2014 English Special Provisions to Item 008 - PROSECUTION AND PROGRESS (All)


2014 English Special Provisions by Item (All)
Specification Information
Search For a Special Provision or Specification

SP008-060  PDF  RTF   - For project 0000-00-000, 0051-03-120, 0273-04-050, 0502-01-237, 0675-08-118, 0908-00-130, 0912-00-612, 0912-00-700, 0913-26-070, 1149-01-031, 1685-02-054 in Anderson, Colorado, Galveston, Harris, Montgomery, Taylor, Travis, Williamson Counties. This SP states to ''begin work within 120 calendar days after the authorization date to begin work'' as opposed to ''begin work 120 calendar days after the authorization date to begin work.'' One-Time Use.
SP008-059  PDF  RTF   - For project 0000-00-000, 0028-13-135, 0906-00-238, 0920-03-082, 1109-01-026 in Anderson, Ector, Hardin, Jasper, Jefferson Counties. This SP states to ''begin work within 150 calendar days after the authorization date to begin work'' as opposed to ''begin work 150 calendar days after the authorization date to begin work.'' One-Time Use.
SP008-058  PDF  RTF   - For project 0000-00-000, 0061-02-033, 0062-07-103, 0089-01-099, 0906-00-236 in Anderson, Bowie, Ector, Harrison, Victoria Counties. This SP states to ''begin work within 180 calendar days after the authorization date to begin work'' as opposed to ''begin work 180 calendar days after the authorization date to begin work.'' One-Time Use.
SP008-057  PDF  RTF   - For project 0000-00-000 in Anderson County. This SP states to ''begin work within 270 calendar days after the authorization date to begin work'' as opposed to ''begin work 270 calendar days after the authorization date to begin work.'' One-Time Use.
SP008-056  PDF  RTF   - Article 8.1., ''Prosecution of Work,'' is voided and replaced. This SP states to ''begin work within 90 calendar days after the authorization date to begin work'' as opposed to ''begin work 90 calendar days after the authorization date to begin work.'' Statewide Use.
SP008-055  PDF  RTF   - Article 8.1., ''Prosecution of Work,'' is voided and replaced. This SP states to ''begin work within 60 calendar days after the authorization date to begin work'' as opposed to ''begin work 60 calendar days after the authorization date to begin work.'' Statewide Use.
SP008-054  PDF  RTF   - Item 8, ''Prosecution and Progress'' of the Standard Specifications is amended with respect to Article 3., ''Computation of Contract Time for Completion.'' Required for all projects using ''Prosecution and Progress,'' beginning with the September 2023 letting. Statewide Use.
SP008-053  PDF  RTF   - For project 0908-00-106 in Taylor County. Article 8.1., ''Prosecution of Work.'' The first sentence of the first paragraph is voided and replaced. One-Time Use.
SP008-052  PDF  RTF   - For project 0915-45-056 in Medina County. Item 8, ''Prosecution and Progress,'' of the Standard Specifications is amended with the first sentence of the first paragraph being voided and replaced. One-Time Use.
SP008-051  PDF  RTF   - For project 0906-00-219 in Ector County. Article 8.1., ''Prosecution of Work.'' The first sentence of the first paragraph is voided and replaced by the following. Begin work on October 2, 2023. Do not begin work before this period unless authorized in writing by the Engineer. One-Time Use.
SP008-050  PDF  RTF   - For project 0008-13-248 in Tarrant County. Article 8.1., ''Prosecution of Work.'' The first sentence of the first paragraph is voided and replaced. One-Time Use.
SP008-049  PDF  RTF   - For project 0906-00-217 in Ector County. Item 8, ''Prosecution and Progress,'' of the Standard Specifications is amended with respect to the clauses cited below. No other clauses or requirements of this Item are waived or changed. Article 8.1., ''Prosecution of Work.'' One-Time Use.
SP008-048  PDF  RTF   - For project 0010-06-044, 0010-19-014 in Bowie, Titus Counties. Item 8, ''Prosecution and Progress'' of the Standard Specifications is amended with respect to Article 8.1., ''Prosecution of Work,'' Article 8.3., ''Computation of Contract Time for Completion,'' and Section 8.3.1., ''Working Day Charges.'' One-Time Use.
SP008-047  PDF  RTF   - For project 0699-01-052 in Taylor County. Item 8, ''Prosecution and Progress'' of the Standard Specifications is amended with respect to Article 8.1. One-Time Use.
SP008-046  PDF  RTF   - For project 0699-01-052 in Taylor County. Item 8, ''Prosecution and Progress'' of the Standard Specifications is amended with respect to Article 9. and Article 10. One-Time Use.
SP008-045  PDF  RTF   - Supplemented sections in Article 8.6., Failure to Complete Work On Time.'' Required when lane closure assessment fees are utilized. Replaces 2014 SP 008-017 beginning with the December 2021 letting. Replaces SP008-017 . Statewide Use.
SP008-044  PDF  RTF   - Item 8, ''Prosecution and Progress'' of the Standard Specifications is amended with respect to Article 8.3. Districtwide Use. Lubbock District.
SP008-043  PDF  RTF   - For project 0001-01-062, 0001-02-074, 0001-02-076, 0001-02-079, 0001-04-102, 0002-02-059, 0002-07-057, 0167-02-079, 0167-02-081, 0167-02-086, 0374-02-124, 0674-01-071, 0924-00-161, 0924-06-620, 0924-06-643, 0924-06-644, 0924-08-007, 1046-03-012, 2552-02-039 in Culberson, El Paso, Hudspeth Counties. Modifies Article 8.1., ''Prosecution of Work'' and Article 8.3., ''Computation of Time for Completion'' One-Time Use.
SP008-042  PDF  RTF   - For project 0067-06-060, 0905-00-093, 0905-00-100, 0905-00-122 in Hale, Lubbock Counties. Modifications to Articles 8.1 and 8.3. One-Time Use.
SP008-041  PDF  RTF   - For project 0902-39-035 in Palo Pinto County. Item 8, ''Prosecution and Progress'' of the Standard Specifications is amended with respect to Article 3 and Article 9. One-Time Use.
SP008-040  PDF  RTF   - For project 0463-04-024, 0494-08-015 in Glasscock County. New Provision adds additional CPM scheduling requirements. One-Time Use.
SP008-039  PDF  RTF   - For project 3422-01-012 in Fort Bend County. Item 8, ''Prosecution and Progress'' of the Standard Specifications is amended with respect to the clauses cited below. No other clauses or requirements of this Item are waived or changed. One-Time Use.
SP008-038  PDF  RTF   - For project 0428-03-012, 0919-00-080 in Cass, Panola Counties. This special provision will allow for more optimal weather conditions to place thermoplastic pavement markings on seal coat. One-Time Use.
SP008-037  PDF  RTF   - For project 0028-14-091 in Orange County. Item 8, ''Prosecution and Progress'' of the Standard Specifications is amended with respect to the clauses cited. One-Time Use.
SP008-036  PDF  RTF   - For project 0922-11-043 in Val Verde County. Item 8, ''Prosecution and Progress'' of the Standard Specifications is amended with respect to Article 8.1 One-Time Use.
SP008-035  PDF  RTF   - For project 0228-02-048 in Gaines County. Article 8.1., ''Prosecution of Work.'' The first sentence of the first paragraph is voided and replaced by the following. Begin work on November 4, 2019. Do not begin work before this period unless authorized in writing by the Engineer. One-Time Use.
SP008-034  PDF  RTF   - For project 0002-07-049 in Hudspeth County. Item 8, ''Prosecution and Progress'' of the Standard Specifications is amended with respect to the clauses cited below. No other clauses or requirements of this Item are waived or changed. One-Time Use.
SP008-033  PDF  RTF   - With this special provision, Article 8.7.2., ''Wrongful Default,'' of the standard specifications and Special Provision 008-023 are voided and replaced. Required on all contracts beginning with the April 2019 letting. Voids and replaces 008-023. Replaces SP008-023 . Statewide Use.
SP008-032  PDF  RTF   - For project 0626-01-007 in Reeves County. Void first sentence of Article 8.1. and replace with: Begin work on September 10, 2018. Do not begin work before this period unless authorized in writing by the Engineer. One-Time Use.
SP008-030  PDF  RTF   - Revises Standard Item 8 to address the Prime Contractors' responsibility for requiring their Subcontractors participation in E-verify. Required for all projects beginning with the April 2018 letting. Statewide Use.
SP008-029  PDF  RTF   - For project 0919-03-053, 6304-88-001 in Harrison County. Add incentive for contractor to substantially complete work early within a milestone and disincentive for failure of contractor to substantially complete work in days allotted within a milestone. One-Time Use.
SP008-027  PDF  RTF   - For project 0006-15-034 in Nolan County. Item 8, “Prosecution and Progress” of the Standard Specification is amended with respect to the clauses cited below. No other clauses or requirements of this Item are waived or changed. One-Time Use.
SP008-025  PDF  RTF   - For project 0005-10-023, 0006-03-137, 0034-01-129, 0053-09-073, 0095-06-074, 0108-06-055, 0138-16-006, 0190-06-012, 0263-01-021, 0336-02-029, 0437-01-025, 0677-01-023, 0919-00-091, 0924-06-663, 0974-02-017, 1507-02-016, 1654-01-019, 1895-02-013, 3276-01-020 in Anderson, Bailey, Borden, Burleson, Callahan, Cass, El Paso, Fisher, Gregg, Harrison, Haskell, Houston, Howard, Jones, Kent, Mitchell, Nolan, Scurry, Shackelford, Smith, Stonewall, Taylor, Van Zandt Counties. Item 8, ''Prosecution and Progress'' of the Standard Specifications is amended with respect to the clauses cited below. No other clauses or requirements of this Item are waived or changed. Begin work on date specified in the plans, will replace Begin work on May 1, 2016. One-Time Use.
SP008-024  PDF  RTF   - For project 0923-06-075 in Brown County. Begin work on May 30, 2017. One-Time Use.
SP008-023  PDF  RTF   - VOID - DO NOT USE. Article 8.7.2., ''Wrongful Default,'' of the Standard Specifications is voided and replaced by 008-033. Required on all contracts beginning with the January 2017 letting. Do not use after March 2019. Replaced by SP008-033 . Statewide Use.
SP008-022  PDF  RTF   - For project 0027-07-032 in Fort Bend County. The Standard Specifications is amended with respect to Prosecution of Work. One-Time Use.
SP008-021  PDF  RTF   - For project 0006-06-099, 0033-03-029 in Jones, Taylor Counties. Provides for lane closure assessment fees. One-Time Use.
SP008-020  PDF  RTF   - For project 0908-12-022 in Howard County. Provides for incentives and disincentives using specified rates. One-Time Use.
SP008-018  PDF  RTF   - For project 0363-01-139 in Tarrant County. The Contractor's attention is directed to scheduling requirements for this project. One-Time Use.
SP008-017  PDF  RTF   - VOID - DO NOT USE. Lane closure assessment fees. Replaces 2014 SP 008-001 beginning with the March 2016 letting. Approved for CSJ 0904-00-173,2121-03-060,0015-06-087 CSJ 000602112, 003308038, 009001032, 016810073, 027501180,067507096,069702039,629915001,067507101,000501107,061701196,20011095,263502035,006507062,006507062,005001086,004105052,009009006,027501204,22180135,061007113,019501119,049503065,090119196,003305095 Replaces SP008-001 .Replaced by SP008-045 . Districtwide Use. Amarillo District, Houston District, Austin District, San Antonio District, Corpus Christi District, Dallas District.
SP008-016  PDF  RTF   - For project 2879-01-010 in Bowie County. Begin work on March 6, 2017, so that striping can be placed at the optimum time of year. One-Time Use.
SP008-015  PDF  RTF   - For project 0313-02-057, 1068-02-076 in Parker, Tarrant Counties. Adds Article 9 to provides for no excuse incentives and incentives. One-Time Use.
SP008-014  PDF  RTF   - For project 0407-05-025, 0558-04-021 in Howard, Taylor Counties. Begin work on May 1, 2016 so that striping can be placed at the optimum time of year. One-Time Use.
SP008-012  PDF  RTF   - For project 0162-11-001, 0549-03-025, 2679-03-010 in Collin, Navarro Counties. Replaces Article 8.1 to allow work to begin 270 days after authorization. Requires Specification Committee approval prior to use. Do not use with SP008-002, SP008-003, SP008-004, SP008-005, SP008-009, or SP008-010 One-Time Use.
SP008-011  PDF  RTF   - For project 0380-01-085 in Lubbock County. Begin work on March 1, 2017, so that striping can be placed at the optimum time of year. One-Time Use.
SP008-010  PDF  RTF   - For project 0010-08-060, 0015-13-428, 0032-01-034, 0086-14-075, 0213-07-047, 0906-00-268, 0987-03-014 in Ector, Hays, Knox, Morris, Travis, Tyler, Webb Counties. Replaces Article 8.1 to allow work to begin 180 days after authorization. Requires Specification Committee approval prior to use. Do not use with SP008-002, SP008-003, SP008-004, SP008-005, SP008-009, or SP008-011. One-Time Use.
SP008-009  PDF  RTF   - For project 0096-03-075, 0098-04-036, 0213-06-041, 0303-03-050 in Childress, Knox, Tyler, Upshur Counties. Replaces Article 8.1 to allow work to begin 150 days after authorization. Use of this SP requires approval. Do not use with SP008-002, SP008-003, SP008-004, SP008-005, SP008-010, or Sp008-011. One-Time Use.
SP008-008  PDF  RTF   - For project 6182-61-001, 6182-62-001, 6182-63-001, 6182-64-001, 6182-65-001, 6281-61-001 in Cameron, Harris, Jefferson, Nueces, Victoria Counties. The Standard Specifications is amended with respect to Prosecution of Work and Working Day Charges. One-Time Use.
SP008-006  PDF  RTF   - Provides for incentives using Road-User Cost or Contract Administration Liquidated Damages and disincentives using Road-User Cost. May be used at the districts option. (2004 008-069) Statewide Use.
SP008-005  PDF  RTF   - For project 0002-19-010, 0009-04-075, 0009-13-192, 0011-07-062, 0015-08-431, 0015-11-074, 0016-02-169, 0017-05-102, 0026-02-039, 0041-01-050, 0044-01-110, 0055-01-031, 0055-03-028, 0067-01-087, 0071-04-057, 0071-06-062, 0074-01-060, 0090-02-055, 0112-02-036, 0112-03-036, 0113-13-184, 0114-20-014, 0140-01-081, 0168-08-075, 0170-02-023, 0204-02-036, 0265-03-053, 0271-07-324, 0285-02-015, 0286-01-065, 0292-04-072, 0334-05-035, 0373-02-097, 0700-04-053, 0700-04-054, 0914-04-288, 1197-01-025, 1378-03-039, 1378-04-056, 2103-01-044, 2210-01-008, 2293-01-032, 2295-01-019, 2718-01-015, 3210-01-020, 3351-02-006 in Bastrop, Blanco, Burnet, Coryell, Dallas, Delta, Fannin, Fayette, Franklin, Gillespie, Grayson, Harris, Hartley, Hays, Hopkins, Hudspeth, Hunt, Lamar, Lee, Lipscomb, Live Oak, Llano, Mason, Medina, Mills, Nueces, Oldham, Pecos, Potter, Rains, Randall, Red River, Stephens, Travis, Ward, Wichita, Williamson Counties. Replaces Article 8.1 and 8.3 to identify an asphalt season. Optional for all projects beginning with the January 2015 letting. Use of this SP requires approval. For surface treatment, asphaltic concrete overlay, and microsurfacing contracts only. Do not use with SP008-002, SP008-003, or SP008-004. One-Time Use.
SP008-004  PDF  RTF   - For project 0004-07-135, 0005-13-064, 0005-14-092, 0005-14-094, 0005-15-093, 0006-18-064, 0010-12-072, 0010-12-075, 0015-13-428, 0028-02-098, 0046-06-082, 0051-09-126, 0062-07-094, 0102-04-097, 0110-06-144, 0110-06-154, 0111-08-120, 0138-11-032, 0157-09-005, 0178-01-037, 0178-01-042, 0179-11-004, 0188-09-051, 0192-02-054, 0238-03-065, 0281-07-075, 0389-06-088, 0500-03-625, 0543-02-077, 0668-02-022, 0683-02-074, 0700-03-149, 0720-02-097, 0720-03-137, 0720-06-002, 0904-00-181, 0904-00-188, 0906-00-267, 0907-24-053, 0912-00-587, 0912-00-588, 0912-00-590, 0912-00-625, 0918-00-380, 0976-01-045, 1020-01-057, 1200-04-016, 1392-01-044, 2568-01-009, 3510-06-030, 6393-10-001, 6433-92-001, 6444-50-001 in Bowie, Collin, Dallas, Ector, Fort Bend, Galveston, Harris, McLennan, Midland, Taylor, Tom Green, Travis, Upton, Williamson Counties. Replaces Article 8.1 to allow work to begin 120 days after authorization. Use of this SP requires approval. Do not use with SP008-002, SP008-003, or SP008-005. One-Time Use.
SP008-003  PDF  RTF   - For project 0003-08-065, 0004-07-139, 0005-01-116, 0017-06-086, 0025-03-105, 0045-09-110, 0045-09-116, 0047-06-158, 0054-03-027, 0054-07-090, 0054-08-027, 0067-07-094, 0069-07-111, 0070-02-099, 0088-05-110, 0089-07-154, 0103-01-044, 0118-02-036, 0140-02-050, 0142-06-029, 0159-07-007, 0168-09-083, 0194-01-010, 0211-06-059, 0213-06-041, 0266-02-070, 0271-01-083, 0371-01-090, 0515-03-055, 0902-50-143, 0913-20-092, 0915-00-259, 1113-01-030, 1434-02-005 in Angelina, Austin, Bexar, Brazos, Brown, Calhoun, Camp, Cass, Coke, Coleman, Collin, Colorado, Comal, Cooke, Crockett, DeWitt, Eastland, Ector, Fannin, Fayette, Fort Bend, Frio, Gonzales, Grayson, Guadalupe, Harris, Houston, Hunt, Jasper, Jefferson, Johnson, Lamar, Liberty, Lubbock, McLennan, Midland, Mills, Nacogdoches, Newton, Pecos, Randall, Reeves, Robertson, Shackelford, Smith, Terry, Titus, Tom Green, Travis, Trinity, Tyler, Van Zandt, Victoria, Wharton, Wilson, Winkler Counties. Replaces Standard Article 8.1 to allow work to begin 90 days after authorization. Use of this SP requires approval. Do not use with SP008-002, SP008-004, or SP008-005. One-Time Use.
SP008-002  PDF  RTF   - For project 0006-15-038, 0015-01-246, 0015-13-433, 0068-05-040, 0092-02-135, 0092-14-103, 0141-04-039, 0196-01-118, 0327-05-041, 0901-30-018, 0905-00-134, 0905-12-045, 0912-34-185, 0912-37-237, 0919-00-085, 0919-00-092, 0921-06-269, 1402-03-012, 1706-02-008, 1709-02-021, 2374-04-086 in Cameron, Cass, Dallas, Dawson, Denton, Kenedy, Fannin, Fort Bend, Hale, Kimble, Lubbock, McLennan, Montgomery, Nolan, Rains, Sutton, Travis Counties. Replaces Article 8.1 to allow work to begin 60 days after authorization. Use of this SP requires approval. Do not use with SP008-003, SP008-004, or SP008-005. One-Time Use.
SP008-001  PDF  RTF   - VOID - DO NOT USE. Lane closure assessment fees. (2004 SP008-013). This is a district wide specification. Voided and replaced by SP 008-017 beginning with the March 2016 letting. Replaced by SP008-017 . Districtwide Use. Houston District, Austin District, San Antonio District, Dallas District.