DIVISION VII - MAINTENANCE (Items 700 to 788)
Table of Contents
ITEM NO - TITLE AND REQUIREMENTS
700 - POTHOLE REPAIR
SPECIFICATION REQUIREMENTS
1) Check - Type of Material to be furnished by the
contractor: ACP, HMCL, LRA, Containerized patching material, etc.
and the Type.
2) Tack Coat type, or note if materials are to be furnished by the
State.
3) Show the minimum callout quantity.
PAYMENT DESCRIPTION |
UNITS |
1) "Pothole Repair (Standard)" |
SY, CY, TON, LB |
2) "Pothole Repair (Saw-Cut)" |
SY, CY, TON, LB |
3) "Emergency Mobilization" |
EA |
REFERENCE ITEMS
(300), (330), (334), (340)
Go to Top
712 - CLEANING AND SEALING JOINTS AND CRACKS
(ASPHALT CONCRETE)
SPECIFICATION REQUIREMENTS
1) Contractor furnishes materials unless otherwise shown
on the plans.
2) Show sealant material on the plans, such as hot poured asphalt
rubber, cold poured crack seal material or polymerized asphalt.
3) Show when routing of joints and cracks is required and dimensions
(width and depth).
4) Shoulders wider than 6 ft. are considered additional lanes.
5) Specify aggregate specifications if required.
PAYMENT DESCRIPTION |
UNITS |
1) "Joint and Crack Sealing (Sealant Material
Specified)" |
LF, MI, LB, GAL |
2) "Joint and Crack Sealing (Routing)" |
LF, MI, LB, GAL |
REFERENCE ITEMS
(300)
Go to Top
720 - REPAIR OF SPALLING IN CONCRETE PAVEMENT
SPECIFICATION REQUIREMENTS
1) Note if materials are to be furnished by the State
and location for material pickup.
If materials are to be furnished by the contractor, identify
type of material.
2) List type of elastomeric patching material.
3) Prepare table of locations and estimate of quantities.
Identify areas and dimensions for breaking back old concrete.
PAYMENT DESCRIPTION |
UNITS |
1) "Spalling Repair (Hydraulic Cement)" |
CF |
2) "Spalling Repair (Elastomeric) (Type
Specified)" |
GAL |
REFERENCE ITEMS
(421)
Go to Top
730 - ROADSIDE MOWING
SPECIFICATION REQUIREMENTS
1) Identify any specific equipment requirements.
2) Identify Non-Mow Areas.
3) Show tables of roads to be mowed including: County, Highway,
Beginning Laymans Description, Beginning Reference Marker, Ending
Laymans Description, Ending Reference Marker, Strip Acres, and
Full Width Acres.
4) Strip and Full-Width mowing are plans quantity items.
5) Spot mowing has a minimum acreage per work request is 3 acres.
6) Specify when washing equipment is required and counties affected
7) Specify Traffic Control requirements in general notes.
8) The following Statewide Standard Details Sheet is required for
mowing:
Mowing Standards
PAYMENT DESCRIPTION |
UNITS |
1) "Strip Mowing" |
AC |
2) "Full-Width Mowing" |
AC |
3) "Spot Mowing" |
AC |
REFERENCE ITEMS
None
Go to Top
734 - LITTER REMOVAL
SPECIFICATION REQUIREMENTS
1) Unless otherwise shown on the plans, Contractor
furnishes materials.
2) Show areas on litter removal.
3) Unless otherwise shown on the plans, spot litter removal is to be
performed within 2 hours of notification.
4) Spot litter will be paid a minimum of 3 acres per callout.
5) Identify traffic control requirements in notes.
PAYMENT DESCRIPTION |
UNITS |
1) "Litter Removal and Disposal (Litter)" |
AC, CYC |
2) "Litter Removal and Disposal (Spot Litter)" |
AC, CYC |
REFERENCE ITEMS
None
Go to Top
735 - DEBRIS REMOVAL
SPECIFICATION REQUIREMENTS
1) Show locations of debris removal on plans.
2) Center medians and mainlanes debris removal, frontage roads
debris removal, and entrance and exit ramps debris removal goes an
additional 5 ft. adjacent to the pavement, unless otherwise shown on
the plans.
3) For spot debris removal the Contractor is to respond within 2
hours of notification, unless otherwise shown on the plans.
A minimum of 1 roadbed mile will be paid per callout, unless
otherwise shown on the plans.
4) Traffic control will not be paid for directly but will be
subsidiary to this Item, unless otherwise shown on the plans.
5) Debris removal required for work orders issued under Item 734,
Litter Pickup, or Item 738, Cleaning and Sweeping
Highways, will be subsidiary to that Item unless otherwise shown
on the plans.
PAYMENT DESCRIPTION |
UNITS |
1) "Debris Removal and Disposal (Center
Medians and Mainlanes)" |
CYC, MI |
2) "Debris Removal and Disposal (Frontage
Roads)" |
CYC, MI |
3) "Debris Removal and Disposal (Entrance and
Exit Ramps)" |
CYC, MI |
4) "Debris Removal and Disposal (Spot
Debris)" |
MI |
REFERENCE ITEMS
None
Go to Top
738 - CLEANING AND SWEEPING HIGHWAYS
SPECIFICATION REQUIREMENTS
1) Designate on the plans pavement surfaces and other
areas which require debris removal.
Other areas could be all sides of raised pavement markers,
barrier drain slots, slotted drains. Inlet openings, attenuators,
and guardrails.
2) Spot sweeping requires response time period on the plans.
The minimum callout length is 1 shoulder mile.
3) Handwork areas need to be shown on the plans.
4) Specify traffic control requirements in notes.
5) Specify any specialized equipment requirements (example: Vacuum
sweeper).
PAYMENT DESCRIPTION |
UNITS |
1) "Cleaning and Sweeping (Center Median)" |
CYC, MI |
2) "Cleaning and Sweeping (Outside Main Lane)" |
CYC, MI |
3) "Cleaning and Sweeping (Frontage Road)" |
CYC, MI |
4) "Cleaning and Sweeping (Entrance and Exit
Ramp)" |
CYC, MI |
5) "Cleaning and Sweeping (Aggregate Removal)" |
MI |
6) "Cleaning and Sweeping (Spot)" |
MI |
7) "Cleaning and Sweeping (Handwork)" |
SY |
REFERENCE ITEMS
None
Go to Top
740 - GRAFFITI REMOVAL AND ANTI-GRAFFITI COATING
SPECIFICATION REQUIREMENTS
1) Furnish materials unless otherwise shown on the
plans.
2) Seal bare concrete surfaces with anti-graffiti coating as shown on
the plans.
3) Identify traffic control requirements.
PAYMENT DESCRIPTION |
UNITS |
1) "Graffiti Removal (Blast Cleaning)" |
SF, SY |
2) "Graffiti Removal (Painting)" |
SF, SY |
3) "Graffiti Removal (Chemical Cleaning)" |
SF, SY |
4) "Anti-Graffiti Coating (Type Specified)" |
SF, SY |
REFERENCE ITEMS
(427), (446)
Go to Top
745 - PICNIC AND REST AREA MAINTENANCE
SPECIFICATION REQUIREMENTS
1) Contractor to furnish materials and supplies unless
otherwise shown on the plans.
2) Show the number and location of picnic or rest areas, the number
of attendants, work days and specified staffing hours, frequency of
maintenance, and other scheduled work items.
3) Show on plans how often to perform rest areas services.
4) Unless otherwise shown on the plans certain services will be
performed daily for picnic and rest areas.
5) Show fertilize information.
6) Show the removal and disposal of grass and tree clippings, limbs,
leaves, and pine needles.
PAYMENT DESCRIPTION |
UNITS |
1) "Janitorial Maintenance (Rest Areas) (Number of
Hours per Day Specified)" |
MO |
2) "Janitorial Maintenance (Picnic Areas)" |
MO, CYC |
3) "Grounds Maintenance" |
MO, CYC |
REFERENCE ITEMS
(740)
Go to Top
751 - LANDSCAPING MAINTENANCE
SPECIFICATION REQUIREMENTS
1) Unless otherwise shown on the plans materials will be
furnished in accordance with Article 193.2., Materials.
2) Furnish equipment and tools as shown on the plans.
3) State what additional maintenance to plants within plant beds is
required.
4) Show watering areas that do not have an irrigation system.
5) Show deficiencies in irrigation system that need initial repair.
6) Unless otherwise shown on the plans, apply and maintain mulch at 2
in.
7) Areas and species to be mulched will be shown on the plans.
8) Show fertilizer application information on the plans.
PAYMENT DESCRIPTION |
UNITS |
1) "Mowing, Trimming, and Edging" |
AC, CYC |
2) "Litter Pickup" |
AC, CYC |
3) "Pruning" |
CYC |
4) "Plant Bed Maintenance" |
CYC |
5) "Vegetative Watering" |
MG |
6) "Irrigation System Operation and Repair" |
MO |
7) "Mulching and Reshaping of Plant Beds" |
CYC |
8) "Herbicide Application" |
CYC |
9) "Fertilizer Application" |
CYC |
REFERENCE ITEMS
(193), (730), (734), (745)
Go to Top
752 -TREE AND BRUSH REMOVAL
SPECIFICATION REQUIREMENTS
1) Show the trees to be removed with diameter on the
plans.
2) Show the limits of tree
limb removal.
3) Show the limits of underbrush removal.
Also show the limits of underbrush removal from under bridges,
around culverts, and in channels.
4) Identify traffic control requirements.
PAYMENT DESCRIPTION |
UNITS |
1) "Tree Removal (Diameter Specified)" |
EA |
2) "Tree Trimming" |
MI |
3) "Brush Removal" |
MI |
4) "Tree Trimming and Brush Removal (Channel)" |
AC |
REFERENCE ITEMS
None
Go to Top
760 - CLEANING AND RESHAPING DITCHES
SPECIFICATION REQUIREMENTS
1) Show limits of excavation. Show the lines, grades,
and typical cross-sections of reshaped ditches.
PAYMENT DESCRIPTION |
UNITS |
1) "Ditch Cleaning and Reshaping (Foot)" |
LF |
2) "Ditch Cleaning and Reshaping (In
Place)" |
CY |
3) "Ditch Cleaning and Reshaping (In
Vehicle)" |
CY |
REFERENCE ITEMS
None
Go to Top
764 - PUMP STATION AND DRAINAGE SYSTEM CLEANING SPECIFICATION REQUIREMENTS
1) contractor to furnish all materials unless otherwise
shown on the plans.
2) If shown on the plans, a debris storage bin and an air conveying
vacuum system can be required for items besides pump station and
basket and inlet pipe cleaning.
3) Clean inlet pipes a minimum distance of 10 ft. unless otherwise
shown on the plans.
4) Show the required distance for storm sewer cleaning.
PAYMENT DESCRIPTION |
UNITS |
1) "Drain Inlet Cleaning" |
EA |
2) "Pump Station Well Cleaning" |
EA |
3) "Basket and Inlet Pipe Cleaning" |
EA |
4) "Downspout Cleaning" |
EA |
5) "Sump Cleaning" |
EA |
6) "Storm Sewer Cleaning (Diameter or Size
Specified)" |
LF |
7) "Slotted Drain Cleaning" |
LF |
REFERENCE ITEMS
None
Go to Top
770 - GUARD FENCE REPAIR
SPECIFICATION REQUIREMENTS
1) Contractor furnishes materials unless otherwise shown
on the plans.
2) Replace guard fence and end treatments as shown on the plans.
3) For non-site specific contracts, indicate minimum work order
quantities and maximum response time.
PAYMENT DESCRIPTION |
UNITS |
1) "Repair Rail Element (W-Beam)" |
LF |
2) "Repair Rail Element (Thrie-Beam)" |
LF |
3) "Repair Rail Element (Thrie Beam Transition to
W-Beam) |
LF |
4) "Remove and Replace Timber or Steel Posts without
Concrete Foundation" |
EA |
5) "Remove and Replace Timber or Steel Posts with
Concrete Foundation" |
EA |
6) "Realign Posts" |
EA |
7) "Repair Terminal Anchor Posts" |
EA |
8) "Replace Terminal Anchor Posts" |
EA |
9) "Remove Guardrail End Treatment and Replace with
SGT" |
EA |
10) "Replace Single Guardrail Terminal Impact
Head" |
EA |
11) "Replace Single Guardrail Terminal Head" |
EA |
12) "Replace Single Guardrail Terminal Post" |
EA |
13) "Replacing Steel Blockouts with Wood Blockouts" |
EA |
14) "Repair Steel Post with Base Plate" |
EA |
REFERENCE ITEMS
(421)(429)(441)(445)(448)(540)(542)(544)
Go to Top
772 - POST AND CABLE FENCE
SPECIFICATION REQUIREMENTS
1) Contractor to furnish materials unless otherwise
shown on the plans.
2) Show the class of concrete to be used.
3) Show type and number of reflectors on the plans.
4) Unless otherwise shown on the plans, all materials removed become
the property of the Contractor.
5) Show the location for placement of new anchors, posts, and cable.
6) Painting is not required, unless otherwise shown on the plans.
7) The following Statewide Standard Details Sheet is required for the
placement of post and cable fence:
Post and Cable Fence
PAYMENT DESCRIPTION |
UNITS |
1) "Post and Cable Fence (Removal)" |
LF |
2) "Post and Cable Fence (Remove Concrete Anchor)" |
EA |
3) "Post and Cable Fence (New Installation)" |
LF |
4) "Post and Cable Fence (New Concrete Anchor)" |
EA |
5) "Post and Cable Fence (Remove and Replace
Posts)" |
EA |
6) "Post and Cable Fence (Remove and Replace Concrete
Anchors)" |
EA |
7) "Post and Cable Fence (Remove and Replace
Cable)" |
LF |
REFERENCE ITEMS
(421)
Go to Top
774 - ATTENUATOR REPAIR
SPECIFICATION REQUIREMENTS
1) Note if materials are to be furnished by the State and
location for material pickup.
2) Show the type of replacement attenuator.
3) For non-site specific contracts, indicate minimum work order
quantities and maximum response time.
PAYMENT DESCRIPTION |
UNITS |
1) "Remove and Replace (Type Specified)" |
EA |
2) "Repair (Type Specified)" |
EA, LF |
REFERENCE ITEMS
(448)
Go to Top
776 - METAL RAIL REPAIR
SPECIFICATION REQUIREMENTS
1) Furnish materials in accordance with Item 450,
Railing, unless otherwise shown on the plans.
2) Repair to match the original rail or details as shown on the plans.
3) Designate stockpile site.
4) For non-site specific contracts, indicate minimum work order
quantities and maximum response time.
PAYMENT DESCRIPTION |
UNITS |
1) "Repair (Type of Bridge Rail Specified)" |
LF |
2) "Repair Steel Post with Base Plate (Type
Specified)" |
EA |
REFERENCE ITEMS
(441), (445), (448), (450)
Go to Top
780 - EPOXY INJECTION
SPECIFICATION REQUIREMENTS
1) Show location of cracks to be injected.
PAYMENT DESCRIPTION |
UNITS |
1) "Epoxy Injection (Type Specified)" |
LF, GAL, LS |
REFERENCE ITEMS
(421)
Go to Top
784 - STEEL BRIDGE MEMBER REPAIR
SPECIFICATION REQUIREMENTS
1) Show restraining forces on the plans.
2) Show section replacement on the plans.
3) Paint repaired area only unless otherwise shown on plans.
4) Use Protection System II, unless otherwise shown on the plans.
5) Pay as a steel beam or girder over the length of 1 span, unless
otherwise shown on the plans.
6) Pay for repair of other elements shown on the plans.
PAYMENT DESCRIPTION |
UNITS |
1) "Steel Bridge Member Repair (Bridge)" |
LS |
2) "Steel Bridge Member Repair (Type Specified)" |
EA |
REFERENCE ITEMS
(421), (441), (442), (446), (448), (780)
Go to Top
788 - CONCRETE BEAM REPAIR
SPECIFICATION REQUIREMENTS
1) Specify repair material
strength if more than 5,000 psi or different from item 429.
2) Repair damaged prestressed concrete beams by patching spalls, and
injecting cracks as shown on the plans.
3) If shown on the plans, preload the damaged beam prior to repair
work.
4) If shown on the plans, remove and replace damaged Bridge Protective
Assembly.
5) Provide supplemental reinforcing as shown on the plans.
6) Show approximate quantities of beam repair on the plans for the
Contractors information only. Indicate approximate
surface repair areas square foot and crack injection
lengths by the foot.
PAYMENT DESCRIPTION |
UNITS |
1) "CONC BM REPAIR" |
EA |
2) "CONC BM REPAIR PLUS STRAND SPLICE" |
EA |
3) "CONC BM REPAIR PLUS CFRP" |
EA |
4) "CONC BM REP PLUS STRD SPLICE AND CFRP" |
EA |
REFERENCE ITEMS
(426), (427), (429), (441), (442), (780)