2014 English Special Specifications to Items 7000 - 7999 Maintenance (All)


2014 English Special Specifications by Item (All)
Specification Information
Search For a Special Provision or Specification

SS7357  PDF  RTF  Public Art and Lighting - For project 0363-03-056 in Tarrant County. Furnish materials and fabricate and erect gateway sign, including complete assemblage of each associated steel letter. One-Time Use.
SS7356  PDF  RTF  Water Line Construction and Adjustments - For project 0046-03-038 in Bowie County. Furnish labor, materials, and equipment necessary to provide complete water line construction and adjustments in conformance with the standards, plans, and Specifications. One-Time Use.
SS7355  PDF  RTF  Canopy Structure - For project 0367-06-065 in Galveston County. Furnish labor, materials, and equipment to install steel canopy structures. The canopy structure must consist of a metal roof supported by steel tube beam-column frames. One-Time Use.
SS7354  PDF  RTF  Water Mains - For project 0255-07-140 in Hidalgo County. Furnish labor, materials, and equipment necessary to provide a complete water main system in accordance with the plans and Specifications, and in accordance with the Department's Utility Accommodations Policy. One-Time Use.
SS7353  PDF  RTF  I-30 WATER AND SANITARY SEWER RELOCATIONS (FORT WORTH) - For project 1068-01-214 in Tarrant County. Furnish materials, labor, and equipment to install water system and sanitary sewer system in conformance with City of Fort Worth requirements and the plans. Obtain permits, provide testing, and request inspection of completed water lines. One-Time Use.
SS7352  PDF  RTF  Natural Gas Pipeline - For project 0271-01-083 in Colorado County. Furnish labor, materials, and equipment necessary to provide a complete natural gas main system in conformance with the plans and specifications, and in compliance with the Department's Utility Accommodations Policy. One-Time Use.
SS7351  PDF  RTF  Water Mains - For project 1064-01-043 in Hidalgo County. Furnish labor and equipment necessary for encasing existing lines with split-steel encasement pipes using the open-cut method in conformance with the plans and Specifications. One-Time Use.
SS7350  PDF  RTF  Water and Wastewater Main Relocations and Routine Appurtenance Adjustments - For project 0902-90-199 in Tarrant County. Furnish and install all materials, equipment, and labor needed for adjusting or relocating water meter box, or both adjusting and relocating. One-Time Use.
SS7349  PDF  RTF  Sanitary Sewer Cleanout Adjustment - For project 0902-90-199 in Tarrant County. Furnish all labor, equipment, and materials for the adjustment of sanitary sewer cleanouts as shown on the plans and replacement with preapproved traffic-rated cleanouts. One-Time Use.
SS7348  PDF  RTF  Water Valve Adjustments - For project 0902-90-199 in Tarrant County. Furnish all labor, equipment, and materials for the construction of water line valve covers, stems, bases, and valve sticks that are of preapproved traffic-rated material as shown on the plans. One-Time Use.
SS7347  PDF  RTF  Water Mains and Service Lines - For project 0142-04-052 in Kerr County. Provide and install a complete water main system as shown on the plans and in accordance with the Specifications and the Department's Utility Accommodation Policy (UAP) (43 TAC 21.31-21.55). The water mains must be as shown on the plans. One-Time Use.
SS7346  PDF  RTF  Bypass Pumping - For project 0015-13-428, 0015-13-433 in Travis County. Bypass pumping operations to temporarily reroute sewer flows to prevent a sanitary sewage overflow (SSO) and to always provide adequate and reliable sewer flow during construction. One-Time Use.
SS7345  PDF  RTF  Public Boat Ramp - For project 2523-02-074 in Brazoria County. Furnish materials, equipment, and labor necessary to remove the existing public boat ramp, infill the existing boat ramp basin, and construct a dual-launch public boat ramp and dual-berthing slip at FM 2004 at Chocolate Bayou. One-Time Use.
SS7344  PDF  RTF  Waterline Replacement - For project 0617-01-177 in Nueces County. Provide and install a complete water main system in accordance with the plans and Specifications and in accordance with the Department's Utility Accommodation Policy. One-Time Use.
SS7343  PDF  RTF  Automated Barrier Gate Repair - For project 6431-72-001 in Dallas County. This item governs the repair and replacement of automated barrier gates due to third-party damages in the Dallas District. One-Time Use.
SS7342  PDF  RTF  Facility and Buildings at Presidio Rail Crossing - For project 7124-01-006 in Presidio County. Construct the ''Facility and Buildings at Presidio Rail Crossing,'' in Presidio, Texas, as shown on the plans and the attached Specifications. One-Time Use.
SS7341  PDF  RTF  Valve and Pipe - For project 2452-02-130, 2452-03-087 in Bexar County. Provide and install a complete water main system. The water mains must include all pipe, all joints and connections to new and existing pipes, all valves, fittings, fire hydrants, pipe joint restraint systems, blocking, and other items. One-Time Use.
SS7340  PDF  RTF  Water and Wastewater Main Relocations - For project 0196-03-263 in Dallas County. Furnish and install all materials, equipment, and labor listed in this Specification in conformance with the City of Dallas requirements and details as shown on the plans. One-Time Use.
SS7339  PDF  RTF  Water Mains, Sewer Lines and Appurtenances Replacements - For project 0342-03-037 in Cameron County. Furnish and install or replace water pipe, water valves, water meters and boxes, water connections, fire hydrant assemblies, pipe fittings, encasement pipes, sewer pipe, manholes and supporting materials as shown the plans. One-Time Use.
SS7338  PDF  RTF  Water Mains and Service Lines - For project 0342-03-037 in Cameron County. Provide and install a complete water main system as shown on the plans and Specifications and in accordance with the Department's Utility Accommodation Policy. One-Time Use.
SS7337  PDF  RTF  Water Mains and Service Lines - For project 0342-03-037 in Cameron County. Provide and install a complete water main system as shown on the plans; in conformance with the local utility owner's policies, if any; and in accordance with Specifications and the Department's Utility Accommodation Policy (43 TAC 21.31-21.55). One-Time Use.
SS7336  PDF  RTF  Water and Sanitary Sewer Systems - For project 0342-03-037 in Cameron County. This Item will govern for furnishing new materials and installing water and sanitary sewer systems shown on the plans. One-Time Use.
SS7335  PDF  RTF  Sanitary Sewer - For project 0342-03-037 in Cameron County. Provide and install complete sanitary sewer construction and adjustments in conformity with the details shown on the plans, as described in this specification, in compliance with the Department's Utility Accommodation Policy or as directed. One-Time Use.
SS7334  PDF  RTF  Water and Sanitary Sewer - For project 0342-03-037 in Cameron County. Furnish, install, or replace water and sanitary sewer pipes, valves, meters and boxes, service connections, fire hydrant assemblies, pipefittings, encasement pipes manholes, and supporting materials. One-Time Use.
SS7333  PDF  RTF  Natural Gas Utilities - For project 0200-08-049 in Tyler County. This document will control the scope relating to gas utilities, which must be relocated to allow for the construction of US 69 in Hardin and Tyler County. This project includes various elements that conflict with the current locations of gas lines. One-Time Use.
SS7332  PDF  RTF  Water Line Construction and Adjustments - For project 0919-19-087 in Bowie County. Furnish labor, materials, and equipment necessary to provide complete water line construction and adjustments in conformance with the standards, as shown on the plans, and in accordance with Specifications. One-Time Use.
SS7331  PDF  RTF  Bus Stop Pads - For project 0912-72-662 in Harris County. Construct hydraulic cement concrete bus stop pads. One-Time Use.
SS7330  PDF  RTF  Water Mains and Service Lines - For project 0465-02-027 in Bexar County. Provide and install a complete water main system. The water mains must include all pipe, joints and connections to new and existing pipes, valves, fittings, fire hydrants, pipe joint restraint systems, blocking, and other items. One-Time Use.
SS7329  PDF  RTF  MAINTENANCE SPEED LIMIT SIGNING - For project 0909-00-065, 6431-18-001, 6440-57-001, 6440-59-001, 6444-10-001, 6444-12-001, 6444-56-001, 6445-96-001, 6447-47-001, 6447-48-001, 6447-50-001 in Angelina, Bell, Bosque, Coryell, Falls, Gregg, Hamilton, Hill, Houston, Limestone, McLennan, Milam, Nacogdoches, Polk, Rusk, Shelby, Smith, Van Zandt, Walker Counties. Furnish, install, maintain, and remove all Maintenance Speed Limit Signing and materials. Cover existing speed limit signs as shown on plans and as directed. One-Time Use.
SS7328  PDF  RTF  Waterline Adjustment by Pipe Jacking and Boring - For project 0047-18-089 in Grayson County. Install 12 inch waterline by other than open cut as shown on the plans. One-Time Use.
SS7327  PDF  RTF  Safety Rest Area - For project 6427-43-001 in Chambers County. Furnish all materials, equipment, and labor allowances necessary for the repair and upgrade of the Safety Rest Area buildings, picnic arbors, benches, walkways, site furnishings and water. One-Time Use.
SS7326  PDF  RTF  Sanitary Sewers - For project 0465-02-027 in Bexar County. Provide and install complete sanitary sewer construction and adjustments in conformity with the details shown on the plans or as directed, as described herein, in compliance with the Department's Utility Accommodation Policy. One-Time Use.
SS7325  PDF  RTF  Water Mains and Service Lines - For project 0535-01-074 in Guadalupe County. Provide and install a complete water main system in conformance with the plans and Specifications and in accordance with the Department's Utility Accommodation Policy (UAP) (43 TAC 21.31-[s]21.55). One-Time Use.
SS7324  PDF  RTF  Sanitary Sewer - For project 0535-01-074 in Guadalupe County. Provide and install complete sanitary sewer construction and adjustments in conformance with the details shown on the plans, as described in this Specification. One-Time Use.
SS7323  PDF  RTF  Hydraulic Power Systems (HPU’s) - For project 2263-02-106 in Nueces County. Construct one new Hydraulic Power Unit System located as shown on the plans as part of the improvements to Port Aransas Ferry. One-Time Use.
SS7322  PDF  RTF  FERRY ELECTRICAL SYSTEM REHABILITATION - For project 2263-02-106 in Nueces County. Complete a rehabilitation of the electrical system at the Port Aransas Ferry Facility. This project requires the installation of a new electrical service to the overall facility. One-Time Use.
SS7321  PDF  RTF  ABOVE GROUND FUEL STORAGE TANK (AST) - For project 2263-02-106 in Nueces County. This document will control the scope relating to installation of a new diesel fuel tank and distribution system at the Port Aransas Ferry. One-Time Use.
SS7320  PDF  RTF  Water Main Replacements - For project 0902-90-019 in Tarrant County. Furnish, install, or replace water pipe, water valves, water meters and boxes, water service connections, fire hydrant assemblies, pipe fittings, encasement pipes for water lines, and supporting materials. One-Time Use.
SS7319  PDF  RTF  Galvanized Iron Pipe - For project 2263-02-106 in Nueces County. Fabricate, furnish, and install galvanized iron pipe (GIP). One-Time Use.
SS7318  PDF  RTF  Insertion Valves - For project 3510-04-055 in Fort Bend County. Furnish labor, materials, and equipment necessary to provide installation of an insert valve in conformance with the plans and Specifications, and in compliance with the Department's Utility Accommodations Policy (43 TAC § 21.31-21.55). One-Time Use. Special Provisions exist.
SS7317  PDF  RTF  Dredging - For project 2263-02-106 in Nueces County. Dredge and dispose of dredged material. One-Time Use.
SS7316  PDF  RTF  Water Main Relocation  - For project 1392-01-044 in Collin County. Furnish, install, or replace water pipe, water valves, pipe fittings, encasement pipes for water lines, and supporting materials in conformance with the NTMWD and NCTCOG, and as shown on the plans. One-Time Use.
SS7315  PDF  RTF  Water and Sanitary Sewer Utilities - For project 0086-14-075 in Webb County. This Item governs for the furnishing of all equipment, labor, and materials to relocate and provide complete underground water and wastewater systems, as well as adjustment or replacement of the appurtenances or incidental Items. One-Time Use.
SS7314  PDF  RTF  Water Line Replacements - For project 2056-01-042 in Collin County. Furnish, install, and remove water pipe, water valves, pipe fittings, steel encasement pipes for water lines, and supporting materials as shown on the plans and details. One-Time Use.
SS7313  PDF  RTF  Water Line and Sanitary Sewer Installation - For project 0159-07-007 in Tom Green County. Furnish labor, materials, and equipment necessary to provide complete water line and sanitary sewer construction and adjustments in conformance with the standards, plans, and Specifications. One-Time Use.
SS7312  PDF  RTF  Automated Barrier Gate - For project 0196-02-128 in Denton County. Remove and relocate existing automated barrier gate assemblies on new concrete traffic barrier as shown on the plans or as directed. One-Time Use.
SS7311  PDF  RTF  Water Line Installation - For project 0257-04-031 in Eastland County. Water mains, including valves, valve boxes, service meters, hydrants, blocking, fittings, and other appurtenances for potable water distribution systems. Steel and iron materials must be in accordance with 23 CFR 635.410 provisions of Buy America. One-Time Use.
SS7310  PDF  RTF  Sanitary Sewer - For project 0257-04-031 in Eastland County. This Item governs materials and work for installation of sanitary sewer mains, fittings, connections, service lines, and other appurtenances for system constructed within existing right of way. One-Time Use.
SS7309  PDF  RTF  Bridge Structure Cleaning - For project 0092-14-086, 0151-09-150, 0168-08-075, 0275-04-061, 0455-01-048, 0904-00-208, 0908-00-131, 6432-68-001 in Callahan, Carson, Dallas, Hutchinson, Jefferson, Nolan, Potter, Randall, Taylor, Travis Counties. Remove all extraneous material from bridge bents, girders, and deck soffits, and wash bridge elements. One-Time Use. Special Provisions exist.
SS7308  PDF  RTF  Storm Water Pump Station - For project 0389-06-088 in Galveston County. Construct one new storm water pump station located as shown on the plans as part of the improvements to State Highway 146. The pump station will drain System B. One-Time Use.
SS7307  PDF  RTF  Snow and Ice Control - For project 6404-39-001 in Galveston, Harris Counties. Treat bridges and designated locations with de-icing material. One-Time Use.
SS7306  PDF  RTF  Bridge Substructure Debris Cleaning - For project 0004-07-139, 0015-09-206, 0043-06-098, 0120-01-022, 0265-14-012, 0266-02-070, 0906-00-282, 0909-00-065, 2121-02-182 in Bell, Colorado, Coryell, Ector, El Paso, Hamilton, McLennan, Wilbarger, Williamson Counties. Remove all debris from abutment caps and bent caps. One-Time Use.
SS7305  PDF  RTF  Water Line Construction and Adjustments - For project 0675-01-069 in Freestone County. Furnish labor, materials, and equipment necessary to provide complete water line construction and adjustments in conformance with the standards, plans, and Specifications. One-Time Use.
SS7304  PDF  RTF  Landscape Paver Installation - For project 0363-03-056 in Tarrant County. This Item will govern for the installation of owner provided landscape pavers, inclusive of reinforced concrete subbase, and galvanized steel angle edge restraint, in conformance with the details shown on the plans and in this Specification. One-Time Use.
SS7303  PDF  RTF  Installation of Water Lines and Fire Hydrants - For project 0902-90-034 in Tarrant County. Furnish, install, or replace water pipe, water valves, fire hydrant assemblies, pipe fittings, PVC encasement under pavement, connection to existing water lines, boring, directional drilling (HDD), and supporting materials. One-Time Use.
SS7302  PDF  RTF  Butterfly Valve Vault and Blow-Off Valve Modifications - For project 0081-03-047 in Denton County. Remove existing concrete butterfly valve vault top slab and install RCP riser pipe and concrete top slab as shown on plans. One-Time Use.
SS7301  PDF  RTF  Steel Split Casing - For project 0081-03-047 in Denton County. Install 66-in. steel split casing pipe as shown on plans. One-Time Use.
SS7300  PDF  RTF  Water Main Relocation - For project 0073-02-082, 1392-01-044 in Bexar, Collin Counties. Furnish, install, or replace water pipe, water valves, water meters and boxes, water service connections, fire hydrant assemblies, pipe fittings, encasement pipes for water lines, adjust wastewater manhole and supporting materials. One-Time Use.
SS7299  PDF  RTF  Water Line Split Steel Casings - For project 0215-01-044 in Comal County. Provide and install split steel casings in accordance with the plans and Specifications and in compliance with the Department's Utility Accommodation Policy. One-Time Use.
SS7298  PDF  RTF  Performance Based Operations and Maintenance of Managed Lanes - For project 6399-97-001 in Dallas County. This SS is similar to SS7161 for two new managed lanes that will govern the complete daily operation for Southern Gateway (US 67 and IH 35 E) Managed Lanes in the Dallas area. One-Time Use.
SS7297  PDF  RTF  Water Mains and Sanitary Sewers - For project 0015-10-062 in Travis County. This Item will govern for all materials, equipment, and labor necessary for the installation of all exterior water mains, all sanitary sewer lines, drain lines, and all distribution lines connected to the various structures as shown on the plans. One-Time Use.
SS7296  PDF  RTF  Water and Wastewater Utility Relocation - For project 0073-07-068 in Live Oak County. Furnish all materials, equipment, and labor allowances necessary for the relocation of the water and wastewater utilities at the safety rest area. One-Time Use.
SS7295  PDF  RTF  Sanitary Sewer Lift Station - For project 0028-01-067, 0188-04-035 in Brazoria, Harris Counties. Furnish labor, materials, and equipment necessary to provide a submersible sanitary sewer lift station. One-Time Use.
SS7294  PDF  RTF  Water Main Relocation  - For project 0069-07-111, 0619-03-061 in Collin, Tom Green Counties. Furnish, install, or replace water pipe, water valves, water meters and boxes, water service connections, fire hydrant assemblies, pipe fittings, encasement pipes for water lines, and supporting materials. One-Time Use.
SS7293  PDF  RTF  Bitter Creek WSC Water Supply Water Utilities - For project 0006-02-114 in Nolan County. This Item will govern the installation of water facilities belonging to the Bitter Creek WSC Water Supply. One-Time Use.
SS7292  PDF  RTF  City of Roscoe - Sanitary Sewer - For project 0006-02-114 in Nolan County. Furnish labor, materials, and equipment necessary to provide a complete sanitary sewer system in accordance and compliance with ANSI, AWWA, ASTM, ASA, SSPC, ACI, and NSF standards. One-Time Use.
SS7291  PDF  RTF  Batch Water Quality Pond System Maintenance - For project 6395-40-001 in Bexar County. Furnish maintenance services on Batch Water Quality Pond Systems and associated appurtenances which function as a storm water treatment system as shown on the plans. One-Time Use.
SS7290  PDF  RTF  Hazardous Material Trap Maintenance - For project 6395-40-001 in Bexar County. Furnish maintenance services on Hazardous Material Traps and associated appurtenances as shown on the plans. One-Time Use.
SS7289  PDF  RTF  Routine Electrical Maintenance - For project 6392-55-001 in Cameron County. Supplements work shown on Sheets 34 through 38 of the plans. In addition to the plans, this specification includes details regarding general requirements, limits of maintenance, submittals, measurement, and payment. One-Time Use.
SS7288  PDF  RTF  Routine Maintenance of Lift Span Machinery - For project 6392-55-001 in Cameron County. Specification supplement to the work shown on Sheets 27 through 33 of the plans and includes details regarding general requirements, limits of maintenance, submittals, measurement, and payment. One-Time Use.
SS7287  PDF  RTF  Temporary Line Stop Type Valve - For project 0905-06-118 in Lubbock County. Furnish and install Temporary Line Stop Valves of the size and type specified. One-Time Use.
SS7286  PDF  RTF  Water Utilities - For project 0905-06-118 in Lubbock County. Furnish and install water pipe, pipe fittings, thrust block, supporting materials, and demolition of existing water line for the lowering of existing municipal water line. One-Time Use.
SS7285  PDF  RTF  Cleaning Lift Span Superstructure and Substructure - For project 6392-55-001 in Cameron County. Clean lift span superstructure and substructure (Bridge Seats); Clean lift span fender system; and clean and paint structural steel as directed by the Engineer. One-Time Use.
SS7284  PDF  RTF  Acceptance Testing for Sanitary Sewers - For project 0739-02-140 in Jefferson County. This Specification will govern for the testing and sterilization of completed sanitary sewers. One-Time Use.
SS7283  PDF  RTF  Overhead and Underground Electric Distribution - For project 0015-10-062, 0015-13-077, 0015-13-423, 0015-13-428, 0015-13-433, 0113-13-168, 0914-04-334, 0914-04-335, 0914-04-336, 0914-04-362 in Travis, Williamson Counties. Austin Energy requirements pursuant to the specifications and standards for the construction of overhead and underground electric distribution, utilization lines and associated equipment, and construction assembly units. One-Time Use. Special Provisions exist.
SS7282  PDF  RTF  Gate Valves - For project 0739-02-140 in Jefferson County. This Specification will govern the furnishing and installation of gate valves and supporting materials in accordance with these specifications and the details shown on the plans. One-Time Use.
SS7281  PDF  RTF  Manholes (Sanitary Sewer) - For project 0739-02-140 in Jefferson County. This Specification will govern the construction of sanitary sewer manholes complete in place. One-Time Use.
SS7280  PDF  RTF  Water Mains - For project 0739-02-140 in Jefferson County. Install water mains, fittings, distribution lines, service lines, connections, and other appurtenances necessary for a complete and operating system to be constructed within existing right of way or existing easements owned by the City of Beaumont. One-Time Use.
SS7279  PDF  RTF  Sanitary Sewer Main - For project 0739-02-140 in Jefferson County. Install all sanitary sewer mains, fittings, connections, service lines, and other appurtenances necessary for a complete and operating system. One-Time Use.
SS7278  PDF  RTF  Fire Hydrants - For project 0739-02-140 in Jefferson County. This Specification will govern the furnishing and installation of fire hydrants and appurtenances in accordance with these specifications and the details shown on the plans. One-Time Use.
SS7277  PDF  RTF  Testing and Sterilization of Completed Line - For project 0739-02-140 in Jefferson County. This Specification will govern the testing and sterilization of completed water lines. One-Time Use.
SS7276  PDF  RTF  Sanitary Sewer and Water Line - For project 0130-05-085, 0915-00-270 in Bexar, Lubbock Counties. This Item will govern for all materials and work necessary for the installation of all sanitary sewer mains, fittings, connections, service lines, and other appurtenances. One-Time Use.
SS7275  PDF  RTF  Fire Department Connections - For project 0196-07-034 in Dallas County. Furnish and install fire department connections. One-Time Use.
SS7274  PDF  RTF  Installation of Water Lines and Fire Hydrants - For project 0196-07-034 in Dallas County. Furnish, install, or replace water pipe, water valves, water meters and boxes, fire hydrant assemblies, pipe fittings, steel encasement under pavement, pavement repair, and supporting materials. One-Time Use.
SS7273  PDF  RTF  Horizontal Direction Drilling - For project 0049-09-087, 2452-03-087 in Bexar, Brazos Counties. Install a sanitary sewer by the directional drilling method. One-Time Use.
SS7272  PDF  RTF  Sanitary Sewer Pipe Bursting - For project 0049-09-087 in Brazos County. Replace sanitary sewer mains by Pipe Bursting method using hydraulically and pneumatically operated equipment to break and expanding the host pipe while simultaneously inserting liner pipe within the bore of the host pipe. One-Time Use.
SS7271  PDF  RTF  Water & Wastewater Main Replacements and Adjustments - For project 2374-04-085 in Dallas County. Modifications to Water & Wastewater Main Replacements and Adjustments for the City of Dallas One-Time Use.
SS7270  PDF  RTF  Fire Hydrant, Valve, and Meter Adjustment, Relocate and Reconnect - For project 1804-01-068, 1804-01-072 in Hidalgo County. Furnish, install, relocate, and reconnect fire hydrant assemblies and supporting materials in conformance with McAllen Public Utilities requirements and City of McAllen Standard Design Guide for Pubic Infrastructure. One-Time Use.
SS7269  PDF  RTF  Temporary Water Services - For project 0902-90-147 in Tarrant County. Furnish and install temporary water services in conformance to the City of Fort Worth requirements and details shown on the plans. One-Time Use.
SS7268  PDF  RTF  Dry Docking 28 Car Diesel Electric Ferryboats - For project 6385-36-001 in Nueces County. Provide dry docking, cleaning, painting, and repair work on 28-car diesel electric ferryboats. One-Time Use.
SS7267  PDF  RTF  Natural Gas and Pipeline Utilities - For project 0044-04-047 in Delta, Montague Counties. This document will control the scope relating to abandoned gas and pipeline utilities which must be removed to allow for the construction of US 82 in Montague County. One-Time Use.
SS7266  PDF  RTF  Water Mains and Sanitary Sewers - For project 0015-10-062, 0015-13-077, 0015-13-428, 0015-13-433, 0113-13-166, 0113-13-168, 0906-32-064, 0914-04-362 in Midland, Travis Counties. This is a new Special Specification that is being requested in coordination with the Utilities Department for the City of Austin. One-Time Use.
SS7265  PDF  RTF  Travel Information Center - For project 6377-33-001 in Orange County. Furnish all materials, equipment, labor allowances and incidentals necessary for the repair and upgrade of the Travel Information Center. One-Time Use.
SS7264  PDF  RTF  Water Mains and Sanitary Sewers - For project 0016-03-114, 0366-01-081 in Hays County. Modify the provisions of SS 7207 'Water Mains and Sanitary Sewers' which pertains to the City of Austin for the City of San Marcos. One-Time Use.
SS7263  PDF  RTF  Ferryboat Equipment Upgrade - For project 0912-73-220 in Galveston County. New Special Spec for Ferryboat Equipment Upgrade. One-Time Use.
SS7262  PDF  RTF  Ferry Landing and Facilities Upgrade - For project 0367-06-065 in Galveston County. New Special Spec to upgrade Ferry landing and Facilities Upgrade One-Time Use.
SS7261  PDF  RTF  Water Mains and Service Lines - For project 0712-01-041 in Johnson County. Provide and install a complete water main system in accordance with the plans and specifications and in compliance with the City of Grandview's policies. One-Time Use.
SS7260  PDF  RTF  Modular Bridge Expansion Joint System - For project 6374-43-001 in Harris County. Design, fabricate, test, ship, and inspect installation of a modular bridge expansion joint system in accordance with this specification and as shown on the plans. One-Time Use.
SS7259  PDF  RTF  Repair Modular Bridge Expansion Joint System - For project 6374-43-001 in Harris County. Design, fabricate, test, ship modular bridge expansion joint repair components in accordance with this specification and as shown on the plans. Remove and install repair components in accordance with this specification and as shown on the plans. One-Time Use.
SS7258  PDF  RTF  Remove and Replace Modular Joint - For project 6374-43-001 in Harris County. Remove and replace a modular bridge expansion joint system. One-Time Use.

Pages in Groups of 100:  1  2  3  4 

2014 English Special Specifications by Item (All)
Specification Information
Search For a Special Provision or Specification