INTRODUCTION

The IH 30 Preliminary Engineering and Environmental Assessment project is intended to develop a locally preferred plan of action to address transportation problems along the east-west corridor of IH 30 between Oakland Blvd. and proposed SH 161 (near existing NW 19th Street) in Tarrant and Dallas Counties, Texas as outlined in the study area map. The study process follows federal procedures, which call for collaborative development of transportation projects with local communities and all involved agencies.

STUDY TEAM

Picture of IH 30 Tom Landry Highway sign The Fort Worth District Office of the Texas Department of Transportation (TxDOT) is managing the IH 30 Study. TxDOT hired Halff Associates in August 2005 to perform the study as the principal consultant for the design schematic and environmental assessment. In 2003, the City of Arlington hired the Joint Venture of Graham Associates and Schriekel-Rollins to develop the "3+ Bridges" project to improve IH 30 from Cooper St. to Ballpark Way in Arlington. The North Central Texas Council Of Governments (NCTCOG) serves as the study’s Metropolitan Planning Organization (MPO). See the IH30 Project Overview Slides for limits of these projects.

SCHEDULE

The draft design schematic and environmental assessment have been completed for the January 25, 2007 public hearing, as shown in the overall schedule updated in December 2006. The early implementation of the Center Street Bridge schematic and environmental documentation has been completed as shown on the detailed schedule.  Construction of the Center Street improvements began in June 2007.

RELATED STUDIES

A similar study is also being performed for SH 360 from IH 20 to north of IH 30, including the IH 30 interchange. The SH 360 includes the Design Schematic and Environmental Assessment for IH 30 between Ballpark Way and Great Southwest Parkway. This project is also being completed by the Fort Worth District office of TxDOT.  The public hearing for SH 360 was held on October 26, 2006.  More information on the SH 360 project can be found at the TxDOT web site, http://www.dot.state.tx.us/ftw/mis/sh360/project.htm.

FOR MORE INFORMATION

The IH 30 Project is being managed by the Fort Worth District Office of the Texas Department of Transportation; project manager is Mohammad Al Hweil, P.E. You may write to Mr. Al Hweil at TxDOT, P.O. Box 6868, Fort Worth, Texas 76115 or call (817) 370-6944, or fax (817) 370-6759. You may also e-mail Mohammad at mhweil@dot.state.tx.us

 