5010 - Transportable Cellular Telephones
SPECIFICATION REQUIREMENTS
1) Show the number of transportable cellular telephones required on the plans.
MEASUREMENT AND PAYMENT
Subsidiary to pertinent Items
REFERENCE ITEMS
None
Go to Top
5049 - Biodegradable Erosion Control Logs
SPECIFICATION REQUIREMENTS
1) Show the location for placement of biodegradable erosion control logs on the plans.
2) Removing accumulated sediment deposits with be paid for under Item 506.
PAYMENT DESCRIPTION |
UNITS |
1) "Biodegradable Erosion Control Logs (Size Specified)" |
LF |
REFERENCE ITEMS
161, 506
Go to Top
5165 - Geogrid Reinforcement for Embankments
SPECIFICATION REQUIREMENTS
1) Show the location, lines and grades for placement of geogrid reinforcement on the plans.
2) Show the requirements for Type B on the plans.
3) Show on the plans the fill material's lift thicknesses and the compaction
requirements.
PAYMENT DESCRIPTION |
UNITS |
1) "Geogrid Reinforcement for Embankment (Type
Specified)" |
SY |
REFERENCE ITEMS
None
Go to Top
5367 - Cable Barrier System
SPECIFICATION REQUIREMENTS
1) Show the location for placement of cable barrier system and cable barrier
terminal sections on the plans.
2) Details for the approved barrier systems may be requested from the Roadway
Design Section.
PAYMENT DESCRIPTION |
UNITS |
1) "Cable Barrier System (Test Level Specified)" |
LF |
2) "Cable Barrier System (Test Level Specified)(Post
Spacing Specified)" |
LF |
3) "Cable Barrier Terminal Section (Test Level
Specified)" |
EA |
REFERENCE ITEMS
421, 658
Go to Top
5369 - Centerline Texturing
SPECIFICATION REQUIREMENTS
1) Show the location for centerline texturing on the plans.
PAYMENT DESCRIPTION |
UNITS |
1) "Centerline Texturing" |
STA |
REFERENCE ITEMS
None
Go to Top
5434 - Precast Concrete Wheel Stops
SPECIFICATION REQUIREMENTS
1) Show the location for wheel stops on the plans.
2) Show the anchoring method and anchor rod type.
PAYMENT DESCRIPTION |
UNITS |
1) "Wheel Stops" |
EA |
REFERENCE ITEMS
421, 440
Go to Top
5414 - Asbestos Abatement
SPECIFICATION REQUIREMENTS
1) Show the location for abating and removing asbestos containing materials
(ACM) on public facilities.
PAYMENT DESCRIPTION |
UNITS |
1) "Asbestos Abatement (Coatings)" |
SF |
2) "Asbestos Abatement (Conduit)" |
LF |
3) "Asbestos Abatement (Other)" |
CF |
REFERENCE ITEMS
None
Go to Top
5445 - Dead End Roadway Barricade
SPECIFICATION REQUIREMENTS
1) Show the location for placing dead end roadway barricades.
2) Placed Traffic Operations Division Standard Sheet, "Dead End Roadway
Details" (DERD) in the plans.
3) Signs, sign supports, and chevrons, when required by the plans, will be
paid for under Item 644, "Small Roadside Sign Supports and Assemblies."
PAYMENT DESCRIPTION |
UNITS |
1) "Dead End Roadway Barricade" |
LF |
REFERENCE ITEMS
None
Go to Top
5522 - Retrofit Detectable Warning Surface
SPECIFICATION REQUIREMENTS
1) Furnish and install detectable warning surface on existing otherwise
compliant curb ramps or flush landings as shown on the plans or as directed.
2) Provide only detectable warning surface material that is on the
approved material producer list.
PAYMENT DESCRIPTION |
UNITS |
1) "Retrofit Detectable Warning Surface" |
SF |
REFERENCE ITEMS
None
Go to Top
5561 - Safety Rest Areas
SPECIFICATION REQUIREMENTS
1) This is a generic specification number for safety rest areas for payment
purposes.
2) This specification probably will have attachments that are not on the
proposal system.
PAYMENT DESCRIPTION |
UNITS |
1) "Safety Rest Area" |
LS |
REFERENCE ITEMS
None