2014 English Special Provisions to Item 247 - FLEXIBLE BASE (All)


SP247-005  PDF  RTF   - This Special Provision incorporates 2024 Standard Specification language from Item 247. Required for all projects using Flexible Base beginning with the February 2024 letting. Use of this SP prior to the February 2024 letting is at the District's option. It will also replace the current statewide SP 247-003. Replaces SP247-003 . Statewide Use.
SP247-004  PDF  RTF   - For project 0086-14-075 in Webb County. Item 247, ''Flexible Base'' of the Standard Specifications is amended with respect to Section 5.2., ''Cubic Yard in Stockpile,'' and Section 5.3., ''Cubic Yard in Final Position.'' One-Time Use.
SP247-003  PDF  RTF   - VOID - DO NOT USE. This special provision adds certification requirements when utilizing Contractor's test results for consideration of acceptance, use of SiteManager templates, obtaining samples, referee test requirements and ride quality requirement modifications. Required for all projects using Flexible Base beginning with the September 2018 letting. Replaced by SP247-005 . Statewide Use.
SP247-002  PDF  RTF   - Hereby amended with respect to Section 2.4., ''Tube Suction Test.'', Section 2.5., ''Certification.'', Section 2.6., ''Reporting and Responsibilities.'', Section 2.7., ''Sampling.'', Section 2.8., ''Referee Testing.'', Section 4.6., ''Ride Quality.'' Also approved for CSJ: 0259-03-055, 2631-01-006, 0089-09-088, and 1990-01-020. Districtwide Use. Atlanta District, Brownwood District.
SP247-001  PDF  RTF   - For project 0441-07-062 in Pecos County. Flexible Base (Roadway Delivery) is changed to be measured by the square yard and payment is defined by specific type and grade. One-Time Use.

2014 English Special Provisions by Item (All)
Specification Information
Search For a Special Provision or Specification