2014 English Special Provisions by Item (All)
|
Specification Information
|
Search For a Special Provision or Specification
|
|
SP000-1582 |
PDF |
RTF |
IMPORTANT NOTICE TO CONTRACTORS - For project 1911-01-022 in Galveston County. Railroad agreement within the project limits have not been cleared
One-Time Use.
|
SP000-1581 |
PDF |
RTF |
IMPORTANT NOTICE TO CONTRACTORS - For project 0101-03-120 in Jim Wells County. The railroad agreement with Union Pacific Railroad has not been completed.
One-Time Use.
|
SP000-1580 |
PDF |
RTF |
IMPORTANT NOTICE TO CONTRACTORS - For project 2452-03-087 in Bexar County. Utilities within the project limits have not been cleared.
One-Time Use.
|
SP000-1579 |
PDF |
RTF |
IMPORTANT NOTICE TO CONTRACTORS - For project 0177-11-161 in Harris County. Right of way and utilities within the project limits have not been cleared
One-Time Use.
|
SP000-1578 |
PDF |
RTF |
IMPORTANT NOTICE TO CONTRACTORS - For project 0916-37-036 in Jim Wells County. The utility relocation with Jim Wells County Fresh Water Supply has not been completed.
One-Time Use.
|
SP000-1577 |
PDF |
RTF |
IMPORTANT NOTICE TO CONTRACTORS - For project 0919-30-061 in Titus County. Utilities within the project limits have not been cleared.
One-Time Use.
|
SP000-1576 |
PDF |
RTF |
IMPORTANT NOTICE TO CONTRACTORS - For project 0039-04-132 in Hidalgo County. Railroad locations within the project limits have not been cleared.
One-Time Use.
|
SP000-1575 |
PDF |
RTF |
IMPORTANT NOTICE TO CONTRACTORS - For project 0042-11-006 in Potter County. Utilities within the project limits have not been cleared.
One-Time Use.
|
SP000-1574 |
PDF |
RTF |
IMPORTANT NOTICE TO CONTRACTORS - For project 2121-06-052 in Hudspeth County. Right of way within the project limits have not been cleared.
One-Time Use.
|
SP000-1573 |
PDF |
RTF |
IMPORTANT NOTICE TO CONTRACTORS - For project 0038-06-047 in Starr County. Utilities within the project limits have not been cleared.
One-Time Use.
|
SP000-1572 |
PDF |
RTF |
IMPORTANT NOTICE TO CONTRACTORS - For project 0006-03-121 in Nolan County. Utilities within the project limits have not been cleared.
One-Time Use.
|
SP000-1571 |
PDF |
RTF |
IMPORTANT NOTICE TO CONTRACTORS - For project 0028-13-135 in Jefferson County. Notification of unclear utilities within project limits.
One-Time Use.
|
SP000-1570 |
PDF |
RTF |
IMPORTANT NOTICE TO CONTRACTORS - For project 1599-03-017 in Johnson County. utilities within the project limits have not been cleared
One-Time Use.
|
SP000-1569 |
PDF |
RTF |
IMPORTANT NOTICE TO CONTRACTORS - For project 0455-03-038 in Gray County. utilities within the project limits have not been cleared
One-Time Use.
|
SP000-1568 |
PDF |
RTF |
IMPORTANT NOTICE TO CONTRACTORS - For project 1986-01-064 in Montgomery County. Notification of unclear utilities within project limits.
One-Time Use.
|
SP000-1567 |
PDF |
RTF |
IMPORTANT NOTICE TO CONTRACTORS - For project 0906-00-235 in Ector County. Notification of known locations containing hazardous materials to be mitigated by the Contractor.
One-Time Use.
|
SP000-1566 |
PDF |
RTF |
IMPORTANT NOTICE TO CONTRACTORS - For project 3483-02-002 in Webb County. utilities and right of way within the project limits have not been cleared.
One-Time Use.
|
SP000-1565 |
PDF |
RTF |
IMPORTANT NOTICE TO CONTRACTORS - For project 1155-01-017 in Martin County. As of March 15, 2024, utilities within the project limits have not been cleared.
One-Time Use.
|
SP000-1564 |
PDF |
RTF |
IMPORTANT NOTICE TO CONTRACTORS - For project 0162-01-100 in McLennan County. Notification of unclear utilities within project limits.
One-Time Use.
|
SP000-1563 |
PDF |
RTF |
IMPORTANT NOTICE TO CONTRACTORS - For project 0047-03-100 in Grayson County. Notification of unclear utilities within project limits.
One-Time Use.
|
SP000-1562 |
PDF |
RTF |
IMPORTANT NOTICE TO CONTRACTORS - For project 0906-00-236 in Ector County. Notification of unclear utilities within project limits.
One-Time Use.
|
SP000-1561 |
PDF |
RTF |
IMPORTANT NOTICE TO CONTRACTORS - For project 0921-06-348 in Cameron County. Notification of unclear utilities and right of way encroachments within project limits.
One-Time Use.
|
SP000-1560 |
PDF |
RTF |
IMPORTANT NOTICE TO CONTRACTORS - For project 0624-01-003 in Uvalde County. Notification of unclear utilities within project limits.
One-Time Use.
|
SP000-1559 |
PDF |
RTF |
IMPORTANT NOTICE TO CONTRACTORS - For project 1308-01-025 in Bell County. Notification of unclear utilities within project limits.
One-Time Use.
|
SP000-1558 |
PDF |
RTF |
IMPORTANT NOTICE TO CONTRACTORS - For project 0337-05-043 in Milam County. right of way within the project limits has not been cleared
One-Time Use.
|
SP000-1556 |
PDF |
RTF |
IMPORTANT NOTICE TO CONTRACTORS - For project 0073-13-012 in Atascosa County. utilities within the project limits have not been cleared, department anticipates clearance by the dates listed.
One-Time Use.
|
SP000-1555 |
PDF |
RTF |
IMPORTANT NOTICE TO CONTRACTORS - For project 0271-01-083 in Colorado County. Notification of unclear utilities, right of way, and relocations within project limits.
One-Time Use.
|
SP000-1554 |
PDF |
RTF |
IMPORTANT NOTICE TO CONTRACTORS - For project 1728-02-065 in Comal County. Notification of unclear utilities within project limits.
One-Time Use.
|
SP000-1553 |
PDF |
RTF |
IMPORTANT NOTICE TO CONTRACTORS - For project 0913-09-115 in Colorado County. Notification of unclear right of way and utilities within project limits.
One-Time Use.
|
SP000-1552 |
PDF |
RTF |
IMPORTANT NOTICE TO CONTRACTORS - For project 0195-03-087 in Denton County. Known locations containing hazardous materials to be mitigated by third party and Contractor
One-Time Use.
|
SP000-1551 |
PDF |
RTF |
IMPORTANT NOTICE TO CONTRACTORS - For project 0179-04-104 in Matagorda County. Notification of unclear utilities within project limits.
One-Time Use.
|
SP000-1550 |
PDF |
RTF |
Important Notice to Contractors - For project 0911-04-094 in Polk County. Notification of unclear utilities within project limits.
One-Time Use.
|
SP000-1549 |
PDF |
RTF |
IMPORTANT NOTICE TO CONTRACTORS - For project 0197-02-137 in Dallas County. Notification of incomplete railroad agreement.
One-Time Use.
|
SP000-1548 |
PDF |
RTF |
IMPORTANT NOTICE TO CONTRACTORS - For project 0194-01-010 in Cooke County. Notification of unclear utilities within project limits.
One-Time Use.
|
SP000-1547 |
PDF |
RTF |
IMPORTANT NOTICE TO CONTRACTORS - For project 0912-72-559 in Harris County. Utilities within the project limits have not been cleared.
One-Time Use.
|
SP000-1546 |
PDF |
RTF |
IMPORTANT NOTICE TO CONTRACTORS - For project 0578-03-055 in Walker County. Notification of unclear utilities within project limits.
One-Time Use.
|
SP000-1545 |
PDF |
RTF |
IMPORTANT NOTICE TO CONTRACTORS - For project 0161-03-025 in Val Verde County. Temporary construction licenses within the project limits have not been cleared.
One-Time Use.
|
SP000-1544 |
PDF |
RTF |
IMPORTANT NOTICE TO CONTRACTORS - For project 0017-15-028 in Frio County. Notification of unclear utilities within project limits.
One-Time Use.
|
SP000-1543 |
PDF |
RTF |
IMPORTANT NOTICE TO CONTRACTORS - For project 0005-14-094 in Midland County. Utilities relocations within the project limits have not been cleared. The Department anticipates clearance by the dates listed below. Unless otherwise stated, clearance of these obstructions will be performed by their owners.
One-Time Use.
|
SP000-1542 |
PDF |
RTF |
IMPORTANT NOTICE TO CONTRACTORS - For project 0909-00-068 in Bell, Bosque, McLennan Counties. As of January 31, 2024, railroad coordination is complete, but an agreement has not been executed with the appropriate railroads.
One-Time Use.
|
SP000-1541 |
PDF |
RTF |
IMPORTANT NOTICE TO CONTRACTORS - For project 0195-03-087 in Denton County. Notification of unclear utilities within project limits.
One-Time Use.
|
SP000-1540 |
PDF |
RTF |
IMPORTANT NOTICE TO CONTRACTORS - For project 0617-01-177 in Nueces County. Notification of unclear utilities within project limits.
One-Time Use.
|
SP000-1539 |
PDF |
RTF |
IMPORTANT NOTICE TO CONTRACTORS - For project 3198-02-018 in San Jacinto County. Notification of unclear utilities within project limits.
One-Time Use.
|
SP000-1538 |
PDF |
RTF |
IMPORTANT NOTICE TO CONTRACTORS - For project 0008-03-133 in Tarrant County. Notification of unclear right of way and utilities within the project limits.
One-Time Use.
|
SP000-1537 |
PDF |
RTF |
IMPORTANT NOTICE TO CONTRACTORS - For project 0913-28-092 in Fayette County. Notification of unclear utilities within project limits.
One-Time Use.
|
SP000-1536 |
PDF |
RTF |
IMPORTANT NOTICE TO CONTRACTORS - For project 0043-08-088 in Wichita County. Notification of unclear utilities within project limits.
One-Time Use.
|
SP000-1535 |
PDF |
RTF |
IMPORTANT NOTICE TO CONTRACTORS - For project 0118-06-077 in Nacogdoches County. Notification of unclear railroads within project limits.
One-Time Use.
|
SP000-1534 |
PDF |
RTF |
IMPORTANT NOTICE TO CONTRACTORS - For project 1064-01-043 in Hidalgo County. Notification of unclear utilities within project limits.
One-Time Use.
|
SP000-1533 |
PDF |
RTF |
IMPORTANT NOTICE TO CONTRACTORS - For project 0001-04-099 in El Paso County. Notification of unclear right of way within project limits.
One-Time Use.
|
SP000-1532 |
PDF |
RTF |
IMPORTANT NOTICE TO CONTRACTORS - For project 0374-02-120 in El Paso County. Notification of unclear utilities within projects limits.
One-Time Use.
|
SP000-1531 |
PDF |
RTF |
IMPORTANT NOTICE TO CONTRACTORS - For project 0073-02-082 in Bexar County. Notification of unclear utilities within project limits.
One-Time Use.
|
SP000-1530 |
PDF |
RTF |
IMPORTANT NOTICE TO CONTRACTORS - For project 0168-07-043 in Deaf Smith County. Notification of unclear utilities within project limits.
One-Time Use.
|
SP000-1529 |
PDF |
RTF |
IMPORTANT NOTICE TO CONTRACTORS - For project 0044-04-048 in Montague County. Notification of the unclear railroad agreements with Union Pacific Railroad.
One-Time Use.
|
SP000-1528 |
PDF |
RTF |
IMPORTANT NOTICE TO CONTRACTORS - For project 0320-06-008 in Bell County. Notification of unclear utilities within project limits.
One-Time Use.
|
SP000-1527 |
PDF |
RTF |
IMPORTANT NOTICE TO CONTRACTORS - For project 0373-02-096 in Nueces County. The railroad agreements with Union Pacific Railroad and Canadian Pacific Kansas City Railroad have not been completed
One-Time Use.
|
SP000-1526 |
PDF |
RTF |
IMPORTANT NOTICE TO CONTRACTORS - For project 0974-03-014 in Taylor County. Notification of unclear utilities within the project limits.
One-Time Use.
|
SP000-1525 |
PDF |
RTF |
IMPORTANT NOTICE TO CONTRACTORS - For project 0027-12-160 in Fort Bend County. Notification of unclear utilities within project limits.
One-Time Use.
|
SP000-1524 |
PDF |
RTF |
IMPORTANT NOTICE TO CONTRACTORS - For project 0507-01-021 in San Patricio County. Utilities within the project limits have not been cleared and railroad agreements have not been completed.
One-Time Use.
|
SP000-1523 |
PDF |
RTF |
IMPORTANT NOTICE TO CONTRACTORS - For project 0014-10-071 in McLennan County. Notification of the known locations containing hazardous materials to be mitigated by the Contractor.
One-Time Use.
|
SP000-1522 |
PDF |
RTF |
IMPORTANT NOTICE TO CONTRACTORS - For project 0913-26-064 in Austin County. Notification of unclear utilities within project limits.
One-Time Use.
|
SP000-1521 |
PDF |
RTF |
IMPORTANT NOTICE TO CONTRACTORS - For project 0442-03-042 in Dallas, Ellis Counties. Notification of unclear utilities within project limits.
One-Time Use.
|
SP000-1520 |
PDF |
RTF |
IMPORTANT NOTICE TO CONTRACTORS - For project 0168-09-083 in Randall County. Notification of unclear utilities and ROW within project limits.
One-Time Use.
|
SP000-1519 |
PDF |
RTF |
IMPORTANT NOTICE TO CONTRACTORS - For project 2374-03-099 in Dallas County. Notification that the operator of the railroad has not completed the railroad agreement.
One-Time Use.
|
SP000-1518 |
PDF |
RTF |
IMPORTANT NOTICE TO CONTRACTORS - For project 0917-12-090 in Milam County. Notification that railroad coordination is in progress but agreements have not been executed with the appropriate railroads.
One-Time Use.
|
SP000-1517 |
PDF |
RTF |
IMPORTANT NOTICE TO CONTRACTORS - For project 0090-05-107 in Potter County. Notification of unclear utilities within project limits.
One-Time Use.
|
SP000-1516 |
PDF |
RTF |
IMPORTANT NOTICE TO CONTRACTORS - For project 0213-01-048 in Waller County. Notification of unclear utilities within project limits.
One-Time Use.
|
SP000-1515 |
PDF |
RTF |
IMPORTANT NOTICE TO CONTRACTORS - For project 0911-00-096 in Angelina County. Notification of unclear railroads within project limits.
One-Time Use.
|
SP000-1514 |
PDF |
RTF |
IMPORTANT NOTICE TO CONTRACTORS - For project 0720-01-045 in Grimes County. Notification of unclear utilities within project limits.
One-Time Use.
|
SP000-1513 |
PDF |
RTF |
IMPORTANT NOTICE TO CONTRACTORS - For project 0540-02-027 in Robertson County. Notification of unclear utilities within project limits.
One-Time Use.
|
SP000-1512 |
PDF |
RTF |
Important Notice to Contractors - For project 1727-02-024 in Moore County. Notification of unclear utilities within project limits.
One-Time Use.
|
SP000-1511 |
PDF |
RTF |
IMPORTANT NOTICE TO CONTRACTORS - For project 0090-05-108 in Potter County. Notification of unclear utilities within project limits.
One-Time Use.
|
SP000-1510 |
PDF |
RTF |
IMPORTANT NOTICE TO CONTRACTORS - For project 3212-05-013 in Comal County. Notification of unclear utilities within project limits.
One-Time Use.
|
SP000-1509 |
PDF |
RTF |
IMPORTANT NOTICE TO CONTRACTORS - For project 0914-05-237 in Williamson County. Notification that the operator of the railroad has not completed the railroad agreement.
One-Time Use.
|
SP000-1508 |
PDF |
RTF |
IMPORTANT NOTICE TO CONTRACTORS - For project 0049-07-069 in Robertson County. Notification of unclear utilities within project limits.
One-Time Use.
|
SP000-1507 |
PDF |
RTF |
IMPORTANT NOTICE TO CONTRACTORS - For project 0327-05-041 in Kenedy County. The Contractor's attention is directed that there are experience requirements associated with the Intelligent Transportation Sys. (ITS) items contained on this project.
One-Time Use.
|
SP000-1506 |
PDF |
RTF |
IMPORTANT NOTICE TO CONTRACTORS - For project 0168-09-083 in Randall County. Notification of unclear right of way and utilities within project limits.
One-Time Use.
|
SP000-1505 |
PDF |
RTF |
IMPORTANT NOTICE TO CONTRACTORS - For project 0913-17-046 in Lavaca County. Notification of unclear utilities within project limits.
One-Time Use.
|
SP000-1504 |
PDF |
RTF |
IMPORTANT NOTICE TO CONTRACTORS - For project 0976-03-109 in Galveston County. Notification of unclear utilities and relocations within project limits.
One-Time Use.
|
SP000-1503 |
PDF |
RTF |
IMPORTANT NOTICE TO CONTRACTORS - For project 0211-06-059 in Fayette County. Notification of unclear utilities within project limits.
One-Time Use.
|
SP000-1502 |
PDF |
RTF |
IMPORTANT NOTICE TO CONTRACTORS - For project 0380-09-102 in Midland County. Notification of unclear utilities within project limits.
One-Time Use.
|
SP000-1501 |
PDF |
RTF |
IMPORTANT NOTICE TO CONTRACTORS - For project 0327-05-041 in Kenedy County. Notification of unclear utilities within project limits.
One-Time Use.
|
SP000-1500 |
PDF |
RTF |
IMPORTANT NOTICE TO CONTRACTORS - For project 0327-05-041 in Kenedy County. Notification that railroad coordination is complete, but an agreement has not been executed with the appropriate railroads.
One-Time Use.
|
SP000-1499 |
PDF |
RTF |
IMPORTANT NOTICE TO CONTRACTORS - For project 0092-14-103 in Dallas County. Notification that the operator of the railroad has not completed the railroad agreement.
One-Time Use.
|
SP000-1498 |
PDF |
RTF |
IMPORTANT NOTICE TO CONTRACTORS - For project 0383-03-024 in Jim Wells County. Notification of unclear utilities within project limits.
One-Time Use.
|
SP000-1497 |
PDF |
RTF |
IMPORTANT NOTICE TO CONTRACTORS - For project 1502-01-031 in Lubbock County. Notification of unclear utilities within project limits.
One-Time Use.
|
SP000-1496 |
PDF |
RTF |
IMPORTANT NOTICE TO CONTRACTORS - For project 0089-07-154 in Wharton County. Notification of unclear utilities within project limits.
One-Time Use.
|
SP000-1495 |
PDF |
RTF |
IMPORTANT NOTICE TO CONTRACTORS - For project 0063-07-003 in Shelby County. Notification of unclear railroad within project limits.
One-Time Use.
|
SP000-1494 |
PDF |
RTF |
IMPORTANT NOTICE TO CONTRACTORS - For project 0005-13-064 in Ector County. Notification of unclear utilities within project limits.
One-Time Use.
|
SP000-1493 |
PDF |
RTF |
IMPORTANT NOTICE TO CONTRACTORS - For project 0264-04-054 in Coke County. Notification of unclear utilities within project limits.
One-Time Use.
|
SP000-1492 |
PDF |
RTF |
IMPORTANT NOTICE TO CONTRACTORS - For project 2224-01-119 in Ector County. Notification of unclear utilities within project limits.
One-Time Use.
|
SP000-1491 |
PDF |
RTF |
IMPORTANT NOTICE TO CONTRACTORS - For project 2452-02-130 in Bexar County. Notification of unclear utilities and encroachments within project limits.
One-Time Use.
|
SP000-1490 |
PDF |
RTF |
IMPORTANT NOTICE TO CONTRACTORS - For project 0912-73-215 in Galveston County. Notification of unclear utilities within project limits.
One-Time Use.
|
SP000-1489 |
PDF |
RTF |
IMPORTANT NOTICE TO CONTRACTORS - For project 0915-00-252 in Bexar County. Notification of unclear utilities within project limits.
One-Time Use.
|
SP000-1488 |
PDF |
RTF |
IMPORTANT NOTICE TO CONTRACTORS - For project 0373-02-097 in Nueces County. Notice of the railroad agreement with Kansas City Southern Railroad has not been completed.
One-Time Use.
|
SP000-1487 |
PDF |
RTF |
IMPORTANT NOTICE TO CONTRACTORS - For project 2452-02-130 in Bexar County. Notification of unclear utilities within project limits.
One-Time Use.
|
SP000-1486 |
PDF |
RTF |
IMPORTANT NOTICE TO CONTRACTORS - For project 0027-07-046 in Fort Bend County. Notification of railroad agreement that has not been executed.
One-Time Use.
|
SP000-1485 |
PDF |
RTF |
Important Notice to Contractors - For project 1027-01-023 in Eastland County. Notification of unclear utilities within project limits.
One-Time Use.
|
SP000-1484 |
PDF |
RTF |
IMPORTANT NOTICE TO CONTRACTORS - For project 0200-08-049 in Tyler County. Notification of unclear utilities and right of way within project limits.
One-Time Use.
|
SP000-1482 |
PDF |
RTF |
IMPORTANT NOTICE TO CONTRACTORS - For project 0091-04-069 in Collin County. Notification of unclear utilities within project limits.
One-Time Use.
|
SP000-1481 |
PDF |
RTF |
IMPORTANT NOTICE TO CONTRACTORS - For project 0455-02-031 in Carson County. Notification of unclear utilities within project limits.
One-Time Use.
|