Search Results
1993 | |||
Special Provisions | |||
SP105-005 | RTF | REMOVING STABILIZED BASE AND/OR ASPHALTIC PAVEMENT - Provides for this material, salvaged reclaimed asphaltic pavement (RAP), to be stockpiled by the Contractor or to be sold to the Contractor as a lump sum bid. Replaces SP105-004 . Districtwide Use. San Antonio District, Dallas District. | |
Search |
Specification Information |