1993 English Special Provisions for El Paso - District 24 (All)


SP538-001  PDF  RTF  RIGHT OF WAY MARKERS - Allows markers to be placed by the Contractor with actual location and setting of the right of way by a State survey crew under the direction of a Registered Professional Land Surveyor. Replaced by SP538-002 . Districtwide Use.
SP502-033  PDF  RTF  BARRICADES, SIGNS AND TRAFFIC HANDLING - Updates 502-022 (districtwide) to include 502-027 (statewide required). Replaces SP502-022 . Districtwide Use.
SP502-022  PDF  RTF  BARRICADES, SIGNS AND TRAFFIC HANDLING - Allows for measurement and payment of lane closures when they will only be needed for short periods, usually one (1) day or less. Optional for Routine Maintenance Contracts Only. Replaced by SP502-033 . Districtwide Use.
SP421-032  PDF  RTF  PORTLAND CEMENT CONCRETE - Provides for using the maturity method. Districtwide Use.
SP420-016  PDF  RTF  CONCRETE STRUCTURES - Provides for all plans for forms and falsework, superstructure spans over 20 ft long and for all bridge widening details to be submitted to the Engineer. Replaces SP420-014 . Districtwide Use.
SP420-014  PDF  RTF  CONCRETE STRUCTURES - Provides for using the maturity method. Replaced by SP420-016 . Districtwide Use.
SP360-037  PDF  RTF  CONCRETE PAVEMENT - Provides for the use of the maturity method and includes the requirements of 360---035. Replaces SP360-030 . Districtwide Use.

1993 English Special Provisions By District (All)
1993 English Special Provisions by Item (All)
Specification Information