Search Results
1993 | |||
Special Provisions | |||
SP360-029 | RTF | CONCRETE PAVEMENT - Provides for reductions of max. allowable water/cement ratio; requires use of evaporation retardants and allows for direct pavement depth measurements. All projects with Item 360, unless 360-028 is used. Replaces SP360-025 .Replaced by SP360-036 . Statewide Use. | |
Search |
Specification Information |