1993 English Special Provisions by Item (All)
|
Specification Information
|
Search For a Special Provision or Specification
|
|
SP003-079 |
PDF |
RTF |
- Addresses the DBE program changes. Required on all federal aid projects beginning with the April 2006 letting.
Statewide Use.
|
SP003-078 |
PDF |
RTF |
- For project 0914-00-196 in Travis County. Separate work order for each project.
One-Time Use.
|
SP003-077 |
PDF |
RTF |
- For project 6114-26-001 in McLennan County. Allows contract to have performance bonds for one or two year peroids that are renewable out to the total years of the contract.
One-Time Use.
|
SP003-076 |
PDF |
RTF |
- For project 0027-13-188 in Harris County. Provides for warranty bond for the dollar amount of the items warranted.
One-Time Use.
|
SP003-075 |
PDF |
RTF |
- Implements the multiple work order procurement method.
Statewide Use.
|
SP003-074 |
PDF |
RTF |
- For project 0914-00-186 in Travis County. Provides for specific project locations since signalization to be a separate for each specific project location.
One-Time Use.
|
SP003-073 |
PDF |
RTF |
- For project 0231-10-013 in Bell County. Adds a warranty bond, with powers of attorneys attached, for the dollar amount of the items warranted, executed by a surety company authorized to execute bonds.
One-Time Use.
|
SP003-072 |
PDF |
RTF |
- For project 0500-01-117 in Galveston County. Provides for alternate bids for demolition oand removal of bridges.
One-Time Use.
|
SP003-071 |
PDF |
RTF |
- For project 0910-00-055 in Smith County. For non-site specific signal installation projects.
One-Time Use.
|
SP003-070 |
PDF |
RTF |
- For project 0902-00-094 in Tarrant County. Requires an additional work order to be issued by the Engineer to authorize work for each project location.
One-Time Use.
|
SP003-069 |
PDF |
RTF |
- For project 0176-01-089, 0724-01-040 in Coryell, Nacogdoches Counties. Warranty bond.
One-Time Use.
|
SP003-068 |
PDF |
RTF |
- For project 0912-00-243, 0912-00-244 in Harris County. Provides for each location to be signalized to be a separate project.
One-Time Use.
|
SP003-067 |
PDF |
RTF |
- For project 0914-00-174 in Travis County. Provides for specific project locations since signalization to be a separate for each specific project location.
One-Time Use.
|
SP003-066 |
PDF |
RTF |
- For project 0909-00-039 in McLennan County. Provides for the authorization for work, design details of each location and working days given by work orders.
One-Time Use.
|
SP003-065 |
PDF |
RTF |
- Provides for requirements for error consideration and verbage on sanctions. All projects (beginning with 09/02 letting).
Replaces SP003-048 . Statewide Use.
|
SP003-064 |
PDF |
RTF |
- For project 0912-00-221 in Harris County. Provides for issuing a separate work order for each project.
One-Time Use.
|
SP003-063 |
PDF |
RTF |
- For project 0915-00-098 in Bexar County.
One-Time Use.
|
SP003-062 |
PDF |
RTF |
- For project 0912-71-549 in Harris County.
One-Time Use.
|
SP003-061 |
PDF |
RTF |
- For project 0912-00-219 in Harris County.
One-Time Use.
|
SP003-060 |
PDF |
RTF |
- For project 0918-00-056 in Dallas County.
One-Time Use.
|
SP003-059 |
PDF |
RTF |
- For project 0914-00-166 in Travis County.
One-Time Use.
|
SP003-058 |
PDF |
RTF |
- For project 0921-00-050 in Hidalgo County.
One-Time Use.
|
SP003-057 |
PDF |
RTF |
- For project 0910-00-050, 0912-00-198 in Harris, Smith Counties.
One-Time Use.
|
SP003-056 |
PDF |
RTF |
- For use on the non-site specific projects.
Districtwide Use. Houston District.
|
SP003-055 |
PDF |
RTF |
- For project 0912-31-125 in Brazoria County.
One-Time Use.
|
SP003-054 |
PDF |
RTF |
- For project 0912-31-194 in Harris County.
One-Time Use.
|
SP003-053 |
PDF |
RTF |
- For project 0912-31-112 in Brazoria County.
One-Time Use.
|
SP003-052 |
PDF |
RTF |
- For project 0918-00-050 in Dallas County.
One-Time Use.
|
SP003-051 |
PDF |
RTF |
- For project 0914-00-146 in Travis County.
One-Time Use.
|
SP003-050 |
PDF |
RTF |
- For project 0912-00-178 in Harris County.
One-Time Use.
|
SP003-049 |
|
|
- For various projects. Not Issued
One-Time Use.
|
SP003-048 |
PDF |
RTF |
- Provides for changes to TAC Title 43 Chapter 9 Subchapter B regarding contract management. All projects (beginning with 05/00 letting).
Replaces SP003-036 SP003-044 .Replaced by SP003-065 . Statewide Use.
|
SP003-047 |
PDF |
RTF |
- For project 0043-14-019 in Wichita County.
One-Time Use.
|
SP003-046 |
PDF |
RTF |
- For project 0183-03-042 in Hamilton County.
One-Time Use.
|
SP003-045 |
PDF |
RTF |
- For project 0916-00-043 in Nueces County.
One-Time Use.
|
SP003-044 |
PDF |
RTF |
- Requires the bidder to submit a list of all suppliers and subcontractors who quoted work within 15 days after the notice of award; and requires prompt payment to subcontractors and payment retainage at completion of subcontractor's work. All Construction projects (beginning with 10/99 letting).
Replaces SP003-035 .Replaced by SP003-048 . Statewide Use.
|
SP003-043 |
PDF |
RTF |
- VOID - DO NOT USE. Requires the bidder to submit a list of all suppliers and subcontractors who quoted work within 15 days after the notice of award; and requires prompt payment to subcontractors and payment retainage at completion of subcontractor's work. All Routine Maintenance Contracts (beginning with 10/99 letting).
Statewide Use.
|
SP003-042 |
PDF |
RTF |
- For project 0914-00-137 in Travis County.
One-Time Use.
|
SP003-041 |
PDF |
RTF |
- Redefines how the bids are considered to include A + B bidding.
Statewide Use.
|
SP003-040 |
PDF |
RTF |
- For project 0918-00-044 in Dallas County.
One-Time Use.
|
SP003-039 |
PDF |
RTF |
- For project 0836-02-028 in Bell County.
One-Time Use.
|
SP003-038 |
PDF |
RTF |
- For project 3592-01-004 in El Paso County.
One-Time Use.
|
SP003-037 |
PDF |
RTF |
- For project 0697-02-032 in Henderson County.
One-Time Use.
|
SP003-036 |
PDF |
RTF |
- Revises Article 3.2 to include the sentence: ''If the apparent low bidder has mathematically or materially unbalanced their bid they will not be allowed to bid on future proposals for the same work.'' All Routine Maintenance Contracts.
Replaces SP003-020 .Replaced by SP003-048 . Statewide Use.
|
SP003-035 |
PDF |
RTF |
- Revises Article 3.2 to include the sentence: ''If the apparent low bidder has mathematically or materially unbalanced their bid they will not be allowed to bid on future proposals for the same work.'' All Construction projects.
Replaces SP003-017 .Replaced by SP003-044 . Statewide Use.
|
SP003-034 |
PDF |
RTF |
- For project 0254-03-047 in Nueces County.
One-Time Use.
|
SP003-033 |
PDF |
RTF |
- For project 0912-71-553 in Harris County.
One-Time Use.
|
SP003-032 |
PDF |
RTF |
- For project 0924-06-106 in El Paso County.
One-Time Use.
|
SP003-031 |
PDF |
RTF |
- For project 0009-11-138 in Dallas County.
One-Time Use.
|
SP003-030 |
PDF |
RTF |
- For project 0521-04-222 in Bexar County.
One-Time Use.
|
SP003-029 |
PDF |
RTF |
- For project 0113-13-117 in Travis County.
One-Time Use.
|
SP003-028 |
PDF |
RTF |
- For project 0081-13-031, 0353-02-055 in Denton County.
One-Time Use.
|
SP003-027 |
PDF |
RTF |
- For project 0500-03-472 in Harris County.
One-Time Use.
|
SP003-026 |
PDF |
RTF |
- For project 0914-00-069 in Travis County.
One-Time Use.
|
SP003-025 |
PDF |
RTF |
- For project 0918-00-040 in Dallas County.
One-Time Use.
|
SP003-024 |
PDF |
RTF |
- For project 2121-02-094 in El Paso County.
One-Time Use.
|
SP003-023 |
PDF |
RTF |
- For project 0113-13-084 in Austin County.
One-Time Use.
|
SP003-022 |
PDF |
RTF |
- For various projects in Harris County.
One-Time Use.
|
SP003-021 |
PDF |
RTF |
- For project 0914-00-068 in Travis County.
One-Time Use.
|
SP003-020 |
PDF |
RTF |
- Omits the requirement for awarding contracts within 30 days after the opening of the proposal. All Routine Maintenance Contracts, unless 003---017 is used (beginning with 02/95 letting).
Replaced by SP003-036 . Statewide Use.
|
SP003-019 |
PDF |
RTF |
- Revises 003-005 to eliminate conflict with statewide required 003-017. Required in Non-Federal-Aid Construction projects if District elects to use alternate bid for paving material which contains rubber produced from scrap tires ground in a Texas facility.
Replaces SP003-005 . Statewide Use.
|
SP003-018 |
PDF |
RTF |
- Revises 003-004 to eliminate conflict with statewide required 003-017. For ''Buy America Clause'' (required if District elects to use alternates of foreign steel, iron or coating).
Replaces SP003-004 . Statewide Use.
|
SP003-017 |
PDF |
RTF |
- Provides for compliance with new rules governing letting and contract management. Combination of and replacement for Special Provisions 003---001, 003---008 and 003---016. All Construction projects (beginning with 02/95 letting). Use 003---020 for Routine Maintenance Contracts.
Replaces SP003-001 SP003-008 SP003-016 .Replaced by SP003-035 . Statewide Use.
|
SP003-016 |
PDF |
RTF |
- Incorporates 003---001 with 60 days for RMC for award. Changed time for bidder to execute contract, performance and payment bonds to 28 days, and deleted references to Certificate of Insurance. All Routine Maintenance Contracts (beginning with 09/94 letting).
Replaced by SP003-017 . Statewide Use.
|
SP003-015 |
PDF |
RTF |
- For various projects. Sam Houston Tollway
One-Time Use.
|
SP003-014 |
PDF |
RTF |
- For various projects. Sam Houston Tollway
One-Time Use.
|
SP003-013 |
PDF |
RTF |
- VOID - DO NOT USE. Required on Federal-Aid projects when appropriate for the Department to require bidders to attend at least one of two mandatory pre-bid conferences. Requirement moved to Articles 2.1 and 2.6.
Statewide Use.
|
SP003-012 |
PDF |
RTF |
- VOID - DO NOT USE. Required on Non-Fed-Aid projects when appropriate to require bidders to attend at least one of 2 mandatory pre-bid conferences. Includes 003---001 (bidding preference). Requirement moved to Articles 2.1 and 2.6.
Statewide Use.
|
SP003-011 |
PDF |
RTF |
- For project 0914-00-058 in Travis County.
One-Time Use.
|
SP003-010 |
PDF |
RTF |
- VOID - DO NOT USE. Required on Federal-Aid projects when appropriate for the Department to require bidders to attend a mandatory pre-bid conference. Requirement moved to Articles 2.1 and 2.6.
Statewide Use.
|
SP003-009 |
PDF |
RTF |
- VOID - DO NOT USE. Required on Non-Federal-Aid projects when appropriate, to require bidders to attend a mandatory pre-bid conference.
Statewide Use.
|
SP003-008 |
PDF |
RTF |
- DBE goals are to be shown on Form DBE in the proposal. All projects.
Replaces SP003-002 .Replaced by SP003-017 . Statewide Use.
|
SP003-007 |
PDF |
RTF |
- VOID - DO NOT USE. Required on non-federal-aid projects when the Department requires bidders to attend a pre-bid conference for the purpose of coordinating a geotechnical investigation of the project site by the bidders. Requirement moved to Articles 2.1 and 2.6.
Statewide Use.
|
SP003-006 |
PDF |
RTF |
- VOID - DO NOT USE. Required on Federal-Aid projects when the Department requires bidders to attend a pre-bid conference for the purpose of coordinating a geotechnical investigation of the project site by the bidders. Requirement moved to Articles 2.1 and 2.6.
Statewide Use.
|
SP003-005 |
PDF |
RTF |
- Required in Non-Federal-Aid projects if District elects to use an alternate bid for a paving material which contains rubber produced from scrap tires ground in a Texas facility.
Replaced by SP003-019 . Statewide Use.
|
SP003-004 |
PDF |
RTF |
- For ''Buy America Clause.'' Required if District elects to use alternates of foreign steel, iron or coating.
Replaced by SP003-018 . Statewide Use.
|
SP003-003 |
PDF |
RTF |
- VOID - DO NOT USE. Required for contracts with worksites with more than 5 acres of disturbed soil.
Statewide Use.
|
SP003-002 |
PDF |
RTF |
- DBE goals are to be shown on Form DBE in the proposal. All projects.
Replaced by SP003-008 . Statewide Use.
|
SP003-001 |
PDF |
RTF |
- Provides for bidding preference for Texas contractors. All Non-Federal-Aid projects.
Replaced by SP003-017 . Statewide Use.
|