1993 English Special Provisions to Item 132 - EMBANKMENT (All)
|
SP132-010 |
PDF |
RTF |
- For project 0916-35-046 in Nueces County. Provides for embankment sections that require surcharge and settlement periods.
One-Time Use.
|
SP132-009 |
PDF |
RTF |
- For project 0833-11-019 in Burleson County. Provides for measurement by the square yard.
One-Time Use.
|
SP132-008 |
PDF |
RTF |
- For project 0271-06-088 in Harris County. Provides for settlement monitoring.
One-Time Use.
|
SP132-007 |
PDF |
RTF |
- Revises Article 132.3 to provide for processing of fly ash treated materials.
Districtwide Use. Lubbock District.
|
SP132-006 |
PDF |
RTF |
- For project 0905-06-044 in Lubbock County. Provides for change in lab density test method and field density requirements to allow for differences between standard item and work with fly ash stabilized material.
One-Time Use.
|
SP132-005 |
PDF |
RTF |
- For project 0959-02-009 in Dawson County. Provides for change in lab density test method and field density requirements to allow for differences between standard item and work with fly ash stabilized material.
One-Time Use.
|
SP132-004 |
PDF |
RTF |
- For project 0052-05-034 in Lamb County. Provides for change in lab density test method and field density requirements to allow for differences between standard item and work with fly ash stabilized material.
One-Time Use.
|
SP132-003 |
PDF |
RTF |
- For project 0067-06-045 in Hale County. Provides for change in lab density test method and field density requirements to allow for differences between standard item and work with fly ash stabilized material.
One-Time Use.
|
SP132-002 |
PDF |
RTF |
- Provides for an additional unit of measure by the square yard, of the depth specified. Optional for Routine Maintenance Contracts Only.
Replaces SP132-001 . Statewide Use.
|
SP132-001 |
PDF |
RTF |
- Provides for an additional unit of measure by the square yard. All Routine Maintenance Contracts.
Replaced by SP132-002 . Statewide Use.
|