1993 English Special Provisions to Item 360 - CONCRETE PAVEMENT (Statewide & Districtwide, Current)
SP360-053 |
PDF |
RTF |
- Changes the requirements of the concrete mix design and 7-day job control strengths. (Required unless 360-052 is used, beginning with the July 2003 letting.)
Replaces SP360-036 . Statewide Use.
|
SP360-052 |
PDF |
RTF |
- Changes the requirements of the concrete mix design and 7-day job control strengths. (Required unless 360-053 is used, beginning with the July 2003 letting.)
Replaces SP360-035 . Statewide Use.
|
|
|
HOUSTON - DISTRICT 12 |
SP360-060 |
PDF |
RTF |
- To improve the performance and quality of thin bonded concrete overlay.
Districtwide Use.
|
SP360-058 |
PDF |
RTF |
- Adds the requirements for the maturity method to statewide 360-053 (required unless 360-052 is used).
Districtwide Use.
|
|
|
BEAUMONT - DISTRICT 20 |
SP360-037 |
PDF |
RTF |
- Provides for the use of the maturity method and includes the requirements of 360---035.
Replaces SP360-030 . Districtwide Use.
|
|
|
DALLAS - DISTRICT 18 |
SP360-037 |
PDF |
RTF |
- Provides for the use of the maturity method and includes the requirements of 360---035.
Replaces SP360-030 . Districtwide Use.
|
|
|
EL PASO - DISTRICT 24 |
SP360-037 |
PDF |
RTF |
- Provides for the use of the maturity method and includes the requirements of 360---035.
Replaces SP360-030 . Districtwide Use.
|
|
|
HOUSTON - DISTRICT 12 |
SP360-037 |
PDF |
RTF |
- Provides for the use of the maturity method and includes the requirements of 360---035.
Replaces SP360-030 . Districtwide Use.
|