2004 Statewide Special Specifications
(Items 6000 to 6999)
Last Updated (05/23/2008)
This document is provided for information only and is not to be used for
bidding or contract purposes.
Click here to return to Index Page
Table of Contents
NO. TITLE AND REQUIREMENTS
6004 - DIGITAL CARD RACK INDUCTIVE LOOP
DETECTOR ASSEMBLY
SPECIFICATION REQUIREMENTS
1) Show detector panels, units, card racks, and power supplies to
be installed on the plans.
PAYMENT
DESCRIPTION
|
UNITS
|
1)
"DETECTOR UNIT"
|
EA
|
2)
"DETECTOR CARD RACK"
|
EA
|
3)
"POWER SUPPLY"
|
EA
|
REFERENCE ITEMS
(6011), (6013)
Go to Top
6005
- Uninterruptible Power
Supply
SPECIFICATION
REQUIREMENTS
1) Show the locations and types of uninterruptible power supplies
on the plans.
PAYMENT
DESCRIPTION
|
UNITS
|
1)
"UPS (Type Specified)"
|
EA
|
REFERENCE ITEMS
(6011), (6013)
Go to Top
6006 - Spread Spectrum Radios
for Traffic Signals
SPECIFICATION
REQUIREMENTS
1) Show the locations of spread spectrum radios to be installed
on the plans.
2) Show locations and types of antennas to be installed on
the plans.
3) Show locations and types of cables to be installed on the plans.
PAYMENT
DESCRIPTION
|
UNITS
|
1)
"SPREAD SPECTRUM RADIO"
|
EA
|
2)
"ANTENNA (Type Specified)"
|
EA
|
3)
"COAXIAL CABLE"
|
LF
|
4)
"HELIAX CABLE"
|
LF
|
REFERENCE ITEMS
None
Go to Top
6007
- Removing Traffic Signals
SPECIFICATION
REQUIREMENTS
1) Show the locations of traffic signals to be removed on the plans.
2) Show the traffic signal items to be salvaged on the plans.
3) Show the locations where traffic signal items are to be stored
on the plans.
PAYMENT
DESCRIPTION
|
UNITS
|
1)
"REMOVE TRAFFIC SIGNALS"
|
EA
|
REFERENCE
ITEMS
None
Go to Top
6008 - Shifting or Removing
Existing Overhead Signs
SPECIFICATION
REQUIREMENTS
1) Show any sign components that are removed and are to be reused
on the plans.
2) Show the locations of overhead signs to be shifted on the plans.
3) Show the locations of overhead signs to be removed on the plans.
PAYMENT
DESCRIPTION
|
UNITS
|
1)
"SHIFT OVHD SIGN PANEL"
|
EA
|
2)
"REMOVE OVHD SIGN PANEL"
|
EA
|
REFERENCE
ITEMS
(634), (636), (652), (654)
Go to Top
6009 - ITS System Support
Equipment
SPECIFICATION
REQUIREMENTS
1) Show types of operational equipment to be provided on the plans.
2) Show types of test equipment to be provided on the plans.
PAYMENT
DESCRIPTION
|
UNITS
|
1)
"ITS SYSTEM SUPPORT EQUIPMENT"
|
LS
|
REFERENCE
ITEMS
(6011)
Go to Top
6010 - Communication Cable
SPECIFICATION
REQUIREMENTS
1) Show the number of pairs to be installed on the plans.
2) Show locations of termination strips on the plans.
3) When required, show the number of telephone hand sets to be
provided on the plans.
PAYMENT
DESCRIPTION
|
UNITS
|
1)
"COMMUNICATION CABLE (Type Specified)"
|
LF
|
REFERENCE
ITEMS
None
Go to Top
6011 - Testing, Training,
Documentation, Final Acceptance and Warranty
SPECIFICATION
REQUIREMENTS
1) Show when tests are not required on the plans.
2) Show when training is required on the plans.
3) Show additional documentation requirements on the plans.
PAYMENT
AND MEASUREMENT
Subsidiary
to the various bid items in the contract.
REFERENCE
ITEMS
None
Go to Top
6012 - Dial-Up Modem
SPECIFICATION
REQUIREMENTS
1) Show locations and types of dial-up modems to be installed on
the plans.
PAYMENT
DESCRIPTION
|
UNITS
|
1)
"DIAL-UP MODEM (Type Specified)"
|
EA
|
REFERENCE
ITEMS
(6011), (6013)
Go to Top
6013 - Electronic Components
SPECIFICATION
REQUIREMENTS
1) Show when component design operations is not 24/7/365 for 10
years on the plans.
PAYMENT
AND MEASUREMENT
Subsidiary
to the various bid items in the contract.
REFERENCE
ITEMS
None
Go to Top
6014 - Fiber Optic Cable
SPECIFICATION
REQUIREMENTS
1) Show the number of fibers to be installed on the plans.
2) Show locations for coiling cable on the plans.
3) Show locations for splices on the plans.
4) Show locations for splice tray housings on plans, e.g. cabinet,
building.
5) Show types of connectors on plans when not using ST or FC.
6) Show locations, types, and number of fiber distribution
housings/units on the plans.
7) Show
locations, types, lengths, and number of fiber optic jumper
cables/pigtails on the plans.
PAYMENT
DESCRIPTION
|
UNITS
|
1)
"FIBER OPTIC CABLE SYSTEM (Type Specified)"
|
LF
|
REFERENCE
ITEMS
(6011), (6013)
Go to Top
6015 - ISDN Compressed Video
Equipment
SPECIFICATION
REQUIREMENTS
1) Show locations of ISDN compressed video equipment to be
installed on the plans.
PAYMENT
DESCRIPTION
|
UNITS
|
1)
"ISDN Comp Video Equip (Field)"
|
EA
|
2)
"ISDN Comp Video Equip (Central)"
|
EA
|
3)
"Smart Shelf (Central)"
|
EA
|
4)
"ISDN test set"
|
EA
|
REFERENCE
ITEMS
(6011), (6013), (6025), (ISDN Network Termination Unit)
Go to Top
6016 - ITS Field Equipment
Cabinet
SPECIFICATION
REQUIREMENTS
1) Show the locations and types of ITS field cabinets to be
installed on the plans.
2) Show type of equipment housed in the cabinet on the plans.
3) Show additional panels needed on the plans.
4) When used, show the locations of uninterruptible power
supplies on the plans.
5) Show type of duplex service outlets on the plans.
6) Show locations and sizes of main circuit breakers on the plans.
7) Show
locations and ratings of radio interference suppressors on the plans.
8) Show
locations and designs of communication interface panels on the plans.
9) Show
locations and sizes of cabinet foundation mounting holes on plans when
not using four 1 in. holes.
10) Show
locations of adjustable shelves in cabinets on the plans.
11) Show
thickness of cabinets on plans when not using 0.125 in.
12) When
needed, show locations of auxiliary police doors on the plans.
PAYMENT
DESCRIPTION
|
UNITS
|
1)
"EQUIPMENT CABINET (Type Specified)"
|
EA
|
REFERENCE
ITEMS
(618), (656), (687), (6004), (6005), (6011), (6013), (6019), (6025),
(6027)
Go to Top
6017 - Local Control Unit (LCU)
Interface to Field Equipment
SPECIFICATION
REQUIREMENTS
1) Specify communication tests on the plans.
2) Show number of LCU power cables to be installed on the plans.
3) Show number of LCU signal cables to be installed on the plans.
4) Show number of local communications interface panels to be
installed on the plans.
5) Show number of cabinet backpanels to be installed on the plans.
6) Show number of voiced powered communications headsets to be
installed on the plans.
7)
Show number of RS-232C serial cables to be installed on the plans.
8)
Show number of shielded null modems to be installed on the plans.
9)
Show number of system detector panels to be installed on the plans.
10)
Show number of door switches to be installed on the plans.
PAYMENT
AND MEASUREMENT
Subsidiary
to the various bid items in the contract.
REFERENCE
ITEMS
(6019)
Go to Top
6018 - Limited Distance Modem
SPECIFICATION
REQUIREMENTS
1) Show locations and types of limited distance modems to be
installed on the plans.
2) Show locations of modem cards to be installed on plans when
more than 6 is required.
PAYMENT
DESCRIPTION
|
UNITS
|
1)
"limited distance modem (stand alone)"
|
EA
|
2)
"limited distance modem (rack mounted)"
|
EA
|
REFERENCE
ITEMS
(6011), (6013)
Go to Top
6019 - Local Control Unit
SPECIFICATION
REQUIREMENTS
1) Show locations of local control units to be installed on the plans.
2) Show interior front panel schematic on the plans.
PAYMENT
DESCRIPTION
|
UNITS
|
1)
"LOCAL CONTROL UNIT"
|
EA
|
REFERENCE
ITEMS
None
Go to Top
6020 - Surveillance System
Loop
Detector
SPECIFICATION
REQUIREMENTS
1) Show locations and types of surveillance loop detectors to be
installed on the plans.
2) Show number of turns for loop detectors on the plans.
3) Show locations of curbs, pavements, or walks to be cut or
removed on the plans.
4) Show locations of conduit to be installed between pavement
edge and ground box on the plans.
5) Show labels for loop wire and lead-in on the plans.
PAYMENT
DESCRIPTION
|
UNITS
|
1)
"SYSTEM LOOP DETECTOR"
|
EA
|
REFERENCE
ITEMS
(421), (618), (620), (684), (688), (6011)
Go to Top
6022 - Rack Mounted Electronic
Equipment Cabinet
SPECIFICATION
REQUIREMENTS
1) Show locations and types of rack mounted equipment cabinets to
be installed on the plans.
2) When used, show the locations of uninterruptible power
supplies on the plans.
PAYMENT
DESCRIPTION
|
UNITS
|
1)
"rack mounted
electronic equipment cabinet"
|
EA
|
REFERENCE
ITEMS
(6005), (6011), (6013)
Go to Top
6023 - LED DYNAMIC Message Sign
System
SPECIFICATION
REQUIREMENTS
1) Show the locations of DMS equipment to be installed on the plans.
2) Show the sign sizes on plans. i.e. number of rows and modules
per row.
3) When required, show locations of flashing beacons to be
installed on the plans.
4) Show wind load on plans, if not 120 mph.
5) Show walk-in housing dimensions and weight on the plans.
6) When required, show location of sign walkways on the plans.
7)
When required, show special graphics characters.
8)
Show the locations of the ground control boxes on the plans.
9)
Show the locations of the HOV lane control panels on the plans.
10)
Show the locations of HOV interconnection cables on the plans.
PAYMENT
DESCRIPTION
|
UNITS
|
1)
"led dms field
equipment (18 in)"
|
EA
|
REFERENCE
ITEMS
(6011), (6012), (6013), (6018), (6026)
Go to Top
6024 - Fiber Optic Dynamic
Message Sign System
SPECIFICATION
REQUIREMENTS
1) Show the locations of DMS equipment to be installed on the plans.
2) Show the sign sizes on plans. i.e. number of rows and
characters per row.
3) When required, show locations of flashing beacons to be
installed on the plans.
4) Show wind load on plans, if not 120 mph.
5)
Show locations of inspection doors on plans. i.e. front or rear of
housing.
6)
When required, show special graphics characters.
7)
Show the locations of the sign controller cabinet on the plans.
8)
Show locations of controller foundations on the plans.
9)
Show the locations of the HOV lane control panels on the plans.
10)
Show the locations of HOV interconnection cables on the plans.
PAYMENT
DESCRIPTION
|
UNITS
|
1)
"fiber optic dms field equipment (Size
Specified)"
|
EA
|
2)
"fiber optic dms master equipment"
|
EA
|
REFERENCE
ITEMS
(6011), (6012), (6013), (6018), (6026)
Go to Top
6025 - CCTV Field Equipment
SPECIFICATION
REQUIREMENTS
1) Show the locations of CCTV equipment to be installed on the plans.
2) Show wind load on plans, if not 80 mph.
3) Show the communications transmission interface on the plans.
4) When control receivers need to be compatible, show the
existing camera controller information on the plans.
5) Show the location of video communication junction boxes on the
plans.
PAYMENT
DESCRIPTION
|
UNITS
|
1)
"cctv field equipment"
|
EA
|
REFERENCE
ITEMS
(6011), (6013)
Go to Top
6026 - National Transportation
Communications for ITS Protocol for Dynamic Message Signs
SPECIFICATION
REQUIREMENTS
None
PAYMENT
AND MEASUREMENT
Subsidiary
to the various bid items in the contract.
REFERENCE
ITEMS
None
Go to Top
6027 - Lane Control Signal
Equipment
SPECIFICATION
REQUIREMENTS
1) Show locations and number of lane control signals to be
installed on the plans.
2) Show locations of LCS control panels to be installed on the plans.
3) Show locations and types of cables to be installed on the plans.
4) Show the grounding of support bracket and field cabinet on the
plans.
5) Show the locations and types of conduit and ground boxes to be
installed on the plans.
6)
New conduit will be paid for under Item 618, Conduit. New
conductors will be paid for under Item 620, Electrical
Conductors. New ground boxes will be paid for under Item 624,
Ground Boxes. New traffic signal cables will be paid for under
Item 684, Traffic Signal Cables.
PAYMENT
DESCRIPTION
|
UNITS
|
1)
"lane control signal equipment"
|
EA
|
2)
"lane control signal equipment (remote)"
|
EA
|
REFERENCE
ITEMS
(446), (6011), (6013)
Go to Top
6040 - HORIZONTAL
SIGN LIGHT
SPECIFICATION
REQUIREMENTS
1) Show locations and number of horizontal sign lights to be
installed on plans.
PAYMENT AND
MEASUREMENT
Subsidiary to the
various bid items in the contract.
REFERENCE ITEMS
(616)
Go to Top
6041 - INTERNALLY
LIGHTED STREET NAME SIGN ASSEMBLIES
SPECIFICATION
REQUIREMENTS
1) Show locations and number of internally lighted street name
sign assemblies to be installed on the plans.
2) Show clamp-on mast arms details on the plans.
3) Show mounting brackets on he plans.
4) Show types of fluorescent lamps on plans when not using F36
T12 type lamps.
5) Use the
following Statewide Standard Details Sheets for the installation
details of reflectorized pavement markings:
SNS
|
Street Name
Sign Details (Illuminated)
|
MA-C(ILSN)
|
Mast Arm
Connection
|
PAYMENT
DESCRIPTION
|
UNITS
|
1)
" internally lighted street name sign assemblies (Type
Specified)"
|
EA
|
REFERENCE ITEMS
None
Go to Top
6042 - SOLAR-POWERED
NAVIGATIONAL AND AIRCRAFT OBSTRUCTION LIGHTING SYSTEM
SPECIFICATION
REQUIREMENTS
1) Show locations and number of navigational and aircraft
obstruction lighting systems to be installed on the plans.
2) Show orientation of navigational lighting systems on the plans.
3) Show conduit attachment on the plans.
4) Show solar-power assembly orientation on the plans.
PAYMENT
DESCRIPTION
|
UNITS
|
1)
"Solar-powered navigational LIGHTING system"
|
LS
|
2)
"solar-powered aircraft obstruction lighting system"
|
LS
|
REFERENCE ITEMS
(616)
Go to Top
6043 - MICROWAVE
presence vehicle detector
SPECIFICATION
REQUIREMENTS
1) Show locations, mounting positions, and number of microwave
presence detectors to be installed on the plans.
2) Show horizontal detection range on plans when not using 3 ft.
to 66 ft. at a mounting of 16 ft. high.
3) Show locations and types of cables to be installed on the plans.
PAYMENT
DESCRIPTION
|
UNITS
|
1)
"microwave vehicle detector (presence)"
|
EA
|
REFERENCE ITEMS
(6011)
Go to Top
6045 - reflectorized
pavement markings with retroreflective REQUIREMENTS
SPECIFICATION
REQUIREMENTS
1) Show the location and placement of reflectorized pavement
markings on the plans.
2) Show the type, color (white or yellow), shapes, sizes, widths
and thickness (Type I Markings only) of the reflectorized pavement
markings on the plans.
3) Show traffic control on the plans.
4) Show the guides to mark the lateral location of pavement
markings on the plans.
5) Show time
restrictions for retroreflectivity inspections on plans, when not
using those that apply to striping.
6) Where double stripes are placed, each stripe will be measured
separately.
7) This is a plans quantity measurement item.
8) Use the following Statewide Standard Details Sheets for the
installation details of reflectorized pavement markings:
PMs
|
Pavement
Markings
|
FPMs
|
Freeway
Pavement Markings
|
PAYMENT
DESCRIPTION
|
UNITS
|
1) "REFL
PAV MRK (Specify the Type, Color, Shape, Size and/or Width)
(Specify Thickness for Type I Markings only)"
|
LF, EA
|
2)
"PAVEMENT SEALER (Size Specified)"
|
LF, EA
|
REFERENCE ITEMS
(677), (678)
Go to Top
6055 - IN-LANE OR TRANSVERSE RUMBLE
STRIPS
SPECIFICATION
REQUIREMENTS
1) Show the locations of and placement of in-lane or transverse
rumble strips on the plans.
PAYMENT
DESCRIPTION
|
UNITS
|
1) "IN-LANE OR TRANSVERSE RUMBLE STRIPS"
|
LF
|
REFERENCE ITEMS
None
Go to Top
6086 - Preparation of Existing
Conduits, Ground Boxes, or Manholes
SPECIFICATION
REQUIREMENTS
1) Show the locations of conduits, ground boxes, and manholes to
be prepared on the plans.
2) When needed, show locations and types of ground boxes and
manholes to be installed on the plans.
3) When needed, show locations and types of ground box and
manhole covers to be adjusted on the plans.
4) Show the locations of junction boxes to be installed on the plans.
5) Show
the locations of cable rack assemblies to be installed on the plans.
6) New conduit will be paid for under Item 618,
Conduit.
PAYMENT
DESCRIPTION
|
UNITS
|
1)
"conduit (prepare)"
|
LF
|
2)
"junction box (install)"
|
EA
|
3)
"manhole (install)"
|
EA
|
4)
"manhole (prepare)"
|
EA
|
5)
"ground box
(install)"
|
EA
|
6)
"ground box (prepare)"
|
EA
|
7)
"cover (replace) (Type
Specified)"
|
EA
|
8)
"cover
(adjust)"
|
EA
|
9)
"cable rack ASSEMBLY
(install)"
|
EA
|
REFERENCE
ITEMS
(465), (618), (624), (Ground Box for SC&C), (Multi-Duct Conduit
System)
Go to Top
6110 - REFLECTORIZED PAVEMENT MARKINGS WITH
RETROREFLECTIVE REQUIREMENTS
SPECIFICATION
REQUIREMENTS
1) Show locations and placement of reflectorized pavement
markings on the plans.
2) Show the type, color (white or yellow), shapes, sizes, widths
and thickness (Type I Markings only) of the reflectorized pavement
markings on the plans.
3) Show traffic control on the plans.
4) Show the guides to mark the lateral location of pavement
markings on the plans.
5) Show time restrictions for retroreflectivity inspections on
plans, when not using those that apply to striping.
6) Where double stripes are placed, each stripe will be measured
separately.
7) This is a plans quantity measurement item.
8) Use the following Statewide Standard Details Sheets for the
installation details of reflectorized pavement markings:
PM's Pavement Markings
FPM's Freeway Pavement Markings
9) SP 6110--018 is required by Change Memo 16-08 which
required SS 8094, Mobile Retroflectivity Data Collection for
Pavement Markings, to be a referenced item.
PAYMENT
DESCRIPTION
|
UNITS
|
1) "REFL PAV MRK
W/RETRORFL REQUIRE (Specify
the Type, Color, Size and/or Width)"
|
LF, EA
|
2)
"Pavement sealer (specify the Size)"
|
LF, EA
|
REFERENCE ITEMS
(677), (678), (8094)
Go to Top
6119 - RELOCATE OR REMOVE PEDESTAL POLE
ASSEMBLIES
SPECIFICATION REQUIREMENTS
1) Show locations of pedestal pole assemblies to be relocated on
the plans.
2) Show locations of pedestal pole assemblies to be removed on
the plans.
PAYMENT DESCRIPTION
|
UNITS
|
1) "relocate
pedestal pole assemblies"
|
EA
|
2) "remove
pedestal pole assemblies"
|
EA
|
REFERENCE ITEMS
(445), (449), (656), (687)
Go to Top
6122 - RELOCATE HIGH MAST LIGHTING
SPECIFICATION REQUIREMENTS
1) Show the locations of high mast lighting to be relocated on
the plans.
PAYMENT DESCRIPTION
|
UNITS
|
1) "relocate
high mast lighting"
|
EA
|
REFERENCE ITEMS
(445), (449), (613), (614)
Go to Top
6152 RAISED PAVEMENT MARKERS (RPMS) WITH
WARRANTY
SPECIFICATION REQUIREMENTS
1) This warranty specification is only to be used on pure traffic
projects.
2) Include Special Provision 003---015, "Award and Execution of
Contract" in proposal for warranty bond information.
3) Show the location of RPMs to be installed on the plans.
4) The Department will provide written acceptance as of the last
calendar day of each month for RPMs installed that month and at the
final job acceptance for any remaining installed RPMs.
5) Provide a 60-day performance period that begins the day after
written acceptance.
6) The warrantor must provide a warranty bond on the form
provided and must be approved by the Department.
7) All RPMs failing to meet the specification requirements must
be replaced within 15 days after notification.
8) This is a plans quantity measurement item.
PAYMENT DESCRIPTION
|
UNITS
|
1) "RAISED
pAVEMENT MARKERS (rPMS) (type Specified)"
|
EA
|
REFERENCE ITEMS
(677)
Go to Top
6153 MULTIPOLYMER PAVEMENT MARKINGS (MPM)
WITH WARRANTY
SPECIFICATION REQUIREMENTS
1) This warranty specification is only to be used on pure traffic
projects.
2) Include Special Provision 003---015, "Award and Execution of
Contract" in proposal for warranty bond information.
3) Show the location and placement of the multipolymer pavement
markings on the plans.
4) Show the type, color (white or yellow) and the shape, width,
and sizes as applicable of the multipolymer pavement markings on the
plans.
5) Show traffic control on the plans.
6) Show the guides to mark the lateral location of pavement
markings on the plans.
7) An initial performance evaluation must be performed after 7
and before 15 days after MPM are installed to verify that the MPM meet
the performance requirements for retroreflectivity.
8) The Department will provide written acceptance after the
Contractor meets the initial performance requirements.
9) The warranty period is for 3 years and starts the day after
written acceptance.
10) Where double stripes are placed, each stripe will be measured
separately.
11) All MPMs failing to meet the specification requirements must be
replaced within 15 days after notification.
12) This is a plans quantity measurement item.
13) Use the following Statewide Standard Details Sheets for the
installation details of multipolymer pavement markings:
PM's Pavement Markings
FPM's Freeway Pavement Markings
14)
SP 6153--001 is required by Change Memo 05-07 which required SS 8094,
Mobile Retroflectivity Data Collection for Pavement Markings, to be
a referenced item.
PAYMENT DESCRIPTION
|
UNITS
|
1) "MULTIPOLYMER
PAVEMENT MARKINGS (mPM) WITH WARRANTY (Type Specified)
(Color Specified) (Specify Shape, Width and Size as
applicable)"
|
LF, EA
|
REFERENCE ITEMS
(677), (8094)
Go to Top
6195 MAINTENANCE OF ILLUMINATION SYSTEMS
SPECIFICATION REQUIREMENTS
1) Unless otherwise noted on the plans, the Department will
furnish roadway illumination assemblies; poles, transformer bases,
mast arms, and fixtures.
2) Show on the plans the locations and times for materials pick up.
PAYMENT DESCRIPTION
|
UNITS
|
1) "Foundations"
|
LF |
2) "ROADWAY ILLUMINATION ASSEMBLIES" |
EA |
3) "HIGH MAST ILLUMINATION ASSEMBLIES" |
EA |
4) "CONDUIT" |
LF |
5) "ELECTRICAL CONDUCTORS" |
LF |
6) "TRAY CABLE" |
LF |
7) "DUCT CABLE" |
LF |
8) "GROUND BOXES" |
EA |
9) "ELECTRICAL SERVICES" |
EA |
10) "BREAKAWAY BASE INSPECTION AND REPAIR" |
LS |
11) "MAINTAIN ILLUMINATION SYSTEMS" |
MO |
12) "EMERGENCY CALL" |
EA |
REFERENCE ITEMS
(416), (432), (447), (610), (614), (618), (620), (621), (622), (624),
(628)
Go to Top
6266 video
imaging vehicle detection system
SPECIFICATION
REQUIREMENTS
1) Show locations and number of VIVDS processors and cameras to
be installed on the plans.
2) Show if single or multi channel card rack are to be installed
on the plans.
3) Describe field communication link media on the plans.
4) Show
temporary use VIVDS on the plans.
5) Describe set-up system on the plans.
6) Describe
central control system on the plans.
7) Show central control communication rate on the plans.
8) This is a plans quantity measurement Item.
PAYMENT
DESCRIPTION
|
UNITS
|
1)
"vivds processor system"
|
EA
|
2)
"vivds camera assembly"
|
EA
|
3)
"vivds central control"
|
EA
|
4)
"vivds set-up system"
|
EA
|
5)
"vivds temporary"
|
EA
|
6)
"vivds communication CABLE (Coaxial)"
|
LF
|
7)
"vivds communication CABLE (Fiber
Optic)"
|
LF
|
8) "VIVDS VIDEO RECORDING" |
EA |
REFERENCE ITEMS
None
Go to Top
6473
MULTIPOLYMER PAVEMENT MARKINGS (MPM)
SPECIFICATION
REQUIREMENTS
1) Show locations for multipolymer pavement markings on the plans.
2) Contractor to use materials that produce an adherent,
retroreflective pavement making system that meets all of the
performance requirements.
3) This is a plans quantity measurement Item.
4)
SP 6473--001 is required by Change Memo 05-07 which required SS 8094,
Mobile Retroflectivity Data Collection for Pavement Markings, to be
a referenced item.
PAYMENT
DESCRIPTION
|
UNITS
|
1)
"Multipolymer pavement markings (mpm) (Type
specified) (Color specified)(Shape, Width, and Size specified as
applicable)"
|
LF |
REFERENCE ITEMS
(677), (8094)
Go to Top
6834 PORTABLE
CHANGEABLE MESSAGE SIGN
SPECIFICATION
REQUIREMENTS
1) Show locations of portable changeable message signs to be used
on the plans.
2) Show locations of portable changeable message signs to be
relocated on the plans.
3) Show number of portable changeable message signs needed, how
days required, and which construction phases to be used on the plans.
4) When required, show cellular telephone provisions on the plans.
PAYMENT
DESCRIPTION
|
UNITS
|
1)
" portable changeable message signs"
|
EA, DAY
|
REFERENCE ITEMS
None
Go to Top
6986 LONGITUDINAL PREFABRICATED PAVEMENT MARKINGS
(PPM) WITH WARRANTY
SPECIFICATION REQUIREMENTS
1) This warranty specification may be used on any striping or
roadway project.
2) Include Special Provision 003---015, "Award and Execution of
Contract" in proposal for warranty bond information.
3) Show the location and placement of the prefabricated pavement
markings on the plans.
4) Show the type, color (white or yellow) and the shape, width,
and sizes as applicable of the prefabricated pavement markings on the
plans.
5) Show traffic control on the plans.
6) Show the guides to mark the lateral location of pavement
markings on the plans.
7) An initial performance evaluation must be performed after
pavement markings are installed to verify that they meet the
performance requirements for color, retroreflectivity and durability.
8) The Department will provide written acceptance after the
Contractor meets the initial performance requirements.
9) The warranty period is for 6 years and starts the day after
written acceptance.
10) Where double stripes are placed, each stripe will be measured
separately.
11) All prefabricated pavement markings failing to meet the
specification requirements must be replaced within 30 days after
notification.
12) This is a plans quantity measurement item.
13) Use the following Statewide Standard Details Sheets for the
installation details of prefabricated pavement markings:
PM's Pavement Markings
FPM's Freeway Pavement Markings
14)
Requires SS 8094,
Mobile Retroflectivity Data Collection for Pavement Markings, to be
a referenced item.
PAYMENT DESCRIPTION
|
UNITS
|
1) "LONGITUDINAL PREFABRICATED
PAVEMENT MARKINGS (PPM) WITH WARRANTY (Specify Color, Shape,
and Width, specified as
applicable)"
|
LF, EA
|
REFERENCE ITEMS
(677), (8094)
Go to Top
Click here to return to Index Page
|