2004 English Special Provisions to Item 275 - Cement Treatment (Road-Mixed) (All)


SP275-003  PDF  RTF   - Changes the sampling and testing requirements for Table 1 to say the Engineer may sample the mixture and test. Required for all projects using Item 275 beginning with the January 2012 letting. Replaces SP275-002 . Statewide Use.
SP275-002  PDF  RTF   - Revises Article 275.4.E, Compaction, to complete compaction within 2 hrs after application of water instead of cement. Removes the reference to provide cement in Article 275.6.B, Payment for Cement Treatment. Required on all projects with Item 275 beginning with the March 2010 letting. Replaced by SP275-003 . (Change Memo: de-53-09). Statewide Use.