|
Active Precertified Firms - Sorted by Firm Name
|
|
 |
|
Active Precertified Firm Page Links ( Updated May 20, 2012 at 9:00:05 P.M. )
|
|
Renewal Status |
JANUARY 19, 2012 ( ACTIVE )
|
| Firm Name |
STEGER & BIZZELL ENGINEERING, INC.
|
| Mailing Address |
1978 S. AUSTIN AVE
|
|
GEORGETOWN, TX 78626
|
| Firm Phone |
(512)930-9412
|
|
1.4.1
|
LAND PLANNING/ENGINEERING
|
|
1.5.1
|
FEASIBILITY STUDIES
|
|
2.5.1
|
WATER POLLUTION ABATEMENT PLAN
|
|
3.1.1
|
ROUTE STUDIES & SCHEMATIC DESIGN - MINOR ROADWAYS
|
|
3.2.1
|
ROUTE STUDIES & SCHEMATIC DESIGN - MAJOR ROADWAYS
|
|
3.4.1
|
MINOR BRIDGE LAYOUTS
|
|
3.5.1
|
MAJOR BRIDGE LAYOUTS
|
|
4.1.1
|
MINOR ROADWAY DESIGN
|
|
4.2.1
|
MAJOR ROADWAY DESIGN
|
|
8.1.1
|
SIGNING, PAVEMENT MARKING AND CHANNELIZATION
|
|
9.1.1
|
BICYCLE AND PEDESTRIAN FACILITY DEVELOPMENT
|
|
10.1.1
|
HYDROLOGIC STUDIES
|
|
10.2.1
|
BASIC HYDRAULIC DESIGN
|
|
10.3.1
|
COMPLEX HYDRAULIC DESIGN
|
|
15.1.1
|
SURVEY
|
|
15.1.2
|
PARCEL PLATS
|
|
15.1.3
|
LEGAL DESCRIPTIONS
|
|
15.1.4
|
RIGHT OF WAY MAPS
|
|
15.2.1
|
DESIGN AND CONSTRUCTION SURVEY
|
|
15.4.1
|
HORIZONTAL AND VERTICAL CONTROL FOR AERIAL MAPPING
|
|
Renewal Status |
MARCH 8, 2012 ( ACTIVE )
|
| Firm Name |
STL ENGINEERS & LABORATORIES
|
| Mailing Address |
P.O. BOX 211309
|
|
DALLAS, TX 75211
|
| Firm Phone |
(214)630-3800
|
|
1.1.1
|
POLICY PLANNING
|
|
1.2.1
|
SYSTEMS PLANNING
|
|
2.13.1
|
HAZARDOUS MATERIALS INITIAL SITE ASSESSMENT
|
|
3.1.1
|
ROUTE STUDIES & SCHEMATIC DESIGN - MINOR ROADWAYS
|
|
4.1.1
|
MINOR ROADWAY DESIGN
|
|
10.2.1
|
BASIC HYDRAULIC DESIGN
|
|
14.1.1
|
SOIL EXPLORATION
|
|
14.2.1
|
GEOTECHNICAL TESTING
|
|
14.3.1
|
TRANSPORTATION FOUNDATION STUDIES
|
|
14.4.1
|
BUILDING FOUNDATION STUDIES
|
|
Renewal Status |
APRIL 4, 2011 ( ACTIVE )
|
| Firm Name |
STONE CREEK ENGINEERING SERVICES, INC.
|
| Mailing Address |
2100 WALSH DRIVE
|
|
ROUND ROCK, TX 78681
|
| Firm Phone |
(512)335-1330
|
|
10.1.1
|
HYDROLOGIC STUDIES
|
|
10.2.1
|
BASIC HYDRAULIC DESIGN
|
|
10.3.1
|
COMPLEX HYDRAULIC DESIGN
|
|
Renewal Status |
JANUARY 25, 2012 ( ACTIVE )
|
| Firm Name |
STONE POINT SERVICES, LLC
|
| Mailing Address |
11827 COUNTY ROAD 41
|
|
TYLER, TX 75706
|
| Firm Phone |
(903)484-4041
|
|
2.10.1
|
ARCHEOLOGICAL SURVEYS
|
|
2.11.1
|
HISTORICAL AND ARCHIVAL RESEARCH
|
|
Renewal Status |
FEBRUARY 8, 2012 ( ACTIVE )
|
| Firm Name |
STONE STRUCTURAL ENGINEERING
|
| Mailing Address |
P. O. BOX 1567
|
|
BEEVILLE, TX 78104
|
| Firm Phone |
(512)633-4527
|
|
5.1.1
|
MINOR BRIDGE DESIGN
|
|
5.2.1
|
MAJOR BRIDGE DESIGN
|
|
5.3.1
|
MULTI-LEVEL INTERCHANGE DESIGN
|
|
6.1.1
|
ROUTINE BRIDGE INSPECTION
|
|
6.2.1
|
COMPLEX BRIDGE INSPECTION
|
|
Renewal Status |
JANUARY 24, 2012 ( ACTIVE )
|
| Firm Name |
STRUCTURAL DIAGNOSTICS, INC.
|
| Mailing Address |
1822 DALY DR.
|
|
CORPUS CHRISTI, TX 78412
|
| Firm Phone |
(361)877-3897
|
|
6.1.1
|
ROUTINE BRIDGE INSPECTION
|
|
Renewal Status |
FEBRUARY 6, 2012 ( ACTIVE )
|
| Firm Name |
STRUCTURAL ENGINEERING ASSOCIATES, INC.
|
| Mailing Address |
3838 N.W. LOOP 410
|
|
SAN ANTONIO, TX 78229
|
| Firm Phone |
(210)735-9202
|
|
|
 |
|
1.5.1
|
FEASIBILITY STUDIES
|
|
2.4.2
|
INDIVIDUAL PERMITS
|
|
3.1.1
|
ROUTE STUDIES & SCHEMATIC DESIGN - MINOR ROADWAYS
|
|
3.2.1
|
ROUTE STUDIES & SCHEMATIC DESIGN - MAJOR ROADWAYS
|
|
3.3.1
|
ROUTE STUDIES & SCHEMATIC DESIGN - COMPLEX HIGHWAYS
|
|
3.4.1
|
MINOR BRIDGE LAYOUTS
|
|
3.5.1
|
MAJOR BRIDGE LAYOUTS
|
|
3.6.1
|
MULTI-LEVEL INTERCHANGE AND EXOTIC BRIDGE LAYOUT
|
|
4.1.1
|
MINOR ROADWAY DESIGN
|
|
4.3.1
|
COMPLEX HIGHWAY DESIGN
|
|
5.1.1
|
MINOR BRIDGE DESIGN
|
|
5.2.1
|
MAJOR BRIDGE DESIGN
|
|
5.2.1
|
MAJOR BRIDGE DESIGN
|
|
5.2.1
|
MAJOR BRIDGE DESIGN
|
|
5.3.1
|
MULTI-LEVEL INTERCHANGE DESIGN
|
|
6.1.1
|
ROUTINE BRIDGE INSPECTION
|
|
10.1.1
|
HYDROLOGIC STUDIES
|
|
10.2.1
|
BASIC HYDRAULIC DESIGN
|
|
10.5.1
|
BRIDGE SCOUR EVALUATIONS AND ANALYSIS
|
|
11.1.1
|
ROADWAY CONSTRUCTION MANAGEMENT AND INSPECTION
|
|
11.2.1
|
MAJOR BRIDGE CONSTRUCTION MANAGEMENT AND INSPECTION
|
|
12.2.1
|
PLANT INSPECTION AND TESTING
|
|
14.1.1
|
SOIL EXPLORATION
|
|
14.2.1
|
GEOTECHNICAL TESTING
|
|
14.3.1
|
TRANSPORTATION FOUNDATION STUDIES
|
|
14.4.1
|
BUILDING FOUNDATION STUDIES
|
|
Renewal Status |
FEBRUARY 1, 2012 ( ACTIVE )
|
| Firm Name |
STV INCORPORATED
|
| Mailing Address |
7557 RAMBLER ROAD, SUITE 1050
|
|
DALLAS, TX 75231-2305
|
| Firm Phone |
(214)221-4477
|
|
|
 |
|
1.1.1
|
POLICY PLANNING
|
|
1.2.1
|
SYSTEMS PLANNING
|
|
1.3.1
|
SUBAREA/CORRIDOR PLANNING
|
|
1.4.1
|
LAND PLANNING/ENGINEERING
|
|
1.5.1
|
FEASIBILITY STUDIES
|
|
1.6.1
|
MAJOR INVESTMENT STUDIES
|
|
2.5.1
|
WATER POLLUTION ABATEMENT PLAN
|
|
3.1.1
|
ROUTE STUDIES & SCHEMATIC DESIGN - MINOR ROADWAYS
|
|
3.2.1
|
ROUTE STUDIES & SCHEMATIC DESIGN - MAJOR ROADWAYS
|
|
3.3.1
|
ROUTE STUDIES & SCHEMATIC DESIGN - COMPLEX HIGHWAYS
|
|
3.4.1
|
MINOR BRIDGE LAYOUTS
|
|
3.5.1
|
MAJOR BRIDGE LAYOUTS
|
|
3.6.1
|
MULTI-LEVEL INTERCHANGE AND EXOTIC BRIDGE LAYOUT
|
|
4.1.1
|
MINOR ROADWAY DESIGN
|
|
4.2.1
|
MAJOR ROADWAY DESIGN
|
|
4.3.1
|
COMPLEX HIGHWAY DESIGN
|
|
4.4.1
|
MAJOR FREEWAY INTERCHANGES AND DIRECT CONNECTORS
|
|
5.1.1
|
MINOR BRIDGE DESIGN
|
|
5.2.1
|
MAJOR BRIDGE DESIGN
|
|
5.3.1
|
MULTI-LEVEL INTERCHANGE DESIGN
|
|
5.4.1
|
EXOTIC BRIDGE DESIGN
|
|
6.1.1
|
ROUTINE BRIDGE INSPECTION
|
|
7.1.1
|
TRAFFIC ENGINEERING STUDIES
|
|
8.1.1
|
SIGNING, PAVEMENT MARKING AND CHANNELIZATION
|
|
8.3.1
|
SIGNALIZATION
|
|
8.5.1
|
HIGHWAY-RAIL GRADE CROSSINGS
|
|
9.1.1
|
BICYCLE AND PEDESTRIAN FACILITY DEVELOPMENT
|
|
10.1.1
|
HYDROLOGIC STUDIES
|
|
10.2.1
|
BASIC HYDRAULIC DESIGN
|
|
10.3.1
|
COMPLEX HYDRAULIC DESIGN
|
|
10.5.1
|
BRIDGE SCOUR EVALUATIONS AND ANALYSIS
|
|
11.1.1
|
ROADWAY CONSTRUCTION MANAGEMENT AND INSPECTION
|
|
11.2.1
|
MAJOR BRIDGE CONSTRUCTION MANAGEMENT AND INSPECTION
|
|
12.1.1
|
ASPHALTIC CONCRETE
|
|
12.1.2
|
PORTLAND CEMENT CONCRETE
|
|
12.2.1
|
PLANT INSPECTION AND TESTING
|
|
14.1.1
|
SOIL EXPLORATION
|
|
14.2.1
|
GEOTECHNICAL TESTING
|
|
14.3.1
|
TRANSPORTATION FOUNDATION STUDIES
|
|
Renewal Status |
FEBRUARY 28, 2012 ( ACTIVE )
|
| Firm Name |
SUMMIT ENGINEERING GROUP, INC.
|
| Mailing Address |
10822 W. TOLLER DRIVE, SUITE 330
|
|
LITTLETON, CO 80127
|
| Firm Phone |
(303)933-9114
|
|
3.4.1
|
MINOR BRIDGE LAYOUTS
|
|
3.5.1
|
MAJOR BRIDGE LAYOUTS
|
|
3.6.1
|
MULTI-LEVEL INTERCHANGE AND EXOTIC BRIDGE LAYOUT
|
|
5.1.1
|
MINOR BRIDGE DESIGN
|
|
5.2.1
|
MAJOR BRIDGE DESIGN
|
|
5.3.1
|
MULTI-LEVEL INTERCHANGE DESIGN
|
|
5.4.1
|
EXOTIC BRIDGE DESIGN
|
|
11.2.1
|
MAJOR BRIDGE CONSTRUCTION MANAGEMENT AND INSPECTION
|
|
Renewal Status |
FEBRUARY 2, 2012 ( ACTIVE )
|
| Firm Name |
SUMMIT SURVEYING, INC.
|
| Mailing Address |
2040 DEERBROOK DRIVE
|
|
TYLER, TX 75703
|
| Firm Phone |
(903)561-9544
|
|
15.1.1
|
SURVEY
|
|
15.1.2
|
PARCEL PLATS
|
|
15.1.3
|
LEGAL DESCRIPTIONS
|
|
15.1.4
|
RIGHT OF WAY MAPS
|
|
15.2.1
|
DESIGN AND CONSTRUCTION SURVEY
|
|
15.4.1
|
HORIZONTAL AND VERTICAL CONTROL FOR AERIAL MAPPING
|
|
Renewal Status |
APRIL 5, 2012 ( ACTIVE )
|
| Firm Name |
SUNBELT LABORATORIES, INC.
|
| Mailing Address |
1410 GAIL BORDEN PLACE, SUITE C-5
|
|
EL PASO, TX 79935
|
| Firm Phone |
(915)591-4647
|
|
2.13.1
|
HAZARDOUS MATERIALS INITIAL SITE ASSESSMENT
|
|
Renewal Status |
MARCH 22, 2012 ( ACTIVE )
|
| Firm Name |
SUNLAND GROUP, INC.
|
| Mailing Address |
1033 LA POSADA, SUITE 370
|
|
AUSTIN, TX 78752
|
| Firm Phone |
(512)590-7951
|
|
1.4.1
|
LAND PLANNING/ENGINEERING
|
|
2.5.1
|
WATER POLLUTION ABATEMENT PLAN
|
|
3.1.1
|
ROUTE STUDIES & SCHEMATIC DESIGN - MINOR ROADWAYS
|
|
3.2.1
|
ROUTE STUDIES & SCHEMATIC DESIGN - MAJOR ROADWAYS
|
|
4.1.1
|
MINOR ROADWAY DESIGN
|
|
4.2.1
|
MAJOR ROADWAY DESIGN
|
|
4.3.1
|
COMPLEX HIGHWAY DESIGN
|
|
8.1.1
|
SIGNING, PAVEMENT MARKING AND CHANNELIZATION
|
|
9.1.1
|
BICYCLE AND PEDESTRIAN FACILITY DEVELOPMENT
|
|
10.1.1
|
HYDROLOGIC STUDIES
|
|
10.2.1
|
BASIC HYDRAULIC DESIGN
|
|
10.3.1
|
COMPLEX HYDRAULIC DESIGN
|
|
11.1.1
|
ROADWAY CONSTRUCTION MANAGEMENT AND INSPECTION
|
|
11.2.1
|
MAJOR BRIDGE CONSTRUCTION MANAGEMENT AND INSPECTION
|
|
16.1.1
|
ARCHITECTURE - BUILDINGS AND OTHER STRUCTURES.
|
|
Renewal Status |
JANUARY 24, 2012 ( ACTIVE )
|
| Firm Name |
SURDEX CORPORATION
|
| Mailing Address |
520 SPIRIT OF ST. LOUIS BLVD.
|
|
CHESTERFIELD, MO 63005
|
| Firm Phone |
(281)232-4749
|
|
Renewal Status |
JANUARY 19, 2012 ( ACTIVE )
|
| Firm Name |
SURVEYING AND MAPPING, INC.
|
| Mailing Address |
4801 SOUTHWEST PARKWAY, PARKWAY TWO, SUITE 100
|
|
AUSTIN, TX 78735
|
| Firm Phone |
(512)447-0575
|
|
3.1.1
|
ROUTE STUDIES & SCHEMATIC DESIGN - MINOR ROADWAYS
|
|
3.2.1
|
ROUTE STUDIES & SCHEMATIC DESIGN - MAJOR ROADWAYS
|
|
3.4.1
|
MINOR BRIDGE LAYOUTS
|
|
3.5.1
|
MAJOR BRIDGE LAYOUTS
|
|
4.1.1
|
MINOR ROADWAY DESIGN
|
|
4.2.1
|
MAJOR ROADWAY DESIGN
|
|
8.1.1
|
SIGNING, PAVEMENT MARKING AND CHANNELIZATION
|
|
10.1.1
|
HYDROLOGIC STUDIES
|
|
10.2.1
|
BASIC HYDRAULIC DESIGN
|
|
11.1.1
|
ROADWAY CONSTRUCTION MANAGEMENT AND INSPECTION
|
|
15.1.1
|
SURVEY
|
|
15.1.2
|
PARCEL PLATS
|
|
15.1.3
|
LEGAL DESCRIPTIONS
|
|
15.1.4
|
RIGHT OF WAY MAPS
|
|
15.2.1
|
DESIGN AND CONSTRUCTION SURVEY
|
|
15.3.1
|
AERIAL MAPPING
|
|
15.4.1
|
HORIZONTAL AND VERTICAL CONTROL FOR AERIAL MAPPING
|
|
15.5.1
|
STATE LAND SURVEYING
|
|
18.2.1
|
SUBSURFACE UTILITY ENGINEERING
|
|
Renewal Status |
FEBRUARY 3, 2012 ( ACTIVE )
|
| Firm Name |
SURVTEX, LLC
|
| Mailing Address |
600 W. WHITESTONE BLVD.
|
|
CEDAR PARK, TX 78613
|
| Firm Phone |
(512)249-8875
|
|
15.1.1
|
SURVEY
|
|
15.1.2
|
PARCEL PLATS
|
|
15.1.3
|
LEGAL DESCRIPTIONS
|
|
15.1.4
|
RIGHT OF WAY MAPS
|
|
15.2.1
|
DESIGN AND CONSTRUCTION SURVEY
|
|
15.4.1
|
HORIZONTAL AND VERTICAL CONTROL FOR AERIAL MAPPING
|
|
Renewal Status |
MARCH 6, 2012 ( ACTIVE )
|
| Firm Name |
SWCA, INC.
|
| Mailing Address |
3033 N. CENTRAL AVE., STE 145
|
|
PHOENIX, AZ 85012
|
| Firm Phone |
(602)274-3831
|
|
1.6.1
|
MAJOR INVESTMENT STUDIES
|
|
2.1.1
|
TRAFFIC NOISE ANALYSIS
|
|
2.3.1
|
WETLAND DELINEATION
|
|
2.4.1
|
NATIONWIDE PERMIT
|
|
2.4.2
|
INDIVIDUAL PERMITS
|
|
2.4.3
|
COAST GUARD & U.S. ARMY CORP OF ENGINEER PERMITS
|
|
2.5.1
|
WATER POLLUTION ABATEMENT PLAN
|
|
2.6.1
|
PROTECTED SPECIES DETERMINATION (HABITAT)
|
|
2.6.2
|
IMPACT EVALUATION ASSESSMENTS
|
|
2.6.3
|
BIOLOGICAL SURVEYS
|
|
2.7.1
|
SEC. 4(F)\6(F) EVALUATIONS
|
|
2.8.1
|
SURVEYS, RES. & DOC. OF HISTORIC BUILD, STRUCT. AND OBJECTS
|
|
2.10.1
|
ARCHEOLOGICAL SURVEYS
|
|
2.11.1
|
HISTORICAL AND ARCHIVAL RESEARCH
|
|
2.13.1
|
HAZARDOUS MATERIALS INITIAL SITE ASSESSMENT
|
|
2.14.1
|
ENVIRONMENTAL DOCUMENT PREPARATION
|
|
Renewal Status |
FEBRUARY 8, 2012 ( ACTIVE )
|
| Firm Name |
SWL GROUP, INC.
|
| Mailing Address |
2522 TEXAS AVE
|
|
TEXAS CITY, TX 77590
|
| Firm Phone |
(409)948-8494
|
|
12.2.1
|
PLANT INSPECTION AND TESTING
|
|
Renewal Status |
MARCH 21, 2011 ( ACTIVE )
|
| Firm Name |
SYSTRA CONSULTING, INC.
|
| Mailing Address |
150 CLOVE ROAD, 7TH FLOOR
|
|
LITTLE FALLS, NJ 07424
|
| Firm Phone |
(973)873-9715
|
|
1.3.1
|
SUBAREA/CORRIDOR PLANNING
|
|
1.5.1
|
FEASIBILITY STUDIES
|
|
1.6.1
|
MAJOR INVESTMENT STUDIES
|
|
7.2.1
|
HIGHWAY-RAIL GRADE CROSSING STUDIES
|
|
8.5.1
|
HIGHWAY-RAIL GRADE CROSSINGS
|
|
Renewal Status |
APRIL 19, 2011 ( ACTIVE )
|
| Firm Name |
T C BAILEY ENGINEERING, INC.
|
| Mailing Address |
503 OAKWOOD
|
|
SAN ANTONIO, TX 78228
|
| Firm Phone |
(210)432-5131
|
|
3.1.1
|
ROUTE STUDIES & SCHEMATIC DESIGN - MINOR ROADWAYS
|
|
3.2.1
|
ROUTE STUDIES & SCHEMATIC DESIGN - MAJOR ROADWAYS
|
|
3.3.1
|
ROUTE STUDIES & SCHEMATIC DESIGN - COMPLEX HIGHWAYS
|
|
4.1.1
|
MINOR ROADWAY DESIGN
|
|
4.2.1
|
MAJOR ROADWAY DESIGN
|
|
4.3.1
|
COMPLEX HIGHWAY DESIGN
|
|
8.1.1
|
SIGNING, PAVEMENT MARKING AND CHANNELIZATION
|
|
9.1.1
|
BICYCLE AND PEDESTRIAN FACILITY DEVELOPMENT
|
|
10.1.1
|
HYDROLOGIC STUDIES
|
|
10.2.1
|
BASIC HYDRAULIC DESIGN
|
|
10.3.1
|
COMPLEX HYDRAULIC DESIGN
|
|
10.5.1
|
BRIDGE SCOUR EVALUATIONS AND ANALYSIS
|
|
11.1.1
|
ROADWAY CONSTRUCTION MANAGEMENT AND INSPECTION
|
|
Renewal Status |
MARCH 25, 2011 ( ACTIVE )
|
| Firm Name |
T.Y. LIN INTERNATIONAL
|
| Mailing Address |
2 HARRISON STREET, SUITE 500
|
|
SAN FRANCISCO, CA 94105
|
| Firm Phone |
(415)291-3764
|
|
|
 |
|
1.3.1
|
SUBAREA/CORRIDOR PLANNING
|
|
1.4.1
|
LAND PLANNING/ENGINEERING
|
|
3.1.1
|
ROUTE STUDIES & SCHEMATIC DESIGN - MINOR ROADWAYS
|
|
3.2.1
|
ROUTE STUDIES & SCHEMATIC DESIGN - MAJOR ROADWAYS
|
|
3.3.1
|
ROUTE STUDIES & SCHEMATIC DESIGN - COMPLEX HIGHWAYS
|
|
3.4.1
|
MINOR BRIDGE LAYOUTS
|
|
3.5.1
|
MAJOR BRIDGE LAYOUTS
|
|
3.6.1
|
MULTI-LEVEL INTERCHANGE AND EXOTIC BRIDGE LAYOUT
|
|
4.1.1
|
MINOR ROADWAY DESIGN
|
|
4.2.1
|
MAJOR ROADWAY DESIGN
|
|
4.3.1
|
COMPLEX HIGHWAY DESIGN
|
|
4.4.1
|
MAJOR FREEWAY INTERCHANGES AND DIRECT CONNECTORS
|
|
5.1.1
|
MINOR BRIDGE DESIGN
|
|
5.2.1
|
MAJOR BRIDGE DESIGN
|
|
5.3.1
|
MULTI-LEVEL INTERCHANGE DESIGN
|
|
5.4.1
|
EXOTIC BRIDGE DESIGN
|
|
6.1.1
|
ROUTINE BRIDGE INSPECTION
|
|
6.2.1
|
COMPLEX BRIDGE INSPECTION
|
|
7.1.1
|
TRAFFIC ENGINEERING STUDIES
|
|
7.2.1
|
HIGHWAY-RAIL GRADE CROSSING STUDIES
|
|
7.3.1
|
TRAFFIC SIGNAL TIMING
|
|
7.4.1
|
TRAFFIC CONTROL SYSTEMS ANALYSIS, DESIGN AND IMPLEMENTATION
|
|
8.1.1
|
SIGNING, PAVEMENT MARKING AND CHANNELIZATION
|
|
8.3.1
|
SIGNALIZATION
|
|
8.5.1
|
HIGHWAY-RAIL GRADE CROSSINGS
|
|
9.1.1
|
BICYCLE AND PEDESTRIAN FACILITY DEVELOPMENT
|
|
10.1.1
|
HYDROLOGIC STUDIES
|
|
10.2.1
|
BASIC HYDRAULIC DESIGN
|
|
10.3.1
|
COMPLEX HYDRAULIC DESIGN
|
|
10.5.1
|
BRIDGE SCOUR EVALUATIONS AND ANALYSIS
|
|
11.1.1
|
ROADWAY CONSTRUCTION MANAGEMENT AND INSPECTION
|
|
11.2.1
|
MAJOR BRIDGE CONSTRUCTION MANAGEMENT AND INSPECTION
|
|
Renewal Status |
FEBRUARY 21, 2012 ( ACTIVE )
|
| Firm Name |
TALON DRILLING, LP DBA LLANO-PERMIAN
|
| Mailing Address |
921 N. BIVINS
|
|
AMARILLO, TX 79107
|
| Firm Phone |
(806)467-0607
|
|
2.6.3
|
BIOLOGICAL SURVEYS
|
|
2.13.1
|
HAZARDOUS MATERIALS INITIAL SITE ASSESSMENT
|
|
Renewal Status |
MAY 14, 2012 ( ACTIVE )
|
| Firm Name |
TAPANAM ASSOCIATES, INC.
|
| Mailing Address |
201 WEST 135TH STREET
|
|
KANSAS CITY, MO 64145
|
| Firm Phone |
(816)595-7121
|
|
3.4.1
|
MINOR BRIDGE LAYOUTS
|
|
5.1.1
|
MINOR BRIDGE DESIGN
|
|
Renewal Status |
JANUARY 20, 2012 ( ACTIVE )
|
| Firm Name |
TARGET ENGINEERING GROUP, INC.
|
| Mailing Address |
8095 NW 12TH STREET, SUITE 105
|
|
MIAMI, FL 33126-1843
|
| Firm Phone |
(305)436-8877
|
|
11.1.1
|
ROADWAY CONSTRUCTION MANAGEMENT AND INSPECTION
|
|
11.2.1
|
MAJOR BRIDGE CONSTRUCTION MANAGEMENT AND INSPECTION
|
|
Renewal Status |
JANUARY 26, 2012 ( ACTIVE )
|
| Firm Name |
TBE GROUP, INC. DBA CARDNO TBE
|
| Mailing Address |
2914 W. STORY ROAD
|
|
IRVING, TX 75038
|
| Firm Phone |
(972)682-5432
|
|
2.13.1
|
HAZARDOUS MATERIALS INITIAL SITE ASSESSMENT
|
|
3.1.1
|
ROUTE STUDIES & SCHEMATIC DESIGN - MINOR ROADWAYS
|
|
3.2.1
|
ROUTE STUDIES & SCHEMATIC DESIGN - MAJOR ROADWAYS
|
|
3.3.1
|
ROUTE STUDIES & SCHEMATIC DESIGN - COMPLEX HIGHWAYS
|
|
4.1.1
|
MINOR ROADWAY DESIGN
|
|
4.2.1
|
MAJOR ROADWAY DESIGN
|
|
4.3.1
|
COMPLEX HIGHWAY DESIGN
|
|
9.1.1
|
BICYCLE AND PEDESTRIAN FACILITY DEVELOPMENT
|
|
11.1.1
|
ROADWAY CONSTRUCTION MANAGEMENT AND INSPECTION
|
|
11.2.1
|
MAJOR BRIDGE CONSTRUCTION MANAGEMENT AND INSPECTION
|
|
18.2.1
|
SUBSURFACE UTILITY ENGINEERING
|
|
Renewal Status |
MARCH 29, 2012 ( ACTIVE )
|
| Firm Name |
TBG PARTNERS
|
| Mailing Address |
901 SOUTH MOPAC, BUILDING 2, SUITE 350
|
|
AUSTIN, TX 78746
|
| Firm Phone |
(512)327-1011
|
|
1.4.1
|
LAND PLANNING/ENGINEERING
|
|
Renewal Status |
JANUARY 4, 2012 ( ACTIVE )
|
| Firm Name |
TEAGUE NALL AND PERKINS, INC.
|
| Mailing Address |
1100 MACON STREET
|
|
FORT WORTH, TX 76102
|
| Firm Phone |
(817)336-5773
|
|
|
 |
|
1.1.1
|
POLICY PLANNING
|
|
1.2.1
|
SYSTEMS PLANNING
|
|
1.3.1
|
SUBAREA/CORRIDOR PLANNING
|
|
1.4.1
|
LAND PLANNING/ENGINEERING
|
|
1.5.1
|
FEASIBILITY STUDIES
|
|
1.6.1
|
MAJOR INVESTMENT STUDIES
|
|
2.4.1
|
NATIONWIDE PERMIT
|
|
3.1.1
|
ROUTE STUDIES & SCHEMATIC DESIGN - MINOR ROADWAYS
|
|
3.2.1
|
ROUTE STUDIES & SCHEMATIC DESIGN - MAJOR ROADWAYS
|
|
3.3.1
|
ROUTE STUDIES & SCHEMATIC DESIGN - COMPLEX HIGHWAYS
|
|
3.4.1
|
MINOR BRIDGE LAYOUTS
|
|
3.5.1
|
MAJOR BRIDGE LAYOUTS
|
|
4.1.1
|
MINOR ROADWAY DESIGN
|
|
4.2.1
|
MAJOR ROADWAY DESIGN
|
|
4.3.1
|
COMPLEX HIGHWAY DESIGN
|
|
4.4.1
|
MAJOR FREEWAY INTERCHANGES AND DIRECT CONNECTORS
|
|
5.1.1
|
MINOR BRIDGE DESIGN
|
|
5.2.1
|
MAJOR BRIDGE DESIGN
|
|
7.1.1
|
TRAFFIC ENGINEERING STUDIES
|
|
7.2.1
|
HIGHWAY-RAIL GRADE CROSSING STUDIES
|
|
7.3.1
|
TRAFFIC SIGNAL TIMING
|
|
7.5.1
|
INTELLIGENT TRANSPORTATION SYSTEMS
|
|
8.1.1
|
SIGNING, PAVEMENT MARKING AND CHANNELIZATION
|
|
8.3.1
|
SIGNALIZATION
|
|
8.5.1
|
HIGHWAY-RAIL GRADE CROSSINGS
|
|
9.1.1
|
BICYCLE AND PEDESTRIAN FACILITY DEVELOPMENT
|
|
10.1.1
|
HYDROLOGIC STUDIES
|
|
10.2.1
|
BASIC HYDRAULIC DESIGN
|
|
10.3.1
|
COMPLEX HYDRAULIC DESIGN
|
|
10.5.1
|
BRIDGE SCOUR EVALUATIONS AND ANALYSIS
|
|
11.1.1
|
ROADWAY CONSTRUCTION MANAGEMENT AND INSPECTION
|
|
11.2.1
|
MAJOR BRIDGE CONSTRUCTION MANAGEMENT AND INSPECTION
|
|
14.1.1
|
SOIL EXPLORATION
|
|
14.2.1
|
GEOTECHNICAL TESTING
|
|
14.3.1
|
TRANSPORTATION FOUNDATION STUDIES
|
|
15.1.1
|
SURVEY
|
|
15.1.2
|
PARCEL PLATS
|
|
15.1.3
|
LEGAL DESCRIPTIONS
|
|
15.1.4
|
RIGHT OF WAY MAPS
|
|
15.2.1
|
DESIGN AND CONSTRUCTION SURVEY
|
|
15.4.1
|
HORIZONTAL AND VERTICAL CONTROL FOR AERIAL MAPPING
|
|
18.2.1
|
SUBSURFACE UTILITY ENGINEERING
|
|
Renewal Status |
MARCH 9, 2012 ( ACTIVE )
|
| Firm Name |
TEAL ENGINEERING SERVICES, INC.
|
| Mailing Address |
4874 E LONE OAK ROAD
|
|
VALLEY VIEW, TX 76272
|
| Firm Phone |
(940)637-2364
|
|
1.3.1
|
SUBAREA/CORRIDOR PLANNING
|
|
1.5.1
|
FEASIBILITY STUDIES
|
|
7.1.1
|
TRAFFIC ENGINEERING STUDIES
|
|
7.3.1
|
TRAFFIC SIGNAL TIMING
|
|
7.4.1
|
TRAFFIC CONTROL SYSTEMS ANALYSIS, DESIGN AND IMPLEMENTATION
|
|
7.5.1
|
INTELLIGENT TRANSPORTATION SYSTEMS
|
|
8.3.1
|
SIGNALIZATION
|
|
8.4.1
|
ITS CONTROL SYSTEMS ANALYSIS, DESIGN & IMPLEMENTATION
|
|
Renewal Status |
JANUARY 18, 2012 ( ACTIVE )
|
| Firm Name |
TEAM CONSULTANTS INC.
|
| Mailing Address |
2970 SOUTH WALTON WALKER
|
|
DALLAS, TX 75211
|
| Firm Phone |
(214)331-4395
|
|
2.13.1
|
HAZARDOUS MATERIALS INITIAL SITE ASSESSMENT
|
|
12.1.1
|
ASPHALTIC CONCRETE
|
|
12.1.2
|
PORTLAND CEMENT CONCRETE
|
|
12.2.1
|
PLANT INSPECTION AND TESTING
|
|
14.1.1
|
SOIL EXPLORATION
|
|
14.2.1
|
GEOTECHNICAL TESTING
|
|
14.3.1
|
TRANSPORTATION FOUNDATION STUDIES
|
|
14.4.1
|
BUILDING FOUNDATION STUDIES
|
|
Renewal Status |
FEBRUARY 2, 2012 ( ACTIVE )
|
| Firm Name |
TEAM, INTEGRATED ENGINEERING, LLC
|
| Mailing Address |
10715 GULFDALE, SUITE 100
|
|
SAN ANTONIO, TX 78216
|
| Firm Phone |
(210)341-4316
|
|
2.13.1
|
HAZARDOUS MATERIALS INITIAL SITE ASSESSMENT
|
|
2.14.1
|
ENVIRONMENTAL DOCUMENT PREPARATION
|
|
Renewal Status |
JANUARY 9, 2012 ( ACTIVE )
|
| Firm Name |
TEDSI INFRASTRUCTURE GROUP, INC.
|
| Mailing Address |
10260 WESTHEIMER, SUITE 460
|
|
HOUSTON, TX 77042
|
| Firm Phone |
(713)975-8337
|
|
|
 |
|
1.2.1
|
SYSTEMS PLANNING
|
|
1.3.1
|
SUBAREA/CORRIDOR PLANNING
|
|
1.4.1
|
LAND PLANNING/ENGINEERING
|
|
1.5.1
|
FEASIBILITY STUDIES
|
|
2.14.1
|
ENVIRONMENTAL DOCUMENT PREPARATION
|
|
3.1.1
|
ROUTE STUDIES & SCHEMATIC DESIGN - MINOR ROADWAYS
|
|
3.2.1
|
ROUTE STUDIES & SCHEMATIC DESIGN - MAJOR ROADWAYS
|
|
3.3.1
|
ROUTE STUDIES & SCHEMATIC DESIGN - COMPLEX HIGHWAYS
|
|
3.4.1
|
MINOR BRIDGE LAYOUTS
|
|
3.5.1
|
MAJOR BRIDGE LAYOUTS
|
|
3.6.1
|
MULTI-LEVEL INTERCHANGE AND EXOTIC BRIDGE LAYOUT
|
|
4.1.1
|
MINOR ROADWAY DESIGN
|
|
4.2.1
|
MAJOR ROADWAY DESIGN
|
|
4.3.1
|
COMPLEX HIGHWAY DESIGN
|
|
4.4.1
|
MAJOR FREEWAY INTERCHANGES AND DIRECT CONNECTORS
|
|
5.1.1
|
MINOR BRIDGE DESIGN
|
|
6.1.1
|
ROUTINE BRIDGE INSPECTION
|
|
7.1.1
|
TRAFFIC ENGINEERING STUDIES
|
|
7.2.1
|
HIGHWAY-RAIL GRADE CROSSING STUDIES
|
|
7.3.1
|
TRAFFIC SIGNAL TIMING
|
|
7.4.1
|
TRAFFIC CONTROL SYSTEMS ANALYSIS, DESIGN AND IMPLEMENTATION
|
|
7.5.1
|
INTELLIGENT TRANSPORTATION SYSTEMS
|
|
8.1.1
|
SIGNING, PAVEMENT MARKING AND CHANNELIZATION
|
|
8.2.1
|
ILLUMINATION
|
|
8.3.1
|
SIGNALIZATION
|
|
8.4.1
|
ITS CONTROL SYSTEMS ANALYSIS, DESIGN & IMPLEMENTATION
|
|
8.5.1
|
HIGHWAY-RAIL GRADE CROSSINGS
|
|
9.1.1
|
BICYCLE AND PEDESTRIAN FACILITY DEVELOPMENT
|
|
10.1.1
|
HYDROLOGIC STUDIES
|
|
10.2.1
|
BASIC HYDRAULIC DESIGN
|
|
10.3.1
|
COMPLEX HYDRAULIC DESIGN
|
|
11.1.1
|
ROADWAY CONSTRUCTION MANAGEMENT AND INSPECTION
|
|
11.2.1
|
MAJOR BRIDGE CONSTRUCTION MANAGEMENT AND INSPECTION
|
|
15.1.1
|
SURVEY
|
|
15.1.2
|
PARCEL PLATS
|
|
15.1.3
|
LEGAL DESCRIPTIONS
|
|
15.1.4
|
RIGHT OF WAY MAPS
|
|
15.2.1
|
DESIGN AND CONSTRUCTION SURVEY
|
|
15.4.1
|
HORIZONTAL AND VERTICAL CONTROL FOR AERIAL MAPPING
|
|
Renewal Status |
MARCH 1, 2012 ( ACTIVE )
|
| Firm Name |
TEI CONSTRUCTION & ENGINEERING, INC.
|
| Mailing Address |
1825 MARKET CENTER BOULEVARD, SUITE 600
|
|
DALLAS, TX 75207
|
| Firm Phone |
(214)760-1966
|
|
|
 |
|
1.3.1
|
SUBAREA/CORRIDOR PLANNING
|
|
1.4.1
|
LAND PLANNING/ENGINEERING
|
|
1.5.1
|
FEASIBILITY STUDIES
|
|
2.13.1
|
HAZARDOUS MATERIALS INITIAL SITE ASSESSMENT
|
|
3.1.1
|
ROUTE STUDIES & SCHEMATIC DESIGN - MINOR ROADWAYS
|
|
3.2.1
|
ROUTE STUDIES & SCHEMATIC DESIGN - MAJOR ROADWAYS
|
|
3.3.1
|
ROUTE STUDIES & SCHEMATIC DESIGN - COMPLEX HIGHWAYS
|
|
3.4.1
|
MINOR BRIDGE LAYOUTS
|
|
3.6.1
|
MULTI-LEVEL INTERCHANGE AND EXOTIC BRIDGE LAYOUT
|
|
4.1.1
|
MINOR ROADWAY DESIGN
|
|
4.2.1
|
MAJOR ROADWAY DESIGN
|
|
4.3.1
|
COMPLEX HIGHWAY DESIGN
|
|
4.4.1
|
MAJOR FREEWAY INTERCHANGES AND DIRECT CONNECTORS
|
|
7.1.1
|
TRAFFIC ENGINEERING STUDIES
|
|
7.3.1
|
TRAFFIC SIGNAL TIMING
|
|
7.4.1
|
TRAFFIC CONTROL SYSTEMS ANALYSIS, DESIGN AND IMPLEMENTATION
|
|
8.1.1
|
SIGNING, PAVEMENT MARKING AND CHANNELIZATION
|
|
8.3.1
|
SIGNALIZATION
|
|
9.1.1
|
BICYCLE AND PEDESTRIAN FACILITY DEVELOPMENT
|
|
10.1.1
|
HYDROLOGIC STUDIES
|
|
10.2.1
|
BASIC HYDRAULIC DESIGN
|
|
11.1.1
|
ROADWAY CONSTRUCTION MANAGEMENT AND INSPECTION
|
|
Renewal Status |
JANUARY 21, 2012 ( ACTIVE )
|
| Firm Name |
TEJAS SURVEYING, INC.
|
| Mailing Address |
12615 W AIRPORT BLVD., SUITE 400
|
|
SUGAR LAND, TX 77498
|
| Firm Phone |
(281)240-9099
|
|
15.1.1
|
SURVEY
|
|
15.1.2
|
PARCEL PLATS
|
|
15.1.3
|
LEGAL DESCRIPTIONS
|
|
15.1.4
|
RIGHT OF WAY MAPS
|
|
15.2.1
|
DESIGN AND CONSTRUCTION SURVEY
|
|
15.4.1
|
HORIZONTAL AND VERTICAL CONTROL FOR AERIAL MAPPING
|
|
Renewal Status |
MAY 16, 2012 ( ACTIVE )
|
| Firm Name |
TELVENT FARRADYNE INC.
|
| Mailing Address |
1390 PICCARD DRIVE, SUITE 200
|
|
ROCKVILLE, MD 20850
|
| Firm Phone |
(713)744-4703
|
|
1.2.1
|
SYSTEMS PLANNING
|
|
3.4.1
|
MINOR BRIDGE LAYOUTS
|
|
3.6.1
|
MULTI-LEVEL INTERCHANGE AND EXOTIC BRIDGE LAYOUT
|
|
4.1.1
|
MINOR ROADWAY DESIGN
|
|
4.2.1
|
MAJOR ROADWAY DESIGN
|
|
4.3.1
|
COMPLEX HIGHWAY DESIGN
|
|
7.1.1
|
TRAFFIC ENGINEERING STUDIES
|
|
7.3.1
|
TRAFFIC SIGNAL TIMING
|
|
7.4.1
|
TRAFFIC CONTROL SYSTEMS ANALYSIS, DESIGN AND IMPLEMENTATION
|
|
7.5.1
|
INTELLIGENT TRANSPORTATION SYSTEMS
|
|
8.1.1
|
SIGNING, PAVEMENT MARKING AND CHANNELIZATION
|
|
8.3.1
|
SIGNALIZATION
|
|
8.4.1
|
ITS CONTROL SYSTEMS ANALYSIS, DESIGN & IMPLEMENTATION
|
|
10.1.1
|
HYDROLOGIC STUDIES
|
|
10.2.1
|
BASIC HYDRAULIC DESIGN
|
|
Renewal Status |
MARCH 4, 2011 ( ACTIVE )
|
| Firm Name |
TENG & ASSOCIATES, INC.
|
| Mailing Address |
205 NORTH MICHIGAN AVENUE
|
|
CHICAGO, IL 60601
|
| Firm Phone |
(312)616-0000
|
|
3.1.1
|
ROUTE STUDIES & SCHEMATIC DESIGN - MINOR ROADWAYS
|
|
3.2.1
|
ROUTE STUDIES & SCHEMATIC DESIGN - MAJOR ROADWAYS
|
|
3.3.1
|
ROUTE STUDIES & SCHEMATIC DESIGN - COMPLEX HIGHWAYS
|
|
3.4.1
|
MINOR BRIDGE LAYOUTS
|
|
3.5.1
|
MAJOR BRIDGE LAYOUTS
|
|
4.1.1
|
MINOR ROADWAY DESIGN
|
|
4.2.1
|
MAJOR ROADWAY DESIGN
|
|
4.3.1
|
COMPLEX HIGHWAY DESIGN
|
|
5.2.1
|
MAJOR BRIDGE DESIGN
|
|
5.4.1
|
EXOTIC BRIDGE DESIGN
|
|
8.1.1
|
SIGNING, PAVEMENT MARKING AND CHANNELIZATION
|
|
8.2.1
|
ILLUMINATION
|
|
11.1.1
|
ROADWAY CONSTRUCTION MANAGEMENT AND INSPECTION
|
|
Renewal Status |
MARCH 7, 2011 ( ACTIVE )
|
| Firm Name |
TERRA ASSOCIATES INC.
|
| Mailing Address |
1445 NORTH LOOP WEST, SUITE 450
|
|
HOUSTON, TX 77008
|
| Firm Phone |
(713)993-0333
|
|
7.1.1
|
TRAFFIC ENGINEERING STUDIES
|
|
8.1.1
|
SIGNING, PAVEMENT MARKING AND CHANNELIZATION
|
|
8.3.1
|
SIGNALIZATION
|
|
10.1.1
|
HYDROLOGIC STUDIES
|
|
10.2.1
|
BASIC HYDRAULIC DESIGN
|
|
10.3.1
|
COMPLEX HYDRAULIC DESIGN
|
|
Renewal Status |
MARCH 1, 2012 ( ACTIVE )
|
| Firm Name |
TERRA TESTING, INC.
|
| Mailing Address |
P.O. BOX 16605
|
|
LUBBOCK, TX 79490
|
| Firm Phone |
(806)793-4767
|
|
2.13.1
|
HAZARDOUS MATERIALS INITIAL SITE ASSESSMENT
|
|
12.1.1
|
ASPHALTIC CONCRETE
|
|
12.2.1
|
PLANT INSPECTION AND TESTING
|
|
14.1.1
|
SOIL EXPLORATION
|
|
14.2.1
|
GEOTECHNICAL TESTING
|
|
14.3.1
|
TRANSPORTATION FOUNDATION STUDIES
|
|
14.4.1
|
BUILDING FOUNDATION STUDIES
|
|
Renewal Status |
JANUARY 20, 2012 ( ACTIVE )
|
| Firm Name |
TERRACON CONSULTANTS, INC.
|
| Mailing Address |
5307 INDUSTRIAL OAKS BLVD STE 160
|
|
AUSTIN, TX 78735
|
| Firm Phone |
(512)442-1122
|
|
2.1.1
|
TRAFFIC NOISE ANALYSIS
|
|
2.3.1
|
WETLAND DELINEATION
|
|
2.4.1
|
NATIONWIDE PERMIT
|
|
2.5.1
|
WATER POLLUTION ABATEMENT PLAN
|
|
2.6.1
|
PROTECTED SPECIES DETERMINATION (HABITAT)
|
|
2.13.1
|
HAZARDOUS MATERIALS INITIAL SITE ASSESSMENT
|
|
2.14.1
|
ENVIRONMENTAL DOCUMENT PREPARATION
|
|
12.1.1
|
ASPHALTIC CONCRETE
|
|
12.1.2
|
PORTLAND CEMENT CONCRETE
|
|
12.2.1
|
PLANT INSPECTION AND TESTING
|
|
14.1.1
|
SOIL EXPLORATION
|
|
14.2.1
|
GEOTECHNICAL TESTING
|
|
14.3.1
|
TRANSPORTATION FOUNDATION STUDIES
|
|
14.4.1
|
BUILDING FOUNDATION STUDIES
|
|
Renewal Status |
FEBRUARY 12, 2012 ( ACTIVE )
|
| Firm Name |
TERRE SOLUTIONS, LLC
|
| Mailing Address |
8524 HIGHWAY 6 NORTH # 329
|
|
HOUSTON, TX 77095
|
| Firm Phone |
(832)372-2226
|
|
10.1.1
|
HYDROLOGIC STUDIES
|
|
10.3.1
|
COMPLEX HYDRAULIC DESIGN
|
|
Renewal Status |
JANUARY 31, 2012 ( ACTIVE )
|
| Firm Name |
TETRA TECH, INC.
|
| Mailing Address |
2901 WILCREST DRIVE
|
|
HOUSTON, TX 77042
|
| Firm Phone |
(832)251-6024
|
|
2.13.1
|
HAZARDOUS MATERIALS INITIAL SITE ASSESSMENT
|
|
4.1.1
|
MINOR ROADWAY DESIGN
|
|
4.2.1
|
MAJOR ROADWAY DESIGN
|
|
10.1.1
|
HYDROLOGIC STUDIES
|
|
10.2.1
|
BASIC HYDRAULIC DESIGN
|
|
10.3.1
|
COMPLEX HYDRAULIC DESIGN
|
|
11.1.1
|
ROADWAY CONSTRUCTION MANAGEMENT AND INSPECTION
|
|
Renewal Status |
APRIL 11, 2012 ( ACTIVE )
|
| Firm Name |
TF SERVICES, LLC
|
| Mailing Address |
3730 MEADOWS SPRING DRIVE
|
|
SUGARLAND, TX 77479
|
| Firm Phone |
(832)858-5021
|
|
3.4.1
|
MINOR BRIDGE LAYOUTS
|
|
3.5.1
|
MAJOR BRIDGE LAYOUTS
|
|
3.6.1
|
MULTI-LEVEL INTERCHANGE AND EXOTIC BRIDGE LAYOUT
|
|
5.1.1
|
MINOR BRIDGE DESIGN
|
|
5.2.1
|
MAJOR BRIDGE DESIGN
|
|
5.3.1
|
MULTI-LEVEL INTERCHANGE DESIGN
|
|
Renewal Status |
JANUARY 13, 2012 ( ACTIVE )
|
| Firm Name |
THE ARIZPE GROUP, INC.
|
| Mailing Address |
6330 HIGHWAY 290 EAST; SUITE 375
|
|
AUSTIN, TX 78723-1156
|
| Firm Phone |
(512)339-3707
|
|
1.4.1
|
LAND PLANNING/ENGINEERING
|
|
3.1.1
|
ROUTE STUDIES & SCHEMATIC DESIGN - MINOR ROADWAYS
|
|
4.1.1
|
MINOR ROADWAY DESIGN
|
|
4.2.1
|
MAJOR ROADWAY DESIGN
|
|
7.1.1
|
TRAFFIC ENGINEERING STUDIES
|
|
7.3.1
|
TRAFFIC SIGNAL TIMING
|
|
7.4.1
|
TRAFFIC CONTROL SYSTEMS ANALYSIS, DESIGN AND IMPLEMENTATION
|
|
8.3.1
|
SIGNALIZATION
|
|
10.4.3
|
PUMP STATION-STRUCTURES
|
|
16.1.1
|
ARCHITECTURE - BUILDINGS AND OTHER STRUCTURES.
|
|
Renewal Status |
APRIL 19, 2012 ( ACTIVE )
|
| Firm Name |
THE CK GROUP, INC.
|
| Mailing Address |
16448 N. 40TH ST, STE A
|
|
PHOENIX, AZ 85032
|
| Firm Phone |
(602)482-5884
|
|
|
 |
|
1.1.1
|
POLICY PLANNING
|
|
1.2.1
|
SYSTEMS PLANNING
|
|
1.3.1
|
SUBAREA/CORRIDOR PLANNING
|
|
1.4.1
|
LAND PLANNING/ENGINEERING
|
|
1.5.1
|
FEASIBILITY STUDIES
|
|
3.1.1
|
ROUTE STUDIES & SCHEMATIC DESIGN - MINOR ROADWAYS
|
|
3.2.1
|
ROUTE STUDIES & SCHEMATIC DESIGN - MAJOR ROADWAYS
|
|
3.3.1
|
ROUTE STUDIES & SCHEMATIC DESIGN - COMPLEX HIGHWAYS
|
|
4.1.1
|
MINOR ROADWAY DESIGN
|
|
4.2.1
|
MAJOR ROADWAY DESIGN
|
|
4.3.1
|
COMPLEX HIGHWAY DESIGN
|
|
4.4.1
|
MAJOR FREEWAY INTERCHANGES AND DIRECT CONNECTORS
|
|
7.1.1
|
TRAFFIC ENGINEERING STUDIES
|
|
7.3.1
|
TRAFFIC SIGNAL TIMING
|
|
7.4.1
|
TRAFFIC CONTROL SYSTEMS ANALYSIS, DESIGN AND IMPLEMENTATION
|
|
8.1.1
|
SIGNING, PAVEMENT MARKING AND CHANNELIZATION
|
|
8.2.1
|
ILLUMINATION
|
|
8.3.1
|
SIGNALIZATION
|
|
9.1.1
|
BICYCLE AND PEDESTRIAN FACILITY DEVELOPMENT
|
|
10.1.1
|
HYDROLOGIC STUDIES
|
|
11.1.1
|
ROADWAY CONSTRUCTION MANAGEMENT AND INSPECTION
|
|
12.1.1
|
ASPHALTIC CONCRETE
|
|
12.1.2
|
PORTLAND CEMENT CONCRETE
|
|
14.1.1
|
SOIL EXPLORATION
|
|
14.2.1
|
GEOTECHNICAL TESTING
|
|
15.1.1
|
SURVEY
|
|
15.1.2
|
PARCEL PLATS
|
|
15.1.3
|
LEGAL DESCRIPTIONS
|
|
15.1.4
|
RIGHT OF WAY MAPS
|
|
15.2.1
|
DESIGN AND CONSTRUCTION SURVEY
|
|
15.4.1
|
HORIZONTAL AND VERTICAL CONTROL FOR AERIAL MAPPING
|
|
Renewal Status |
JUNE 8, 2011 ( ACTIVE )
|
| Firm Name |
THE HAMILTON PARK GROUP
|
| Mailing Address |
941 PRAIRIE CREEK DR
|
|
DESOTO, TX 75115
|
| Firm Phone |
(214)236-9720
|
|
15.1.1
|
SURVEY
|
|
15.2.1
|
DESIGN AND CONSTRUCTION SURVEY
|
|
Renewal Status |
FEBRUARY 7, 2012 ( ACTIVE )
|
| Firm Name |
THE TRAFFIC GROUP, INC.
|
| Mailing Address |
9900 FRANKLIN SQUARE DRIVE - SUITE H
|
|
BALTIMORE, MD 21236-5915
|
| Firm Phone |
(410)931-6600
|
|
3.1.1
|
ROUTE STUDIES & SCHEMATIC DESIGN - MINOR ROADWAYS
|
|
Renewal Status |
MARCH 29, 2012 ( ACTIVE )
|
| Firm Name |
THE WALLACE GROUP, INC
|
| Mailing Address |
P.O. BOX 22007
|
|
WACO, TX 76702
|
| Firm Phone |
(254)772-9272
|
|
3.1.1
|
ROUTE STUDIES & SCHEMATIC DESIGN - MINOR ROADWAYS
|
|
3.2.1
|
ROUTE STUDIES & SCHEMATIC DESIGN - MAJOR ROADWAYS
|
|
4.1.1
|
MINOR ROADWAY DESIGN
|
|
4.2.1
|
MAJOR ROADWAY DESIGN
|
|
15.1.1
|
SURVEY
|
|
15.1.2
|
PARCEL PLATS
|
|
15.1.3
|
LEGAL DESCRIPTIONS
|
|
15.1.4
|
RIGHT OF WAY MAPS
|
|
15.2.1
|
DESIGN AND CONSTRUCTION SURVEY
|
|
15.4.1
|
HORIZONTAL AND VERTICAL CONTROL FOR AERIAL MAPPING
|
|
18.2.1
|
SUBSURFACE UTILITY ENGINEERING
|
|
Renewal Status |
FEBRUARY 13, 2012 ( ACTIVE )
|
| Firm Name |
THE WILSON SURVEY GROUP, INC.
|
| Mailing Address |
2006 BROADWAY, SUITE 103
|
|
PEARLAND, TX 77581
|
| Firm Phone |
(281)485-3991
|
|
15.1.1
|
SURVEY
|
|
15.1.2
|
PARCEL PLATS
|
|
15.1.3
|
LEGAL DESCRIPTIONS
|
|
15.1.4
|
RIGHT OF WAY MAPS
|
|
15.2.1
|
DESIGN AND CONSTRUCTION SURVEY
|
|
15.4.1
|
HORIZONTAL AND VERTICAL CONTROL FOR AERIAL MAPPING
|
|
Renewal Status |
MARCH 22, 2012 ( ACTIVE )
|
| Firm Name |
THOMPSON ENGINEERING TESTING, INC.
|
| Mailing Address |
218 SOUTH ALSTON AVE
|
|
FOLEY, AL 36535
|
| Firm Phone |
(251)970-2880
|
|
2.13.1
|
HAZARDOUS MATERIALS INITIAL SITE ASSESSMENT
|
|
3.4.1
|
MINOR BRIDGE LAYOUTS
|
|
6.1.1
|
ROUTINE BRIDGE INSPECTION
|
|
11.1.1
|
ROADWAY CONSTRUCTION MANAGEMENT AND INSPECTION
|
|
14.1.1
|
SOIL EXPLORATION
|
|
14.2.1
|
GEOTECHNICAL TESTING
|
|
14.3.1
|
TRANSPORTATION FOUNDATION STUDIES
|
|
Renewal Status |
MAY 23, 2011 ( ACTIVE )
|
| Firm Name |
THOMPSON SURVEYING COMPANY
|
| Mailing Address |
3019 SHADOWDALE DR
|
|
HOUSTON, TX 77043
|
| Firm Phone |
(713)895-7348
|
|
15.1.1
|
SURVEY
|
|
15.1.2
|
PARCEL PLATS
|
|
15.1.3
|
LEGAL DESCRIPTIONS
|
|
15.1.4
|
RIGHT OF WAY MAPS
|
|
15.2.1
|
DESIGN AND CONSTRUCTION SURVEY
|
|
15.4.1
|
HORIZONTAL AND VERTICAL CONTROL FOR AERIAL MAPPING
|
|
Renewal Status |
APRIL 10, 2012 ( ACTIVE )
|
| Firm Name |
TLC ENGINEERING, INC.
|
| Mailing Address |
8204 WESTGLEN DRIVE
|
|
HOUSTON, TX 77063
|
| Firm Phone |
(713)868-6900
|
|
6.1.1
|
ROUTINE BRIDGE INSPECTION
|
|
7.1.1
|
TRAFFIC ENGINEERING STUDIES
|
|
7.2.1
|
HIGHWAY-RAIL GRADE CROSSING STUDIES
|
|
8.5.1
|
HIGHWAY-RAIL GRADE CROSSINGS
|
|
10.4.1
|
PUMP STATION-HYDRAULICS
|
|
14.2.1
|
GEOTECHNICAL TESTING
|
|
Renewal Status |
FEBRUARY 23, 2012 ( ACTIVE )
|
| Firm Name |
TOLUNAY-WONG ENGINEERS, INC.
|
| Mailing Address |
10710 S. SAM HOUSTON PKWY. W., STE 100
|
|
HOUSTON, TX 77031
|
| Firm Phone |
(713)722-7064
|
|
1.5.1
|
FEASIBILITY STUDIES
|
|
2.1.1
|
TRAFFIC NOISE ANALYSIS
|
|
2.2.1
|
AIR QUALITY ANALYSIS
|
|
2.3.1
|
WETLAND DELINEATION
|
|
2.4.1
|
NATIONWIDE PERMIT
|
|
2.4.2
|
INDIVIDUAL PERMITS
|
|
2.5.1
|
WATER POLLUTION ABATEMENT PLAN
|
|
2.6.1
|
PROTECTED SPECIES DETERMINATION (HABITAT)
|
|
2.6.2
|
IMPACT EVALUATION ASSESSMENTS
|
|
2.6.3
|
BIOLOGICAL SURVEYS
|
|
2.12.1
|
SOCIO-ECONOMIC AND ENVIRONMENTAL JUSTICE ANALYSES
|
|
2.13.1
|
HAZARDOUS MATERIALS INITIAL SITE ASSESSMENT
|
|
2.14.1
|
ENVIRONMENTAL DOCUMENT PREPARATION
|
|
12.2.1
|
PLANT INSPECTION AND TESTING
|
|
14.1.1
|
SOIL EXPLORATION
|
|
14.2.1
|
GEOTECHNICAL TESTING
|
|
14.3.1
|
TRANSPORTATION FOUNDATION STUDIES
|
|
14.4.1
|
BUILDING FOUNDATION STUDIES
|
|
Renewal Status |
MARCH 29, 2012 ( ACTIVE )
|
| Firm Name |
TOPOGRAPHIC LAND SURVEYORS
|
| Mailing Address |
2903 N. BIG SPRING
|
|
MIDLAND, TX 79705
|
| Firm Phone |
(915)682-1653
|
|
15.1.1
|
SURVEY
|
|
15.1.2
|
PARCEL PLATS
|
|
15.1.3
|
LEGAL DESCRIPTIONS
|
|
15.1.4
|
RIGHT OF WAY MAPS
|
|
15.2.1
|
DESIGN AND CONSTRUCTION SURVEY
|
|
15.4.1
|
HORIZONTAL AND VERTICAL CONTROL FOR AERIAL MAPPING
|
|
Renewal Status |
JANUARY 27, 2012 ( ACTIVE )
|
| Firm Name |
TOWILL, INC.
|
| Mailing Address |
2300 CLAYTON ROAD, SUITE 1200
|
|
CONCORD, CA 94520
|
| Firm Phone |
(303)974-7270
|
|
15.2.1
|
DESIGN AND CONSTRUCTION SURVEY
|
|
15.3.1
|
AERIAL MAPPING
|
|
15.4.1
|
HORIZONTAL AND VERTICAL CONTROL FOR AERIAL MAPPING
|
|
Renewal Status |
MARCH 8, 2012 ( ACTIVE )
|
| Firm Name |
TRAFF DATA & ASSOCIATES
|
| Mailing Address |
P.O.BOX 963
|
|
SUGAR LAND, TX 77487
|
| Firm Phone |
(713)446-8167
|
|
1.3.1
|
SUBAREA/CORRIDOR PLANNING
|
|
1.4.1
|
LAND PLANNING/ENGINEERING
|
|
7.1.1
|
TRAFFIC ENGINEERING STUDIES
|
|
8.1.1
|
SIGNING, PAVEMENT MARKING AND CHANNELIZATION
|
|
Renewal Status |
JANUARY 19, 2012 ( ACTIVE )
|
| Firm Name |
TRAFFIC ENGINEERS, INC.
|
| Mailing Address |
8323 S W FRWY STE 200
|
|
HOUSTON, TX 77074
|
| Firm Phone |
(713)270-8145
|
|
|
 |
|
1.1.1
|
POLICY PLANNING
|
|
1.2.1
|
SYSTEMS PLANNING
|
|
1.3.1
|
SUBAREA/CORRIDOR PLANNING
|
|
1.4.1
|
LAND PLANNING/ENGINEERING
|
|
1.5.1
|
FEASIBILITY STUDIES
|
|
2.12.1
|
SOCIO-ECONOMIC AND ENVIRONMENTAL JUSTICE ANALYSES
|
|
3.1.1
|
ROUTE STUDIES & SCHEMATIC DESIGN - MINOR ROADWAYS
|
|
3.2.1
|
ROUTE STUDIES & SCHEMATIC DESIGN - MAJOR ROADWAYS
|
|
3.3.1
|
ROUTE STUDIES & SCHEMATIC DESIGN - COMPLEX HIGHWAYS
|
|
3.4.1
|
MINOR BRIDGE LAYOUTS
|
|
3.5.1
|
MAJOR BRIDGE LAYOUTS
|
|
3.6.1
|
MULTI-LEVEL INTERCHANGE AND EXOTIC BRIDGE LAYOUT
|
|
4.1.1
|
MINOR ROADWAY DESIGN
|
|
4.2.1
|
MAJOR ROADWAY DESIGN
|
|
4.3.1
|
COMPLEX HIGHWAY DESIGN
|
|
4.4.1
|
MAJOR FREEWAY INTERCHANGES AND DIRECT CONNECTORS
|
|
7.1.1
|
TRAFFIC ENGINEERING STUDIES
|
|
7.2.1
|
HIGHWAY-RAIL GRADE CROSSING STUDIES
|
|
7.3.1
|
TRAFFIC SIGNAL TIMING
|
|
7.4.1
|
TRAFFIC CONTROL SYSTEMS ANALYSIS, DESIGN AND IMPLEMENTATION
|
|
7.5.1
|
INTELLIGENT TRANSPORTATION SYSTEMS
|
|
8.1.1
|
SIGNING, PAVEMENT MARKING AND CHANNELIZATION
|
|
8.3.1
|
SIGNALIZATION
|
|
8.4.1
|
ITS CONTROL SYSTEMS ANALYSIS, DESIGN & IMPLEMENTATION
|
|
8.5.1
|
HIGHWAY-RAIL GRADE CROSSINGS
|
|
9.1.1
|
BICYCLE AND PEDESTRIAN FACILITY DEVELOPMENT
|
|
Renewal Status |
FEBRUARY 17, 2012 ( ACTIVE )
|
| Firm Name |
TRANSCORE
|
| Mailing Address |
4903 W SAM HOUSTON PKWY N
|
|
HOUSTON, TX 77041
|
| Firm Phone |
(713)939-5400
|
|
1.2.1
|
SYSTEMS PLANNING
|
|
1.3.1
|
SUBAREA/CORRIDOR PLANNING
|
|
1.4.1
|
LAND PLANNING/ENGINEERING
|
|
1.5.1
|
FEASIBILITY STUDIES
|
|
1.6.1
|
MAJOR INVESTMENT STUDIES
|
|
3.1.1
|
ROUTE STUDIES & SCHEMATIC DESIGN - MINOR ROADWAYS
|
|
3.2.1
|
ROUTE STUDIES & SCHEMATIC DESIGN - MAJOR ROADWAYS
|
|
3.4.1
|
MINOR BRIDGE LAYOUTS
|
|
4.1.1
|
MINOR ROADWAY DESIGN
|
|
4.2.1
|
MAJOR ROADWAY DESIGN
|
|
4.3.1
|
COMPLEX HIGHWAY DESIGN
|
|
7.1.1
|
TRAFFIC ENGINEERING STUDIES
|
|
7.3.1
|
TRAFFIC SIGNAL TIMING
|
|
7.4.1
|
TRAFFIC CONTROL SYSTEMS ANALYSIS, DESIGN AND IMPLEMENTATION
|
|
7.5.1
|
INTELLIGENT TRANSPORTATION SYSTEMS
|
|
8.1.1
|
SIGNING, PAVEMENT MARKING AND CHANNELIZATION
|
|
8.2.1
|
ILLUMINATION
|
|
8.3.1
|
SIGNALIZATION
|
|
8.4.1
|
ITS CONTROL SYSTEMS ANALYSIS, DESIGN & IMPLEMENTATION
|
|
11.1.1
|
ROADWAY CONSTRUCTION MANAGEMENT AND INSPECTION
|
|
Renewal Status |
JANUARY 27, 2012 ( ACTIVE )
|
| Firm Name |
TRANSYSTEMS CORPORATION CONSULTANTS
|
| Mailing Address |
500 W. 7TH ST, SUITE 1100
|
|
FT WORTH, TX 76102
|
| Firm Phone |
(817)339-8950
|
|
|
 |
|
1.1.1
|
POLICY PLANNING
|
|
1.2.1
|
SYSTEMS PLANNING
|
|
1.3.1
|
SUBAREA/CORRIDOR PLANNING
|
|
1.4.1
|
LAND PLANNING/ENGINEERING
|
|
1.5.1
|
FEASIBILITY STUDIES
|
|
1.6.1
|
MAJOR INVESTMENT STUDIES
|
|
2.1.1
|
TRAFFIC NOISE ANALYSIS
|
|
2.2.1
|
AIR QUALITY ANALYSIS
|
|
2.4.1
|
NATIONWIDE PERMIT
|
|
2.4.2
|
INDIVIDUAL PERMITS
|
|
2.4.3
|
COAST GUARD & U.S. ARMY CORP OF ENGINEER PERMITS
|
|
2.6.1
|
PROTECTED SPECIES DETERMINATION (HABITAT)
|
|
2.7.1
|
SEC. 4(F)\6(F) EVALUATIONS
|
|
2.8.1
|
SURVEYS, RES. & DOC. OF HISTORIC BUILD, STRUCT. AND OBJECTS
|
|
2.10.1
|
ARCHEOLOGICAL SURVEYS
|
|
2.11.1
|
HISTORICAL AND ARCHIVAL RESEARCH
|
|
2.12.1
|
SOCIO-ECONOMIC AND ENVIRONMENTAL JUSTICE ANALYSES
|
|
2.13.1
|
HAZARDOUS MATERIALS INITIAL SITE ASSESSMENT
|
|
2.14.1
|
ENVIRONMENTAL DOCUMENT PREPARATION
|
|
3.1.1
|
ROUTE STUDIES & SCHEMATIC DESIGN - MINOR ROADWAYS
|
|
3.2.1
|
ROUTE STUDIES & SCHEMATIC DESIGN - MAJOR ROADWAYS
|
|
3.3.1
|
ROUTE STUDIES & SCHEMATIC DESIGN - COMPLEX HIGHWAYS
|
|
3.4.1
|
MINOR BRIDGE LAYOUTS
|
|
3.5.1
|
MAJOR BRIDGE LAYOUTS
|
|
3.6.1
|
MULTI-LEVEL INTERCHANGE AND EXOTIC BRIDGE LAYOUT
|
|
4.1.1
|
MINOR ROADWAY DESIGN
|
|
4.2.1
|
MAJOR ROADWAY DESIGN
|
|
4.3.1
|
COMPLEX HIGHWAY DESIGN
|
|
4.4.1
|
MAJOR FREEWAY INTERCHANGES AND DIRECT CONNECTORS
|
|
5.1.1
|
MINOR BRIDGE DESIGN
|
|
5.2.1
|
MAJOR BRIDGE DESIGN
|
|
5.3.1
|
MULTI-LEVEL INTERCHANGE DESIGN
|
|
5.4.1
|
EXOTIC BRIDGE DESIGN
|
|
6.1.1
|
ROUTINE BRIDGE INSPECTION
|
|
6.2.1
|
COMPLEX BRIDGE INSPECTION
|
|
7.1.1
|
TRAFFIC ENGINEERING STUDIES
|
|
7.2.1
|
HIGHWAY-RAIL GRADE CROSSING STUDIES
|
|
7.3.1
|
TRAFFIC SIGNAL TIMING
|
|
7.4.1
|
TRAFFIC CONTROL SYSTEMS ANALYSIS, DESIGN AND IMPLEMENTATION
|
|
7.5.1
|
INTELLIGENT TRANSPORTATION SYSTEMS
|
|
8.1.1
|
SIGNING, PAVEMENT MARKING AND CHANNELIZATION
|
|
8.2.1
|
ILLUMINATION
|
|
8.3.1
|
SIGNALIZATION
|
|
8.4.1
|
ITS CONTROL SYSTEMS ANALYSIS, DESIGN & IMPLEMENTATION
|
|
8.5.1
|
HIGHWAY-RAIL GRADE CROSSINGS
|
|
9.1.1
|
BICYCLE AND PEDESTRIAN FACILITY DEVELOPMENT
|
|
10.1.1
|
HYDROLOGIC STUDIES
|
|
10.2.1
|
BASIC HYDRAULIC DESIGN
|
|
10.3.1
|
COMPLEX HYDRAULIC DESIGN
|
|
10.4.1
|
PUMP STATION-HYDRAULICS
|
|
10.4.3
|
PUMP STATION-STRUCTURES
|
|
10.5.1
|
BRIDGE SCOUR EVALUATIONS AND ANALYSIS
|
|
11.1.1
|
ROADWAY CONSTRUCTION MANAGEMENT AND INSPECTION
|
|
11.2.1
|
MAJOR BRIDGE CONSTRUCTION MANAGEMENT AND INSPECTION
|
|
14.3.1
|
TRANSPORTATION FOUNDATION STUDIES
|
|
15.1.1
|
SURVEY
|
|
15.1.2
|
PARCEL PLATS
|
|
15.1.3
|
LEGAL DESCRIPTIONS
|
|
15.1.4
|
RIGHT OF WAY MAPS
|
|
15.2.1
|
DESIGN AND CONSTRUCTION SURVEY
|
|
15.4.1
|
HORIZONTAL AND VERTICAL CONTROL FOR AERIAL MAPPING
|
|
Renewal Status |
FEBRUARY 8, 2012 ( ACTIVE )
|
| Firm Name |
TRC COMPANIES INC. (TRC)
|
| Mailing Address |
505 EAST HUNTLAND DR STE 250
|
|
AUSTIN, TX 78752
|
| Firm Phone |
(512)329-6080
|
|
|
 |
|
1.5.1
|
FEASIBILITY STUDIES
|
|
2.3.1
|
WETLAND DELINEATION
|
|
2.4.1
|
NATIONWIDE PERMIT
|
|
2.4.2
|
INDIVIDUAL PERMITS
|
|
2.4.3
|
COAST GUARD & U.S. ARMY CORP OF ENGINEER PERMITS
|
|
2.5.1
|
WATER POLLUTION ABATEMENT PLAN
|
|
2.6.1
|
PROTECTED SPECIES DETERMINATION (HABITAT)
|
|
2.6.2
|
IMPACT EVALUATION ASSESSMENTS
|
|
2.6.3
|
BIOLOGICAL SURVEYS
|
|
2.10.1
|
ARCHEOLOGICAL SURVEYS
|
|
2.11.1
|
HISTORICAL AND ARCHIVAL RESEARCH
|
|
2.13.1
|
HAZARDOUS MATERIALS INITIAL SITE ASSESSMENT
|
|
3.1.1
|
ROUTE STUDIES & SCHEMATIC DESIGN - MINOR ROADWAYS
|
|
3.2.1
|
ROUTE STUDIES & SCHEMATIC DESIGN - MAJOR ROADWAYS
|
|
3.3.1
|
ROUTE STUDIES & SCHEMATIC DESIGN - COMPLEX HIGHWAYS
|
|
3.4.1
|
MINOR BRIDGE LAYOUTS
|
|
4.1.1
|
MINOR ROADWAY DESIGN
|
|
4.2.1
|
MAJOR ROADWAY DESIGN
|
|
4.3.1
|
COMPLEX HIGHWAY DESIGN
|
|
4.4.1
|
MAJOR FREEWAY INTERCHANGES AND DIRECT CONNECTORS
|
|
5.1.1
|
MINOR BRIDGE DESIGN
|
|
5.2.1
|
MAJOR BRIDGE DESIGN
|
|
6.1.1
|
ROUTINE BRIDGE INSPECTION
|
|
6.2.1
|
COMPLEX BRIDGE INSPECTION
|
|
8.1.1
|
SIGNING, PAVEMENT MARKING AND CHANNELIZATION
|
|
9.1.1
|
BICYCLE AND PEDESTRIAN FACILITY DEVELOPMENT
|
|
10.1.1
|
HYDROLOGIC STUDIES
|
|
10.2.1
|
BASIC HYDRAULIC DESIGN
|
|
10.3.1
|
COMPLEX HYDRAULIC DESIGN
|
|
10.4.1
|
PUMP STATION-HYDRAULICS
|
|
10.5.1
|
BRIDGE SCOUR EVALUATIONS AND ANALYSIS
|
|
11.1.1
|
ROADWAY CONSTRUCTION MANAGEMENT AND INSPECTION
|
|
12.1.2
|
PORTLAND CEMENT CONCRETE
|
|
12.2.1
|
PLANT INSPECTION AND TESTING
|
|
14.1.1
|
SOIL EXPLORATION
|
|
14.2.1
|
GEOTECHNICAL TESTING
|
|
14.3.1
|
TRANSPORTATION FOUNDATION STUDIES
|
|
14.4.1
|
BUILDING FOUNDATION STUDIES
|
|
15.1.1
|
SURVEY
|
|
15.1.2
|
PARCEL PLATS
|
|
15.1.3
|
LEGAL DESCRIPTIONS
|
|
15.1.4
|
RIGHT OF WAY MAPS
|
|
15.2.1
|
DESIGN AND CONSTRUCTION SURVEY
|
|
Renewal Status |
MARCH 23, 2012 ( ACTIVE )
|
| Firm Name |
TRICIA ALTAMIRANO CONSULTING ENGINEER, INC.
|
| Mailing Address |
1101 S CAP TX HWY D-210
|
|
AUSTIN, TX 78746
|
| Firm Phone |
(512)328-2203
|
|
1.4.1
|
LAND PLANNING/ENGINEERING
|
|
3.1.1
|
ROUTE STUDIES & SCHEMATIC DESIGN - MINOR ROADWAYS
|
|
3.2.1
|
ROUTE STUDIES & SCHEMATIC DESIGN - MAJOR ROADWAYS
|
|
4.1.1
|
MINOR ROADWAY DESIGN
|
|
4.2.1
|
MAJOR ROADWAY DESIGN
|
|
10.1.1
|
HYDROLOGIC STUDIES
|
|
10.2.1
|
BASIC HYDRAULIC DESIGN
|
|
Renewal Status |
FEBRUARY 20, 2012 ( ACTIVE )
|
| Firm Name |
TSC ENGINEERING COMPANY
|
| Mailing Address |
3300 S. GESSNER ROAD, SUITE 100
|
|
HOUSTON, TX 77063
|
| Firm Phone |
(713)784-7777
|
|
|
 |
|
3.1.1
|
ROUTE STUDIES & SCHEMATIC DESIGN - MINOR ROADWAYS
|
|
3.2.1
|
ROUTE STUDIES & SCHEMATIC DESIGN - MAJOR ROADWAYS
|
|
3.3.1
|
ROUTE STUDIES & SCHEMATIC DESIGN - COMPLEX HIGHWAYS
|
|
3.4.1
|
MINOR BRIDGE LAYOUTS
|
|
3.5.1
|
MAJOR BRIDGE LAYOUTS
|
|
3.6.1
|
MULTI-LEVEL INTERCHANGE AND EXOTIC BRIDGE LAYOUT
|
|
4.1.1
|
MINOR ROADWAY DESIGN
|
|
4.2.1
|
MAJOR ROADWAY DESIGN
|
|
4.3.1
|
COMPLEX HIGHWAY DESIGN
|
|
4.4.1
|
MAJOR FREEWAY INTERCHANGES AND DIRECT CONNECTORS
|
|
8.1.1
|
SIGNING, PAVEMENT MARKING AND CHANNELIZATION
|
|
8.3.1
|
SIGNALIZATION
|
|
8.5.1
|
HIGHWAY-RAIL GRADE CROSSINGS
|
|
9.1.1
|
BICYCLE AND PEDESTRIAN FACILITY DEVELOPMENT
|
|
10.1.1
|
HYDROLOGIC STUDIES
|
|
10.2.1
|
BASIC HYDRAULIC DESIGN
|
|
10.3.1
|
COMPLEX HYDRAULIC DESIGN
|
|
10.5.1
|
BRIDGE SCOUR EVALUATIONS AND ANALYSIS
|
|
11.1.1
|
ROADWAY CONSTRUCTION MANAGEMENT AND INSPECTION
|
|
15.1.1
|
SURVEY
|
|
15.1.2
|
PARCEL PLATS
|
|
15.1.3
|
LEGAL DESCRIPTIONS
|
|
15.1.4
|
RIGHT OF WAY MAPS
|
|
15.2.1
|
DESIGN AND CONSTRUCTION SURVEY
|
|
15.4.1
|
HORIZONTAL AND VERTICAL CONTROL FOR AERIAL MAPPING
|
|
Renewal Status |
FEBRUARY 20, 2012 ( ACTIVE )
|
| Firm Name |
TSC SURVEYING COMPANY DBA GEOSURV
|
| Mailing Address |
3300 S. GESSNER ROAD, SUITE 100
|
|
HOUSTON, TX 77063
|
| Firm Phone |
(713)784-4466
|
|
15.1.1
|
SURVEY
|
|
15.1.2
|
PARCEL PLATS
|
|
15.1.3
|
LEGAL DESCRIPTIONS
|
|
15.1.4
|
RIGHT OF WAY MAPS
|
|
15.2.1
|
DESIGN AND CONSTRUCTION SURVEY
|
|
15.4.1
|
HORIZONTAL AND VERTICAL CONTROL FOR AERIAL MAPPING
|
|