SP008-021  PDF  RTF   - VOID - DO NOT USE. In Subarticle 8.1.(2) ''Subcontracting,'' the 50-percent minimum for Contractor-performed work with his own organization has been changed to 30-percent minimum. All Federal-Aid projects, unless 008---020 is used (beginning with 08/96 letting). Statewide Use.
SP008-020  PDF  RTF   - In Subarticle 8.1.(2) ''Subcontracting,'' the 50-percent minimum for Contractor-performed work with his own organization has been changed to 30-percent minimum. Also includes all of the provisions of 008---014. All Federal-Aid Surface Treatment-Only and Asphaltic-Concrete-Overlay-Only contracts. Justification for use of 008---020 must be acceptable to the FHWA. Replaces SP008-014 .Replaced by SP008-081 . Statewide Use.
SP008-019  PDF  RTF   - In Subarticle 8.1.(2) ''Subcontracting,'' the 50-percent minimum for Contractor-performed work with his own organization has been changed to 30-percent minimum. Also includes all of the provisions of 008---013. All Non-Federal-Aid Surface Treatment-Only and Asphaltic-Concrete-Overlay-Only contracts. Replaces SP008-013 .Replaced by SP008-032 . Statewide Use.
SP008-018  PDF  RTF   - In Subarticle 8.1.(2) ''Subcontracting,'' the 50-percent minimum for Contractor-performed work with his own organization has been changed to 30-percent minimum. Also includes all of the provisions of 008---012. All Non-Federal-Aid projects, unless 008---019 is used. Replaces SP008-012 .Replaced by SP008-031 . Statewide Use.
SP008-017  PDF  RTF   - VOID - DO NOT USE. Updates 1982 008-132, to reflect 1993 specifications. Allows the Contractor ''lead time'' for materials accumulation, etc. Time charges will begin 180 calendar days. Statewide Use.
SP008-016  PDF  RTF   - VOID - DO NOT USE. Updates 1982 008-132, to reflect 1993 specifications. Allows the Contractor ''lead time'' for materials accumulation, etc. Time charges will begin 120 calendar days. Statewide Use.
SP008-015  PDF  RTF   - VOID - DO NOT USE. Updates 1982 008-132, to reflect 1993 specifications. Allows the Contractor ''lead time'' for materials accumulation, etc. Time charges will begin 90 calendar days after written authorization. Statewide Use.
SP008-014  PDF  RTF   - Surface Treatment-only and asphaltic-concrete-overlay-only. Federal-Aid contracts, when justification is acceptable to the FHWA. Replaced by SP008-020 . Statewide Use.
SP008-013  PDF  RTF   - All Surface Treatment-only and Asphaltic-concrete-overlay-only contracts. All Non-Federal-Aid projects. Replaced by SP008-019 . Statewide Use.
SP008-012  PDF  RTF   - Modifies Subarticle 8.1.(2). All Non-Federal-Aid projects, unless 008---013 is used. Replaced by SP008-018 . Statewide Use.
SP008-011  PDF  RTF   -  Required for contracts with worksites with more than 5 acres of disturbed soil. Replaced by SP008-089 . Statewide Use.
SP008-010  PDF  RTF   - VOID - DO NOT USE. May be used to delay construction of curb and gutter, etc., so City can assess property owners; needs Items delayed listed with starting date for these. Statewide Use.
SP008-009  PDF  RTF   - Other work in area. Statewide Use.
SP008-008  PDF  RTF   - VOID - DO NOT USE. Starting work date on plans. Statewide Use.
SP008-007  PDF  RTF   - VOID - DO NOT USE. 30-day lead time for materials accumulation. Statewide Use.
SP008-006  PDF  RTF   - VOID - DO NOT USE. 90-day lead time for materials accumulation. Statewide Use.
SP008-005  PDF  RTF   - VOID - DO NOT USE. 60-day lead time for materials accumulation. Statewide Use.
SP008-004  PDF  RTF   - Contractor cooperation, with utility adjusters. Statewide Use.
SP008-003  PDF  RTF   - Contractor cooperation, adjoining project. Statewide Use.
SP008-002  PDF  RTF   - Contractor cooperation, within limits of project. Statewide Use.
SP008-001  PDF  RTF   - VOID - DO NOT USE. All Surface Treatment-only and Asphaltic-concrete-overlay-only Contracts. Statewide Use.