Search Results
2004 | |||
Special Provisions | |||
SP007-213 | RTF | Legal Relations and Responsibilities - Clarifies requirements for the Contractor to notify TxDOT of his schedule for demolition or renovation of each structure or load bearing member. Notification is required due to possible material containing asbestos. Required on all projects beginning with the June 2006 letting. Replaced by SP007-740 . (Change Memo: de-12-06). Statewide Use. | |
Search |
Specification Information |