Search Results
1993 | |||
Special Provisions | |||
SP360-052 | RTF | CONCRETE PAVEMENT - Changes the requirements of the concrete mix design and 7-day job control strengths. (Required unless 360-053 is used, beginning with the July 2003 letting.) Replaces SP360-035 . Statewide Use. | |
Search |
Specification Information |