1993 English Special Provisions to Item 003 - AWARD AND EXECUTION OF CONTRACT (Statewide & Districtwide, Current)

SP003-079  PDF  RTF   - Addresses the DBE program changes. Required on all federal aid projects beginning with the April 2006 letting. Statewide Use.
SP003-075  PDF  RTF   - Implements the multiple work order procurement method. Statewide Use.
SP003-065  PDF  RTF   - Provides for requirements for error consideration and verbage on sanctions. All projects (beginning with 09/02 letting). Replaces SP003-048 . Statewide Use.
SP003-041  PDF  RTF   - Redefines how the bids are considered to include A + B bidding. Statewide Use.
SP003-019  PDF  RTF   - Revises 003-005 to eliminate conflict with statewide required 003-017. Required in Non-Federal-Aid Construction projects if District elects to use alternate bid for paving material which contains rubber produced from scrap tires ground in a Texas facility. Replaces SP003-005 . Statewide Use.
SP003-018  PDF  RTF   - Revises 003-004 to eliminate conflict with statewide required 003-017. For ''Buy America Clause'' (required if District elects to use alternates of foreign steel, iron or coating). Replaces SP003-004 . Statewide Use.

  HOUSTON - DISTRICT 12
SP003-056  PDF  RTF   - For use on the non-site specific projects. Districtwide Use.

1993 English Special Provisions by Item (Statewide & Districtwide, Current)
Specification Information
Search For a Special Provision or Specification