Search Results
2004 | |||
Special Provisions | |||
SP447-002 | RTF | Structural Bolting - Limits the time between installation of bolts and final tensioning to 10 days and revises the tolerances for turn-of-the-nut tightening to be in line with national bolt specifications. Required on all projects with Item 447 beginning with the January 2006 letting. Replaces SP447-001 . (Change Memo: de-42-05). Statewide Use. | |
Search |
Specification Information |