Construction and Materials Tips

 

Construction and Materials Tips

The Construction Division publishes construction and materials articles and advisories regularly and on an as-needed basis.

Bridge

Date Title Format
02/10 Determining Required Concrete Cylinder Size Determining Required Concrete Cylinder Size PDF
06/10 Fly Ash Supply (Condensed and Full-length) Fly Ash Supply (Condensed and Full-length) PDF
04/12 Fly Ash: Here Today? (Maybe), Gone Tomorrow? (Maybe) Fly Ash: Here Today? (Maybe), Gone Tomorrow? (Maybe) PDF
01/07 Guidelines for Handling Asbestos Guidelines for Handling Asbestos PDF
03/06 New Electronic Review of Shop Drawings New Electronic Review of Shop Drawings PDF
10/05 Saw-cutting Grooves on Bridge Decks Saw-cutting Grooves on Bridge Decks PDF

back to top

Contract Administration

Date Title Format
07/12 Bulletin Board Packet (may be used to check a contractor's project bulletin board) Bulletin Board Packet PDF
01/08 Contract Claim Procedure Amended Contract Claim Procedure Amended PDF
09/07 The Disputes and Claims Analysis Process The Disputes and Claims Analysis Process PDF
12/06 Guide to Contract Change Orders Guide to Contract Change Orders PDF
06/09 Guide to Contractor Overhead Guide to Contractor Overhead PDF
12/07 Guide to Labor Burden Guide to Labor Burden PDF
04/11 Item 585 - Ride Quality of Pavement Surfaces Item 585 - Ride Quality of Pavement Surfaces PDF
07/09 Project Schedule Development Guide Using Critical Path Method Project Schedule Development Guide Using Critical Path Method PDF
10/06 Subcontractor Prompt Payment Subcontractor Prompt Payment PDF
09/06 Water Sources for Construction Projects during Droughts Water Sources for Construction Projects during Droughts PDF

back to top

Asphalt & Chemical

Date Title Format
01/08 Epoxy Safety Epoxy Safety PDF
01/08 FAQ's for Performance Grade Binders FAQ's for Performance Grade Binders PDF
01/08 NRM and DMS-11000 NRM and DMS-11000 PDF
11/05 Opening Stuck Valves on Asphalt Piping Opening Stuck Valves on Asphalt Piping PDF
01/08 Premature Failure of Asphaltic Pavement Bordering Vehicle Wire Loop Premature Failure of Asphaltic Pavement Bordering Vehicle Wire Loop PDF

back to top

Flexible Pavements

Date Title Format
03/06 Blind Sampling Blind Sampling PDF
02/09 Crack Attenuating Mixtures and Rich Bottom Layer Mixtures Crack Attenuating Mixtures and Rich Bottom Layer Mixtures PDF
03/06 FAQs for Hot Mix Asphalt Mix Design FAQs for Hot Mix Asphalt Mix Design PDF
01/08 FAQs for Ride Specifications FAQs for Ride Specifications PDF
09/05 Flexible Pavement Design FAQs  Flexible Pavement Design FAQs PDF
08/06 Hamburg Wheel Test Hamburg Wheel Test PDF
01/08 Proper Use of Tack Coat Proper Use of Tack Coat PDF
08/06 Revised Guidelines on Minimum Roadway Placement Temperatures Revised Guidelines on Minimum Roadway Placement Temperatures PDF
05/08 Use of Tapered Longitudinal Joints Such As the Notched Wedge Joint Use of Tapered Longitudinal Joints Such As the Notched Wedge Joint PDF

back to top

Materials & Pavements Administration

Date Title Format
09/10 Using Ground-Coupled Radar Techniques to Detect Concealed Subsurface Voids Using Ground-Coupled Radar Techniques to Detect Concealed Subsurface Voids PDF
01/09 FAQs About Network-Level Falling Weight Deflectometer Data Collection FAQs About Network-Level Falling Weight Deflectometer Data Collection PDF
06/08 FAQs About the Falling Weight Deflectometer FAQs About the Falling Weight Deflectometer PDF
01/08 Guide Schedule for Sampling and Testing (2004) Guide Schedule for Sampling and Testing (2004) PDF
01/08 Quality Monitoring Programs and Material Producer List Quality Monitoring Programs and Material Producer List PDF

back to top

Rigid Pavements

Date Title Format
01/11 Calcium Aluminate Cement Concrete (Class CAC Concrete) Calcium Aluminate Cement Concrete (Class CAC Concrete) PDF
06/11 Calcium Aluminate Cement Concrete (Class CAC Concrete)
Important Items for Construction and Inspection
Calcium Aluminate Cement Concrete (Class CAC Concrete) Important Items for Construction and Inspection PDF
06/06 Concrete Curing (Condensed) Concrete Curing (Condensed) PDF
06/06 Concrete Curing (Full-length) Concrete Curing (Full-length) PDF
01/11 Fiber Reinforced Concrete (FRC) DMS-4550 Fiber Reinforced Concrete (FRC) DMS-4550 PDF
01/11 Fiber Reinforced Concrete (FRC) Important Items for Construction and Inspection Fiber Reinforced Concrete (FRC) Important Items for Construction and Inspection PDF
06/10 Fly Ash Supply (Condensed and Full-length) Fly Ash Supply (Condensed and Full-length) PDF
01/08 Hot Weather Concreting Hot Weather Concreting PDF
09/06 Precast Concrete Products Precast Concrete Products PDF
01/08 Sawing Concrete Pavement Sawing Concrete Pavement PDF

back to top

Geotechnical, Soils and Aggregates

Date Title Format
09/05 Guidelines for Modification and Stabilization of Soils and Base for Use in Pavement Structures Guidelines for Modification and Stabilization of Soils and Base for Use in Pavement Structures PDF
09/05 Guidelines for Treatment of Sulfate-Rich Soils and Bases in Pavement Structures Guidelines for Treatment of Sulfate-Rich Soils and Bases in Pavement Structures PDF
09/08 Recycled Concrete Aggregates Make Cents Recycled Concrete Aggregates Make Cents PDF
06/10 Best Practices for Sampling Flexible Base Best Practices for Sampling Flexible Base PDF
12/10 New Special Provision for Compost New Special Provision for Compost PDF

back to top

Traffic Materials & Coatings

Date Title Format
06/06 Concrete Curing (Condensed) Concrete Curing (Condensed) PDF
06/06 Concrete Curing (Full-length) Concrete Curing (Full-length) PDF
01/10 Field Testing of Concrete Curing Compound Field Testing of Concrete Curing Compound PDF
01/08 Sign Warranty Sign Warranty PDF

back to top

Traffic

Date Title Format
01/08 Enforcement of Electrical Certification Enforcement of Electrical Certification PDF
09/11 Update to Enforcement of Electrical Certification, Training and Videos Update to Enforcement of Electrical Certification, Training and Videos PDF

back to top

Other

Date Title Format
01/08 Critical Information Regarding Requests and Information Critical Information Regarding Requests and Information PDF
01/08 Source Document/Contract Records and SiteManager (SM) Source Document/Contract Records and SiteManager (SM) PDF

back to top

Questions/Comments

For newsletter publication information, contact the Construction Division at (512) 416-2367. For technical information, contact the person cited in the article.