Search Results
2014 | |||
Special Specifications | |||
SS5129 | RTF | Floating Turbidity Barrier - Furnish, install, maintain, and remove floating turbidity barrier (FTB) to minimize transport and accomplish the isolation of disturbed materials resulting from construction operations. Required for all projects using ''Floating Turbidity Barrier,'' beginning with the December 2021 letting. Replaces SS5048 . Statewide Use. | |
Search |
Specification Information |