Search Results
2004 | |||
Special Provisions | |||
SP005-001 | RTF | Control of the Work - Submit shop drawings electronically for the fabrication of structural items as documented in the Guide to Electronic Shop Drawing Submittal. Required on all construction projects beginning with the October 2005 letting. Replaced by SP005-004 . Statewide Use. | |
Search |
Specification Information |