Search Results


2014

Special Provisions
SP247-003  PDF  RTF  FLEXIBLE BASE - VOID - DO NOT USE. This special provision adds certification requirements when utilizing Contractor's test results for consideration of acceptance, use of SiteManager templates, obtaining samples, referee test requirements and ride quality requirement modifications. Required for all projects using Flexible Base beginning with the September 2018 letting. Replaced by SP247-005 . Statewide Use.

Search
Specification Information