1993 English Special Provisions by Item (Statewide & Districtwide, Current)
|
Specification Information
|
Search For a Special Provision or Specification
|
|
SP008-280 |
PDF |
RTF |
- Implements the multiple work order procurement method.
Statewide Use.
|
SP008-248 |
PDF |
RTF |
- Provides for the use of contract adminstration liquidated damage rates for incentives to accelerate construction projects. Optional.
Statewide Use.
|
SP008-244 |
PDF |
RTF |
- Provides that the Department may imposed sanctions on Contractors that default. All projects (beginning with 09/02 letting).
Replaces SP008-202 . Statewide Use.
|
SP008-233 |
PDF |
RTF |
- Provides an incentive for early completion. (District's Option)
Statewide Use.
|
SP008-159 |
PDF |
RTF |
- Modify special provision 008---118 (optional) to allow work to start 180 days after authorization.
Statewide Use.
|
SP008-158 |
PDF |
RTF |
- Modify special provision 008---118 (optional) to allow work to start 120 days after authorization.
Statewide Use.
|
SP008-157 |
PDF |
RTF |
- Modify special provision 008---118 (optional) to allow work to start 90 days after authorization.
Statewide Use.
|
SP008-156 |
PDF |
RTF |
- Modify special provision 008---118 (optional) to allow work to start 60 days after authorization.
Statewide Use.
|
SP008-155 |
PDF |
RTF |
- Modify special provision 008---118 (optional) to allow start date for work to be shown on the plans.
Statewide Use.
|
SP008-152 |
PDF |
RTF |
- Credit for substantially complete the project and/or phases ahead of time (incentive provision).
Statewide Use.
|
SP008-151 |
PDF |
RTF |
- Failure to substantially complete the project (or specified phases) within working days stated will result in the daily road-user cost being assessed.
Statewide Use.
|
SP008-146 |
PDF |
RTF |
- Modify special provision 008-117 (required) to allow work to start 30 days after authorization. Lead time of 30 days (Not to be used with 008-117)(District's option).
Statewide Use.
|
SP008-145 |
PDF |
RTF |
- Modify special provision 008-117 (required) to allow start date for work to be shown on the plans. Start date shown on plans (Not to be used with 008-117)(District's option).
Statewide Use.
|
SP008-133 |
PDF |
RTF |
- Allows for the assessment of liquidated damages for either the total working days or each cycle, as specified in the proposal. All Routine Maintenance Contracts.
Statewide Use.
|
SP008-130 |
PDF |
RTF |
- Modify special provision 008-117 (required) to allow work to start 180 days after authorization. Lead time of 180 days (Not to be used with 008-117)(District's Option).
Statewide Use.
|
SP008-129 |
PDF |
RTF |
- Modify special provision 008-117 (required) to allow work to start 120 days after authorization. Lead time of 120 days (Not to be used with 008-117)(District's Option).
Statewide Use.
|
SP008-128 |
PDF |
RTF |
- Modify special provision 008-117 (required) to allow work to start 90 days after authorization. Lead time of 90 days (Not to be used with 008-117)(District's Option).
Statewide Use.
|
SP008-127 |
PDF |
RTF |
- Modify special provision 008-117 (required) to allow work to start 60 days after authorization. Lead time of 60 days (Not to be used with 008-117)(District's Option).
Statewide Use.
|
SP008-119 |
PDF |
RTF |
- Required for surface treatment only & asphaltic-concrete-overlay only contracts, Non-Federal-Aid construction or Federal-Aid construction projects when acceptable to FHWA. Can be used in place of 008-117 and 008-118 (beginning with 10/97 letting). Must show roadway-start-work date on the plans.
Replaces SP008-090 . Statewide Use.
|
SP008-118 |
PDF |
RTF |
- Requires Contractor to use a Critical Path Method (CPM) Project Schedule using the Precedence Diagram Method (PDM). Can be used in place of 008-117 (beginning with 10/97 letting).
Replaces SP008-070 . Statewide Use.
|
SP008-117 |
PDF |
RTF |
- Provides for an optional Critical Path Method (CPM) Project schedule. All Construction projects unless 008-118 is used (beginning with 10/97 letting).
Replaces SP008-070 . Statewide Use.
|
SP008-111 |
PDF |
RTF |
- Clarifies when time charges will begin on Routine Maintenance Projects. Includes requirements of 008-091. All Routine Maintenance Contracts (beginning with 08/97 letting).
Replaces SP008-091 . Statewide Use.
|
SP008-009 |
PDF |
RTF |
- Other work in area.
Statewide Use.
|
SP008-004 |
PDF |
RTF |
- Contractor cooperation, with utility adjusters.
Statewide Use.
|
SP008-003 |
PDF |
RTF |
- Contractor cooperation, adjoining project.
Statewide Use.
|
SP008-002 |
PDF |
RTF |
- Contractor cooperation, within limits of project.
Statewide Use.
|
|
|
DALLAS - DISTRICT 18 |
SP008-285 |
PDF |
RTF |
- Provides for lane closure assessment fees.
Districtwide Use.
|
|
|
HOUSTON - DISTRICT 12 |
SP008-231 |
PDF |
RTF |
- Provides for the use of Lane Closure Assessment Fees.
Districtwide Use.
|
|
|
BEAUMONT - DISTRICT 20 |
SP008-218 |
PDF |
RTF |
- Provides for description of the time intervals at which work orders may be issued, how many projects the Contractor may be working on at one time and length of contract with last working day to issue work orders. Routine Maintenance Contracts Only.
Districtwide Use.
|
|
|
HOUSTON - DISTRICT 12 |
SP008-188 |
PDF |
RTF |
- For non-site specific projects, Article 8.5 is changed to explain when time charges begin, and Article 8.6 is voided and replaced to explain liquidated damages.
Districtwide Use.
|
|
|
SAN ANTONIO - DISTRICT 15 |
SP008-131 |
PDF |
RTF |
- Requires the Contractor's person in charge of Traffic Control to attend certain courses.
Replaces SP008-109 . Districtwide Use.
|