1993 English Special Provisions to Item 340 - HOT MIX ASPHALTIC CONCRETE PAVEMENT (All)
|
SP340-009 |
PDF |
RTF |
- For project 6070-16-001 in Guadalupe County.
One-Time Use.
|
SP340-008 |
PDF |
RTF |
- Incorporates required SP340---007 and provides for mitigating segregation. Can be used in place of SP 340---007.
Statewide Use.
|
SP340-007 |
PDF |
RTF |
- Incorporates the new aggregate classification system into the specifications and deletes the requirement for PV and skid exception program. All projects with Item 340.
Replaces SP340-006 . Statewide Use.
|
SP340-006 |
PDF |
RTF |
- Revises Item 340 to ensure that hot mix design and material specifications are consistent among Item 340 and QC/QA specification.
Replaces SP340-004 .Replaced by SP340-007 . Statewide Use.
|
SP340-005 |
PDF |
RTF |
- For various projects in Lubbock County.
One-Time Use.
|
SP340-004 |
PDF |
RTF |
- Provides for the use of aggregate skid history as an alternative to the polish value requirement. Also includes the requirements of 340---002. All projects with Item 340 (beginning with 04/95 letting).
Replaces SP340-002 .Replaced by SP340-006 . Statewide Use.
|
SP340-003 |
PDF |
RTF |
- VOID - DO NOT USE. Adds requirements for blending & testing coarse aggr, material requirements to evaluate for moisture susceptibility and requirements for the Contractor to develop the mixture designs for all proposed mixtures. Includes 340---002 which corrects an error
Districtwide Use. Houston District.
|
SP340-002 |
PDF |
RTF |
- Corrects an error in Section 340.4.(7)(a) of 1993 Item 340. All projects with Item 340.
Replaced by SP340-004 . Statewide Use.
|
SP340-001 |
PDF |
RTF |
- For various projects. Sam Houston Tollway Projects only
One-Time Use.
|