Search Results
1993 | |||
Special Provisions | |||
SP005-027 | RTF | CONTROL OF THE WORK - Requires that working drawings for formwork, falsework, and erection plans be signed and sealed by a P. E. and submitted to the Engineer. All projects (beginning with 09/01 letting). Replaces SP005-002 SP005-004 . Statewide Use. | |
Search |
Specification Information |