SP008-118  PDF  RTF  PROSECUTION AND PROGRESS - Requires Contractor to use a Critical Path Method (CPM) Project Schedule using the Precedence Diagram Method (PDM). Can be used in place of 008-117 (beginning with 10/97 letting). Replaces SP008-070 . Statewide Use.