2014 English Special Provisions to Item 506 - Temporary Erosion, Sedimentation, and Environmental Controls (All)


SP506-003  PDF  RTF   - Identifies contractor co-permittee requirements and contractor-required training for storm water management. Special Provisions 007-004 must be used in conjunction with this special provision. Required for all projects not using SP 506-002 beginning with the January 2016 letting. Replaces SP506-001 . Statewide Use.
SP506-002  PDF  RTF   - Modifies Standard Item 506 for projects that disturb less than one acre or routine maintenance activities that maintain the original line and grade, hydraulic capacity, or original purposes of the site. If SP 506-002 is used, do not use SP 506-003. Statewide Use.
SP506-001  PDF  RTF   - Identifies contractor-required training for storm water management. Required for all projects utilizing 2014 SP 506 beginning with the November 2014 letting. (2004 SP 1122-001). Replaced by SP506-003 . Statewide Use.

2014 English Special Provisions by Item (All)
Specification Information
Search For a Special Provision or Specification