DIVISION IV - STRUCTURES (Items 472 through 499)
Table of Contents
ITEM NO. - TITLE AND REQUIREMENTS
472 - REMOVING AND RE-LAYING
CULVERT AND STORM DRAIN PIPE
SPECIFICATION REQUIREMENTS
1) Locations
must be shown on plans.
2) Details
of work to be shown in plans
PAYMENT DESCRIPTION |
UNITS |
1) "Removing and Re-laying Pipe (Size Specified)" |
LF |
REFERENCE ITEMS
Required
(400)
Optional
(460) When
corrugated metal pipe is required.
(464) When reinforced concrete pipe is required.
(476) When jacking, boring, or tunneling of pipe is required.
Go to Top
473 - LAYING CULVERT AND
STORM DRAIN PIPE
SPECIFICATION REQUIREMENTS
1) Locations
and details must be shown on plans.
2) Materials
furnished to be shown in plans.
PAYMENT DESCRIPTION |
UNITS |
1) "Laying Pipe (Size
Specified)" |
LF |
REFERENCE ITEMS
Required
(400)
Optional
(460) When corrugated metal pipe is required.
(464) When reinforced concrete pipe is required.
(476) When jacking, boring, or tunneling of pipe is required.
Go to Top
474 - SLOTTED DRAIN
SPECIFICATION REQUIREMENTS
1) This is a
plans quantity measurement item.
2) Type
is either steel or aluminum-coated steel.
PAYMENT DESCRIPTION |
UNITS |
1) |
"Slotted Drain (Type) Pipe Diameter
Specified)" |
LF |
2) |
"Slotted Drain Outfall (Type) (Pipe Diameter
Specified)" |
LF |
REFERENCE ITEMS
(400), (445), (460)
Go to Top
476 - JACKING, BORING OR
TUNNELING PIPE OR BOX
SPECIFICATION REQUIREMENTS
1) Specify
the type of pipe to be used when jacking, boring, or tunneling pipe on the
plans.
2) This is a
plans quantity measurement item.
3) This item
includes payment for the pipe or box. Do not include a separate pay item.
OPTIONAL
REQUIREMENTS
1) When
required, protection methods for excavations greater than five (5)
feet in depth will be measured and paid for as required under Item
402, Trench Excavation Protection, or Item 403, Temporary
Special Shoring.
2) When
corrugated metal pipe is being jacked, bored, or tunneled, it will be
in accordance with Item 460.
3) When
reinforced concrete pipe is being jacked, bored, or tunneled, it will
be in accordance with Item 464.
4) When
reinforced concrete box is jacked, it will be in accordance with Item
462.
|
PAYMENT DESCRIPTION |
UNITS |
1) |
"Jacking, Boring, or Tunneling Pipe (Type
Specified) (Size Specified) (Class Specified)" |
LF |
2) |
"Jacking, Boring, or Tunneling Pipe (Type
Specified) (Size Specified) (Design Specified)" |
LF |
3) |
"Jacking or Tunneling Box Culvert (Size
Specified)" |
LF |
REFERENCE ITEMS
Required
None
Optional
(460) When corrugated metal pipe is required.
(462) When concrete box culvert is required.
(464) When reinforced concrete pipe is required.
Go to Top
479 - ADJUSTING MANHOLES AND
INLETS
SPECIFICATION REQUIREMENTS
1) Adjusted
to positions, dimensions, and/or elevations as shown on plans.
2) Capping
details must be shown on plans.
PAYMENT DESCRIPTION |
UNITS |
1) |
"Adjusting Manholes" |
EA |
2) |
"Adjusting Inlets" |
EA |
3) |
"Adjusting Manholes and Inlets" |
EA |
REFERENCE ITEMS
(400), (421), (465)
Go to Top
480 - CLEANING EXISTING
CULVERTS
SPECIFICATION REQUIREMENTS
1) Locations must be shown on the plans.
PAYMENT DESCRIPTION |
UNITS |
1) |
"Cleaning Existing Culverts" |
CY, EA |
REFERENCE ITEMS
None
Go to Top
481 - PVC PIPE FOR
DRAINS
SPECIFICATION REQUIREMENTS
1) Locations
of PVC pipe must be shown on plans.
2) The sizes
and types of PVC pipe must be shown on plans.
3) Details
of any fittings, hangers, clamps, straps, anchors, and guard plates, including
any material requirements, must be shown on the plans.
PAYMENT DESCRIPTION |
UNITS |
1) |
"PVC Pipe (Size Specified) (Type
Specified)" |
LF |
REFERENCE ITEMS
(400)
Go to Top
483 - SCARIFYING CONCRETE
BRIDGE SLAB
SPECIFICATION REQUIREMENTS
1) Depth
must be shown on plans.
2) Locations
and/or areas must be shown on plans.
PAYMENT DESCRIPTION |
UNITS |
1) |
"Scarifying Concrete Bridge Slab" |
SY |
REFERENCE ITEMS
None
Go to Top
490 - TIMBER STRUCTURES
SPECIFICATION REQUIREMENTS
1) This
Item should be utilized for construction of structures or portions of
structures.
2) Need
paint note in the plans or General Notes and Specification Data if painting is
required.
3) Size,
type, length, and details of the required hardware must be shown on the plans.
4) Sizes
of timber must be shown in the plans.
5) Details
of work to be shown in plans
PAYMENT AND MEASUREMENT
Subsidiary to Item 491.
REFERENCE ITEMS
(445), (491), (492)
Go to Top
491 TIMBER FOR STRUCTURES
SPECIFICATION REQUIREMENTS
1) Details
for sizes and cut to be shown on the plans.
2) This
Item should be utilized for construction of structures or portions of
structures.
3) Surface
finish to be shown on the plans.
4) Type
and grade of timber to be shown on the plans.
PAYMENT DESCRIPTION |
UNITS |
1) |
"Treated Timber" |
MBF |
2) |
"Untreated Timber" |
MBF |
REFERENCE ITEMS
(490), (492)
Go to Top
492 - TIMBER PRESERVATIVE AND
TREATMENT
SPECIFICATION REQUIREMENTS
1) This
Item governs for the treatment of lumber and timber with preservative.
PAYMENT AND MEASUREMENT
Subsidiary to the various bid items in the contract.
REFERENCE ITEMS
None
Go to Top
495 - RAISING EXISTING
STRUCTURES
SPECIFICATION REQUIREMENTS
1) Location
of structure(s) to be raised must be shown on plans.
2) Indicate
any special lifting restrictions (e.g., jack locations) on the drawings.
3) Include
pedestal details.
PAYMENT DESCRIPTION |
UNITS |
1) |
"Raising Existing Structure" |
LS |
REFERENCE ITEMS
Optional
(442), (448) When metal pedestals are allowed.
(420), (421), (440) When concrete pedestals are allowed.
(434) When elastomeric bearings are required.
Go to Top
496 - REMOVING STRUCTURES
SPECIFICATION REQUIREMENTS
1) Location
of cuts in beams to be salvaged must be shown on plans.
2) For
steel structures to be removed, test paint for contamination. Provide the test
results to the Contractor by general note.
3) Designate
material to be salvaged in the plans.
4) Designate
storage site for salvaged material in the plans.
PAYMENT DESCRIPTION |
UNITS |
1) |
"Removing Structure (Type Specified)" |
EA, LF |
REFERENCE ITEMS
Optional
(430) When portions of existing structure are to remain in place.
Go to Top
497 - SALE OF SALVAGEABLE
MATERIAL
SPECIFICATION REQUIREMENTS
1) Quantity to be shown on the plans.
PAYMENT DESCRIPTION |
UNITS |
1) |
"Salvaged Material (Credit Item)" |
LS |
REFERENCE ITEMS
None
Go to Top
499 - ADJUSTING STEEL SHOES
SPECIFICATION REQUIREMENTS
1) The
locations for adjusting steel shoes must be shown on plans or as required by the
Engineer.
2) Include a note on the plans specifying that the existing paint on the
beams and shoes contains lead and/or other hazardous materials.
3) Details
for adjusting steel shoes on a structure must be shown on plans.
4) Indicate if any
beam ends are to be trimmed.
5) Indicate
shoe design or jack capacity on the plans.
6) Show any
concrete spalling to be repaired that will be paid for using Item 429. Concrete
repair is paid for and constructed using Item 429.
PAYMENT DESCRIPTION |
UNIT |
1) "Adjusting Steel Shoes" |
EA |
REFERENCE ITEMS
(429), (441), (442),
(446), (448)
Go to Top
|