2014 English Special Provisions for Fort Worth - District 2 (Statewide & Districtwide, Current)


SP007-009  PDF  RTF  LEGAL RELATIONS AND RESPONSIBILITIES - When notified by the city of Grapevine that a major traffic generating event is scheduled within at least 180 days, ensure all lanes and ramps are available during peak traffic periods before, during, and after significant traffic generator events. Required on all projects impacting the city of Grapevine. Includes language from SP 007-010. Districtwide Use.
SP6010-001  PDF  RTF  Closed Circuit Television (CCTV) Field Equipment - Removed all analog components of existing Special Specification 6010 and replaced with the latest digital requirements for CCTV cameras. Required for Construction projects in the Dallas and Fort Worth District's, using Closed Circuit Television (CCTV) Field Equipment. Districtwide Use.

2014 English Special Provisions By District (Statewide & Districtwide, Current)
2014 English Special Provisions by Item (Statewide & Districtwide, Current)
Specification Information