Sprinkling (Earthwork)" |
KL |
3) |
"Sprinkling (Dust Control)" |
KL |
REFERENCE ITEMS
None
Go to Top
210 - ROLLING (FLAT WHEEL)
SPECIFICATION REQUIREMENTS
1) Specify on the plans if it is a pay Item.
OPTIONAL REQUIREMENTS
None
|
PAYMENT DESCRIPTION |
UNITS |
1) |
"Rolling (Flat Wheel)" |
H |
REFERENCE ITEMS
None
Go to Top
211 - ROLLING (TAMPING)
SPECIFICATION REQUIREMENTS
1) Specify on the plans if it is a pay Item.
OPTIONAL REQUIREMENTS
None
|
PAYMENT DESCRIPTION |
UNITS |
1) |
"Rolling (Tamping)" |
H |
REFERENCE ITEMS
(212)
Go to Top
212 - ROLLING (HEAVY TAMPING)
SPECIFICATION REQUIREMENTS
1) Specify on the plans if it is a pay Item.
OPTIONAL REQUIREMENTS
None
|
PAYMENT DESCRIPTION |
UNITS |
1) |
"Rolling (Heavy Tamping)" |
H |
REFERENCE ITEMS
None
Go to Top
213 - ROLLING (PNEUMATIC TIRE)
SPECIFICATION REQUIREMENTS
1) Specify type of pneumatic tire roller to be used on the plans.
2) Specify on the plans if it is a pay Item.
OPTIONAL REQUIREMENTS
None
|
PAYMENT DESCRIPTION |
UNITS |
1) |
"Rolling (Light Pneumatic Tire)" |
H |
2) |
"Rolling (Medium Pneumatic Tire) (Type A)" |
H |
3) |
"Rolling (Medium Pneumatic Tire) (Type B)" |
H |
REFERENCE ITEMS
None
Go to Top
214 - ROLLING (HEAVY PNEUMATIC TIRE)
SPECIFICATION REQUIREMENTS
1) Specify on the plans if it is a pay Item.
OPTIONAL REQUIREMENTS
None
|
PAYMENT DESCRIPTION |
UNITS |
1) |
"Rolling (Heavy Pneumatic Tire)" |
H |
REFERENCE ITEMS
None
Go to Top
215 - ROLLING (GRID)
SPECIFICATION REQUIREMENTS
1) Specify on the plans if it is a pay Item.
OPTIONAL REQUIREMENTS
None
|
PAYMENT DESCRIPTION |
UNITS |
1) |
"Rolling (Grid)" |
H |
REFERENCE ITEMS
None
Go to Top
216 - ROLLING (PROOF)
SPECIFICATION REQUIREMENTS
None
OPTIONAL REQUIREMENTS
None
|
PAYMENT DESCRIPTION |
UNITS |
1) |
"Rolling (Proof)" |
H |
REFERENCE ITEMS
None
Go to Top
217 - ROLLING (VIBRATORY)
SPECIFICATION REQUIREMENTS
1) Specify type of roller to be used on the plans.
2) For Type C roller, the static mass, vibratory drum width and drum surface configuration must
be shown on the plans.
3) Specify on the plans if it is a pay Item.
OPTIONAL REQUIREMENTS
None
|
PAYMENT DESCRIPTION |
UNITS |
1) |
"Rolling (Vibratory) (Type Specified)" |
H |
REFERENCE ITEMS
None
Go to Top
247 - FLEXIBLE BASE
SPECIFICATION REQUIREMENTS
1) Limits must be shown on the plans.
2) Width, depth and number of courses must be shown on the typical section(s).
3) Must specify type and grade of flexible base on the plans.
4) Type D material requirements must be shown on the plans.
5) Grade 6 requirements must be shown on the plans.
6) Show the measurement Class on the plans.
7) Measurement Class 4 and 5 are plans quantity measurement Items.
8) Must specify the depth for measurement Class 5.
OPTIONAL REQUIREMENTS
1) When measurement Class 2 is required, it will be paid for in accordance with Item 520.
2) When proof rolling is required, it will be paid for in accordance with Item 216.
3) When lightweight aggregates are used, the wet ball mill requirements will not apply and the lightweight
aggregate shall meet the Los Angeles Abrasion, Pressure Slaking and Freeze Thaw requirements of Item
303, "Aggregate for Surface Treatment (Lightweight)".
|
PAYMENT DESCRIPTION |
UNITS |
1) |
"Flexible Base (Complete in Place) (Type Specified) |
M3 (Class 1, 3 or 4), |
|
(Grade Specified) (Measurement Class Specified) |
MGR (Class 2), |
|
(Depth Specified for Measurement Class 5)" |
M2 (Class 5) |
|
|
|
2) |
"Flexible Base (Roadway Delivery) (Type Specified) |
M3 (Class 1), |
|
(Grade Specified) (Measurement Class Specified)" |
MGR (Class 2) |
|
|
|
3) |
"Flexible Base (Stockpile Delivery) (Type Specified) |
M3 (Class 1, 3), |
|
(Grade Specified) (Measurement Class Specified)" |
MGR (Class 2) |
REFERENCE ITEMS
(204)
Go to Top
251 - REWORKING BASE MATERIAL
SPECIFICATION REQUIREMENTS
1) Limits must be shown on the plans.
2) Width and depth must be shown on the typical section(s).
3) Specify type of work for reworking base material on the plans.
4) The type and grade of the new flexible base must be shown on the plans. Furnishing and delivery of new
base will be paid for as "Flexible Base (Roadway Delivery)" in accordance with subarticle 247.5.
5) Show type of compaction on the plans.
6) Measurement Class 2 and 5 are plans quantity measurement Items.
OPTIONAL REQUIREMENTS
1) When measurement Class 6 is required, it will be paid for in accordance with Item 520.
2) When proof rolling is required, it will be paid for in accordance with Item 216.
3) When new base is required, it shall be in accordance with Item 247.
|
PAYMENT DESCRIPTION |
UNITS |
1) |
"Reworking Base Material (Type A) (Class 1 or 2) |
KM (Class 1), |
|
(Scarified Depth) (Compaction Method)" |
M2 (Class 2) |
|
|
|
2) |
"Reworking Base Material (Type B) (Class 1, 2 or 5) |
KM (Class 1), |
|
(Scarified Depth) (Compaction Method)" |
M2 (Class 2), |
|
|
M3 (Class 5) |
|
|
|
3) |
"Reworking Base Material (Type C) (Class Specified) |
KM (Class 1), |
|
(Scarified Depth) (Compaction Method)" |
M2 (Class 2), |
|
|
M3 (Class 3, 4, 5) |
|
|
MGR (Class 6) |
|
|
|
4) |
"Reworking Base Material (Type D) (Class 1, 2 or 5) |
KM (Class 1), |
|
(Scarified Depth) (Compaction Method)" |
M2 (Class 2), |
|
|
M3 (Class 5) |
REFERENCE ITEMS
(204)
Go to Top
260 - LIME TREATMENT FOR MATERIALS USED AS SUBGRADE (ROAD MIXED)
SPECIFICATION REQUIREMENTS
1) Limits must be shown on the plans.
2) Width, depth and number of courses must be shown on the typical section(s).
3) Specify the type or types of lime to be used on the plans.
4) The percentage by mass or kilograms per square meter of lime to be added must be shown on the plans.
5) Type of compaction must be specified on the plans.
6) The completed section will be moist cured or prevented from drying by the addition of an
asphalt material. This material will be of the type shown on the plans.
OPTIONAL REQUIREMENTS
1) When proof rolling is required, it will be paid for in accordance with Item
216.
|
PAYMENT DESCRIPTION |
UNITS |
1) |
"Lime (Type Specified)" |
MGR |
2) |
"Lime Treated Subgrade (Ordinary Compaction) (Depth
Specified)" |
M2 |
3) |
"Lime Treated Subgrade (Density Control) (Depth Specified)" |
M3 |
REFERENCE ITEMS
(132, 204, 264, 300, 520)
Go to Top
262 - LIME TREATMENT FOR BASE COURSES (ROAD MIXED)
SPECIFICATION REQUIREMENTS
1) Limits must be shown on the plans.
2) Width, depth and number of courses must be shown on the plans.
3) Specify the type or types of lime to be used on the plans.
4) The percentage by mass or kilograms per square meter of lime to be added must
be shown on the plans.
5) Type of compaction must be specified on the plans.
6) The type and grade of the new flexible base must be shown on the plans. Furnishing and delivery
of new base will be paid for as "Flexible Base (Roadway Delivery)" in accordance with
subarticle 247.5.
7) The completed section will be moist cured or prevented from drying by the addition of an
asphalt material. This material will be of the type shown on the plans.
OPTIONAL REQUIREMENTS
1) When proof rolling is required, it will be paid for in accordance with Item
216.
|
PAYMENT DESCRIPTION |
UNITS |
1) |
"Lime (Type Specified)" |
MGR |
2) |
"Lime Treatment for Base Courses (Existing Base) |
|
|
(Compaction Method) (Depth Specified)" |
M2 |
3) |
"Lime Treatment for Base Courses (New Base) (Compaction Method) |
|
|
(Depth Specified)" |
M2 |
4) |
"Lime Treatment for Base Courses (New and Existing Base) |
|
|
(Compaction Method) (Depth Specified)" |
M2 |
REFERENCE ITEMS
(204, 247, 260, 264, 300, 520)
Go to Top
263 - LIME TREATED BASE (PLANT MIXED)
SPECIFICATION REQUIREMENTS
1) Limits must be shown on the plans.
2) Width, depth and number of courses must be shown on the typical section(s).
3) The percentage by mass of lime to be added must be shown on the plans.
4) The type and grade of the new flexible base must be shown on the plans.
5) The completed section will be moist cured or prevented from drying by the addition of an
asphalt material. This material will be of the type shown on the plans.
6) This is a plans quantity measurement Item when the lime treated base is measured by the square
meter of completed work or by the cubic meter in its completed and accepted final position.
OPTIONAL REQUIREMENTS
None
|
PAYMENT DESCRIPTION |
UNITS |
1) |
"Lime Treated Base (Plant Mix) (Density Control) |
|
|
(Depth Specified)" |
MGR, M2, M3 |
REFERENCE ITEMS
(204, 247, 264, 300, 340, 520)
Go to Top
264 - LIME AND LIME SLURRY
SPECIFICATION REQUIREMENTS
None
OPTIONAL REQUIREMENTS
None
PAYMENT AND MEASUREMENT
Lime will be measured and paid for in accordance with the governing specifications for the
items of construction in which lime is used.
REFERENCE ITEMS
None
Go to Top
265 - LIME-FLY ASH (LFA) TREATMENT FOR MATERIALS USED AS SUBGRADE
SPECIFICATION REQUIREMENTS
1) Limits must be shown on the plans.
2) Width, depth and number of courses must be shown on the typical section(s).
3) Specify the type or types of lime to be used on the plans.
4) The percentages by mass or kilograms per square meter of lime and fly ash to be added must be
shown on the plans.
5) Type of compaction must be specified on the plans.
6) The completed section will be moist cured or prevented from drying by the addition of an asphalt
material. This material will be of the type shown on the plans.
OPTIONAL REQUIREMENTS
1) When proof rolling is required, it will be paid for in accordance with Item 216.
|
PAYMENT DESCRIPTION |
UNITS |
1) |
"Lime (Type Specified)" |
MGR |
2) |
"Fly Ash" |
MGR |
3) |
"LFA Treated Subgrade (Compaction Method) (Depth Specified)" |
M2 |
REFERENCE ITEMS
(132, 204, 264, 300, 520)
Go to Top
266 - LIME-FLY ASH (LFA) TREATMENT FOR BASE COURSES (ROAD MIXED)
SPECIFICATION REQUIREMENTS
1) Limits must be shown on the plans.
2) Width, depth and number of courses must be shown on the typical section(s).
3) Specify the type or types of lime to be used on the plans.
4) The percentages by mass or kilograms per square meter of lime and fly ash to be added must be
shown on the plans.
5) Type of compaction must be specified on the plans.
6) The type and grade of the new flexible base must be shown on the plans. Furnishing and delivery of
new base will be paid for as "Flexible Base (Roadway Delivery)" in accordance with subarticle 247.5.
7) The completed section will be moist cured or prevented from drying by the addition of an asphalt
material. This material will be of the type shown on the plans.
OPTIONAL REQUIREMENTS
1) When proof rolling is required, it will be paid for in accordance with Item 216.
|
PAYMENT DESCRIPTION |
UNITS |
1) |
"Lime (Type Specified)" |
MGR |
2) |
"Fly Ash" |
MGR |
3) |
"LFA Treatment for Base Courses (Existing Base) |
|
|
(Compaction Method) (Depth Specified)" |
M2 |
4) |
"LFA Treatment for Base Courses (New Base) (Compaction Method) |
|
|
(Depth Specified)" |
M2 |
5) |
"LFA Treatment for Base Courses (New and Existing Base) |
|
|
(Compaction Method) (Depth Specified)" |
M2 |
REFERENCE ITEMS
(204, 247, 264, 265, 300)
Go to Top
275 - PORTLAND CEMENT TREATED MATERIALS (ROAD MIXED)
SPECIFICATION REQUIREMENTS
1) Limits must be shown on the plans.
2) Width and depth of courses must be shown on the typical section(s).
3) The strength must be shown on the plans.
4) When Strength N is specified, must show the minimum design compressive strength on the plans.
5) When Strength O is specified, must show the allowable cement content percentage on the plans.
6) Type of compaction must be specified on the plans.
7) The type and grade of the new flexible base must be shown on the plans. Furnishing and delivery of
new base will be paid for as "Flexible Base (Roadway Delivery)" in accordance with subarticle 247.5.
8) The completed section will be moist cured or prevented from drying by the addition of an asphalt
material. This material will be of the type shown on the plans.
OPTIONAL REQUIREMENTS
1) When proof rolling is required, it will be paid for in accordance with Item 216.
|
PAYMENT DESCRIPTION |
UNITS |
1) |
"Cement Treatment (Existing Material) (Strength Specified) |
|
|
(Depth Specified) (Compaction Method)" |
M2 |
2) |
"Cement Treatment (New Base) (Strength Specified) (Depth Specified) |
|
|
(Compaction Method)" |
M2 |
3) |
"Cement Treatment (Mixing Existing Material and New Base) |
|
|
(Strength Specified) (Depth Specified) (Compaction Method)" |
M2 |
4) |
"Cement" |
MGR |
REFERENCE ITEMS
(247, 300, 421, 520, 524)
Go to Top
276 - PORTLAND CEMENT TREATED BASE (PLANT MIXED)
SPECIFICATION REQUIREMENTS
1) Limits must be shown on the plans.
2) Width and depth of courses must be shown on the typical section(s).
3) The strength must be shown on the plans.
4) When Strength N is specified, must show the minimum design compressive strength on the plans.
5) When Strength O is specified, must show the allowable cement content percentage on the plans.
6) The type and grade of the new flexible base must be shown on the plans. Furnishing and delivery of
new base will be paid for as "Flexible Base (Roadway Delivery)" in accordance with subarticle 247.5.
7) The completed section will be moist cured or prevented from drying by the addition of an asphalt
material. This material will be of the type shown on the plans.
8) Measurement Class 4 and 5 are plans quantity measurement Items.
OPTIONAL REQUIREMENTS
1) When proof rolling is required, it will be paid for in accordance with Item 216.
|
PAYMENT DESCRIPTION |
UNITS |
1) |
"Cement Treated Base (Strength Specified) |
|
|
(Flexible Base Type and Grade Specified)" |
M3 (Class 1) |
2) |
"Cement Treated Base (Strength Specified) |
|
|
(Flexible Base Type and Grade Specified)" |
MGR (Class 2) |
|
|
|
3a) |
"Flexible Base (Strength Specified) |
MGR (Class 3) |
|
(Flexible Base Type and Grade Specified)" |
|
b) |
"Cement" |
MGR (Class 3) |
4a) |
"Flexible Base (Strength Specified) (Flexible Base Type and |
|
|
Grade Specified) (Depth Specified)" |
M2 (Class 4) |
b) |
"Cement" |
MGR (Class 4) |
5) |
"Cement Treated Base (Strength Specified) |
|
|
(Flexible Base Type and Grade Specified) (Depth Specified)" |
M2 (Class 5) |
REFERENCE ITEMS
(247, 300, 340, 421, 520, 524)
Go to Top
|