2014 English Special Provisions to Item 400 - EXCAVATION AND BACKFILL FOR STRUCTURES (All)
|
SP400-005 |
PDF |
RTF |
- For project 0135-10-050 in Denton County. For this project, Item 400, ''Excavation and Backfill for Structures,'' of the Standard Specifications, is hereby amended with respect to the clause cited, Section 400.3.1.1.
One-Time Use.
|
SP400-004 |
PDF |
RTF |
- For project 0912-72-360 in Harris County. Item 400, ''Excavation and Backfill for Structures,'' of the Standard Specifications is amended with respect to the clauses cited below.
One-Time Use.
|
SP400-003 |
PDF |
RTF |
- For project 0683-01-056 in Williamson County. Item 400, ''Excavation and Backfill for Structures'' of the Standard Specifications is amended with respect to the clauses cited.
One-Time Use.
|
SP400-002 |
PDF |
RTF |
- For project 1477-01-040 in Bexar County. Addendum to the excavation and backfill for structures.
One-Time Use.
|
SP400-001 |
PDF |
RTF |
- Unless otherwise shown on the plans, the sand backfill shall have 70-100% passing a No. 10 sieve. The plastic Index (PI) as determined by Test Method Tex-106-E shall not exceed 6.
Districtwide Use. Pharr District.
|