2014 English Special Provisions to Item 426 - POST-TENSIONING (Statewide & Districtwide, Current)

SP426-003  PDF  RTF   - Section 2.2, only references DMS-4670 Grouts for Post-Tensioning Section 4.2 Required Submittals to 4 sub-sections 4.2.1-4.2.4 adds Stressing Safety Plan Change Section 4.4 to 4.3 and Section 4.6 to 4.5 and requirement in Table 1 to reference PTI M55. Required for all projects using post-tensioning beginning with the April 2020 letting. Statewide Use.

2014 English Special Provisions by Item (Statewide & Districtwide, Current)
Specification Information
Search For a Special Provision or Specification