SP506-008 | RTF | Temporary Erosion, Sedimentation, and Environmental Controls - VOID - DO NOT USE. The Inspector to perform SWP3 inspection every 14 calendar days and within 24 hours after a storm event of 0.5 in. or greater. Make corrections ASAP before the next rain event or within 7 calendar days after being able to enter the site. Required on all projects with Item 506 beginning with the June 2007 letting, unless SP 506-007 or SP 506-009 is used. Replaced by Special Specification 1122 beginning with the October 2012 letting. Replaced by SP506-012 . (Change Memo: de-06-07). Statewide Use. | |