Active Precertified Firms - Sorted by Firm Name
|
|
 |
Active Precertified Firm Page Links ( Updated August 10, 2022 at 9:00:05 P.M. )
|
Renewal Status |
JUNE 23, 2022 ( ACTIVE )
|
Firm Name |
T.Y. LIN INTERNATIONAL
|
Mailing Address |
345 CALIFORNIA STREET, SUITE 2300
|
|
SAN FRANCISCO, CA 94104
|
Firm Phone |
(415)291-3731
|
|
 |
1.3.1
|
Subarea/Corridor Planning
|
1.4.1
|
Land Planning/Engineering
|
1.5.1
|
Feasibility Studies
|
1.8.1
|
Public Involvement
|
2.4.1
|
Nationwide Permit
|
2.4.3
|
U.S. Coast G. & U.S. Army Corps of Engr. Permits
|
2.7.1
|
Sec. 4(F)/6(F) Evaluations
|
3.2.1
|
Route Studies & Schematic Design
|
4.2.1
|
Roadway Design
|
4.4.1
|
Freeway Interchanges
|
4.5.1
|
Constructability Review
|
4.6.1
|
3-D Visualization and Animation Services
|
5.2.1
|
Bridge Design
|
5.3.1
|
Multi-Level Interchange Design
|
5.5.1
|
Bridge & Non-Bridge Class Culvert and Inlet Design
|
6.2.1
|
Complex Bridge Inspection Team Leader
|
7.1.1
|
Traffic Engineering Studies
|
7.3.1
|
Traffic Signal Timing
|
7.4.1
|
Traffic Control Systems Analysis, Design And Implementation
|
7.5.1
|
Intelligent Transportation Systems
|
8.1.1
|
Signing, Pavement Marking, And Channelization
|
8.2.1
|
Illumination
|
8.3.1
|
Signalization
|
8.6.1
|
Rail-Highway Design
|
9.1.1
|
Bicycle and Pedestrian Facility Devel. (Retired Category)
|
10.1.1
|
Hydrologic Studies
|
10.2.1
|
Roadway Hydraulic Design
|
10.4.3
|
Pump Stations-Structures
|
10.5.1
|
Bridge Scour Evaluations And Analysis
|
10.8.1
|
FEMA Regulations and Permits
|
11.1.1
|
Roadway Construction Management And Inspection
|
11.2.1
|
Bridge Construction Management And Inspection
|
11.7.1
|
Construct. Schedule Support-Sched of Roadway Design
|
18.4.1
|
Utility Engineering
|
19.1.1
|
Value Engineering (Retired Category)
|
19.2.1
|
Value Engineering
|
Renewal Status |
FEBRUARY 25, 2022 ( ACTIVE )
|
Firm Name |
T-CORE ENGINEERS, LLC
|
Mailing Address |
84 NE LOOP 410 STE 103
|
|
SAN ANTONIO, TX 78216
|
Firm Phone |
(210)900-2448
|
2.4.1
|
Nationwide Permit
|
4.2.1
|
Roadway Design
|
10.1.1
|
Hydrologic Studies
|
10.2.1
|
Roadway Hydraulic Design
|
10.3.1
|
Bridge Hydraulic Design
|
10.5.1
|
Bridge Scour Evaluations And Analysis
|
10.8.1
|
FEMA Regulations and Permits
|
Renewal Status |
JUNE 28, 2022 ( ACTIVE )
|
Firm Name |
TALK STRATEGY, LLC
|
Mailing Address |
PO BOX 761473
|
|
SAN ANTONIO, TX 78245
|
Firm Phone |
(210)223-2772
|
Renewal Status |
JANUARY 3, 2022 ( ACTIVE )
|
Firm Name |
TAM CONSULTING SERVICES LLC
|
Mailing Address |
4520 JENKINS DRIVE
|
|
PLANO, TX 75024
|
Firm Phone |
(469)562-2178
|
|
 |
2.1.1
|
Traffic Noise Analysis
|
2.2.1
|
Air Quality Analysis
|
3.2.1
|
Route Studies & Schematic Design
|
4.2.1
|
Roadway Design
|
4.4.1
|
Freeway Interchanges
|
4.5.1
|
Constructability Review
|
7.1.1
|
Traffic Engineering Studies
|
8.1.1
|
Signing, Pavement Marking, And Channelization
|
8.3.1
|
Signalization
|
11.1.1
|
Roadway Construction Management And Inspection
|
11.2.1
|
Bridge Construction Management And Inspection
|
11.6.1
|
Construction Schedule Support-General
|
12.1.1
|
Asphaltic Concrete Production
|
12.1.2
|
Portland Cement Concrete
|
12.1.3
|
Materials Engineering
|
12.1.4
|
Asphaltic Concrete Placement
|
12.1.5
|
Portland Cement Concrete Placement
|
12.1.6
|
Embankment/Subgrade/Backfill/Base Production
|
12.1.7
|
Embankment/Subgrade/Backfill/Base Placement
|
12.2.1
|
Concrete Plant Inspection and Testing
|
14.1.1
|
Soil Exploration
|
14.2.1
|
Geotechnical Testing
|
14.3.1
|
Transportation Foundation Studies
|
14.4.1
|
Building Foundation Studies
|
14.5.1
|
Evaluation & Design of Geotechnical Related Structures
|
Renewal Status |
JANUARY 18, 2022 ( ACTIVE )
|
Firm Name |
TARGUS ASSOCIATES, LLC
|
Mailing Address |
3333 EARHART DRIVE, SUITE 210
|
|
CARROLLTON, TX 75006
|
Firm Phone |
(972)247-7229
|
2.4.1
|
Nationwide Permit
|
2.6.2
|
Impact Evaluation Assessments (Retired Category)
|
2.13.1
|
Hazardous Materials Initial Site Assessment
|
17.6.1
|
Hazardous Building Materials Assessment (Asbestos)
|
Renewal Status |
JANUARY 7, 2022 ( ACTIVE )
|
Firm Name |
TEAGUE NALL AND PERKINS, INC.
|
Mailing Address |
5237 N. RIVERSIDE DRIVE, SUITE 100
|
|
FORT WORTH, TX 76137
|
Firm Phone |
(817)336-5773
|
|
 |
1.1.1
|
Policy Planning
|
1.2.1
|
Systems Planning
|
1.3.1
|
Subarea/Corridor Planning
|
1.4.1
|
Land Planning/Engineering
|
1.5.1
|
Feasibility Studies
|
1.6.1
|
Major Investment Studies
|
1.8.1
|
Public Involvement
|
2.4.1
|
Nationwide Permit
|
3.2.1
|
Route Studies & Schematic Design
|
4.2.1
|
Roadway Design
|
4.4.1
|
Freeway Interchanges
|
4.5.1
|
Constructability Review
|
4.6.1
|
3-D Visualization and Animation Services
|
5.2.1
|
Bridge Design
|
5.3.1
|
Multi-Level Interchange Design
|
5.5.1
|
Bridge & Non-Bridge Class Culvert and Inlet Design
|
7.1.1
|
Traffic Engineering Studies
|
7.3.1
|
Traffic Signal Timing
|
7.5.1
|
Intelligent Transportation Systems
|
8.1.1
|
Signing, Pavement Marking, And Channelization
|
8.2.1
|
Illumination
|
8.3.1
|
Signalization
|
8.6.1
|
Rail-Highway Design
|
9.1.1
|
Bicycle and Pedestrian Facility Devel. (Retired Category)
|
9.3.1
|
Pedestrian Facility Design
|
10.1.1
|
Hydrologic Studies
|
10.2.1
|
Roadway Hydraulic Design
|
10.3.1
|
Bridge Hydraulic Design
|
10.4.1
|
Storm Water Pump Station-Hydraulic Design
|
10.5.1
|
Bridge Scour Evaluations And Analysis
|
10.7.1
|
Riverine Hydraulic Design
|
10.8.1
|
FEMA Regulations and Permits
|
11.1.1
|
Roadway Construction Management And Inspection
|
11.2.1
|
Bridge Construction Management And Inspection
|
11.3.1
|
Construction Superintendent
|
11.4.1
|
Environmental Inspections
|
11.7.1
|
Construct. Schedule Support-Sched of Roadway Design
|
12.1.3
|
Materials Engineering
|
12.1.4
|
Asphaltic Concrete Placement
|
14.3.1
|
Transportation Foundation Studies
|
15.1.1
|
Right of Way Surveys
|
15.2.1
|
Design Survey
|
15.2.2
|
Construction Survey
|
15.3.3
|
Terrestrial LIDAR
|
15.3.4
|
Mobile LiDAR
|
15.3.5
|
Horizontal and Vertical Control
|
16.3.1
|
Landscape Architecture
|
17.1.1
|
Structural Engineering
|
18.2.1
|
Subsurface Utility Engineering (Utility Eng. Investigation)
|
18.3.1
|
Utility Adjustment Coordination
|
18.4.1
|
Utility Engineering
|
18.5.1
|
Utility Construction Management and Verification
|
18.6.1
|
Utility Management & Coordination Oversight
|
21.1.1
|
Right of Way (ROW) Acquisition Services
|
21.2.1
|
Right of Way (ROW) Acquisition Services Projet Management
|
21.4.1
|
Right of Way (ROW) Negotiation Services
|
21.6.1
|
Condemnation Support Services
|
Renewal Status |
FEBRUARY 1, 2022 ( ACTIVE )
|
Firm Name |
TEAM CONSULTANTS INC.
|
Mailing Address |
4087 SHILLING WAY
|
|
DALLAS, TX 75237
|
Firm Phone |
(214)331-4395
|
2.13.1
|
Hazardous Materials Initial Site Assessment
|
12.1.1
|
Asphaltic Concrete Production
|
12.1.2
|
Portland Cement Concrete
|
12.2.1
|
Concrete Plant Inspection and Testing
|
14.1.1
|
Soil Exploration
|
14.2.1
|
Geotechnical Testing
|
14.3.1
|
Transportation Foundation Studies
|
14.4.1
|
Building Foundation Studies
|
Renewal Status |
APRIL 30, 2022 ( ACTIVE )
|
Firm Name |
TEAM FULMER ENGINEERING SERVICES COMPANY
|
Mailing Address |
4101 LOMA ROSADA
|
|
EL PASO, TX 79934
|
Firm Phone |
(915)433-6428
|
1.1.1
|
Policy Planning
|
1.2.1
|
Systems Planning
|
1.3.1
|
Subarea/Corridor Planning
|
1.4.1
|
Land Planning/Engineering
|
1.5.1
|
Feasibility Studies
|
1.6.1
|
Major Investment Studies
|
2.2.1
|
Air Quality Analysis
|
3.2.1
|
Route Studies & Schematic Design
|
4.2.1
|
Roadway Design
|
8.1.1
|
Signing, Pavement Marking, And Channelization
|
9.1.1
|
Bicycle and Pedestrian Facility Devel. (Retired Category)
|
10.2.1
|
Roadway Hydraulic Design
|
11.1.1
|
Roadway Construction Management And Inspection
|
11.2.1
|
Bridge Construction Management And Inspection
|
12.2.1
|
Concrete Plant Inspection and Testing
|
15.1.1
|
Right of Way Surveys
|
15.2.1
|
Design Survey
|
15.2.2
|
Construction Survey
|
15.3.5
|
Horizontal and Vertical Control
|
Renewal Status |
JANUARY 5, 2022 ( ACTIVE )
|
Firm Name |
TEDSI INFRASTRUCTURE GROUP, INC.
|
Mailing Address |
1201 E. EXPRESSWAY 83
|
|
MISSION, TX 78572
|
Firm Phone |
(956)424-7898
|
|
 |
1.2.1
|
Systems Planning
|
1.3.1
|
Subarea/Corridor Planning
|
1.4.1
|
Land Planning/Engineering
|
1.5.1
|
Feasibility Studies
|
3.2.1
|
Route Studies & Schematic Design
|
4.2.1
|
Roadway Design
|
4.4.1
|
Freeway Interchanges
|
4.5.1
|
Constructability Review
|
5.2.1
|
Bridge Design
|
6.1.1
|
Routine Bridge Inspection Team Leader
|
7.1.1
|
Traffic Engineering Studies
|
7.3.1
|
Traffic Signal Timing
|
7.4.1
|
Traffic Control Systems Analysis, Design And Implementation
|
7.5.1
|
Intelligent Transportation Systems
|
8.1.1
|
Signing, Pavement Marking, And Channelization
|
8.2.1
|
Illumination
|
8.3.1
|
Signalization
|
8.4.1
|
ITS Control Systems Analysis, Design & Implementation
|
8.6.1
|
Rail-Highway Design
|
9.1.1
|
Bicycle and Pedestrian Facility Devel. (Retired Category)
|
10.1.1
|
Hydrologic Studies
|
10.2.1
|
Roadway Hydraulic Design
|
10.3.1
|
Bridge Hydraulic Design
|
10.5.1
|
Bridge Scour Evaluations And Analysis
|
11.1.1
|
Roadway Construction Management And Inspection
|
11.2.1
|
Bridge Construction Management And Inspection
|
15.1.1
|
Right of Way Surveys
|
15.2.1
|
Design Survey
|
15.2.2
|
Construction Survey
|
15.3.5
|
Horizontal and Vertical Control
|
18.4.1
|
Utility Engineering
|
Renewal Status |
MARCH 11, 2022 ( ACTIVE )
|
Firm Name |
TEJAS STRUCTURAL, LLC
|
Mailing Address |
1000 PAPAYA CV
|
|
HUTTO, TX 78634-2200
|
Firm Phone |
(512)905-9988
|
6.1.1
|
Routine Bridge Inspection Team Leader
|
6.1.2
|
Routine Bridge Inspection Project Manager
|
Renewal Status |
JANUARY 25, 2022 ( ACTIVE )
|
Firm Name |
TEJAS SURVEYING, INC.
|
Mailing Address |
1810 FIRST OAKS ST., SUITE 220
|
|
RICHMOND, TX 77406-1668
|
Firm Phone |
(281)240-9099
|
15.1.1
|
Right of Way Surveys
|
15.2.1
|
Design Survey
|
15.2.2
|
Construction Survey
|
15.3.5
|
Horizontal and Vertical Control
|
Renewal Status |
FEBRUARY 8, 2022 ( ACTIVE )
|
Firm Name |
TERRA FLIGHT AERIAL IMAGING, INC.
|
Mailing Address |
PO BOX 12327
|
|
SPRING, TX 77391-2327
|
Firm Phone |
(281)370-1236
|
15.3.1
|
Aerial Photogrammetry
|
Renewal Status |
JANUARY 7, 2022 ( ACTIVE )
|
Firm Name |
TERRACON CONSULTANTS, INC.
|
Mailing Address |
5307 INDUSTRIAL OAKS BLVD STE 160
|
|
AUSTIN, TX 78735
|
Firm Phone |
(512)442-1122
|
|
 |
1.3.1
|
Subarea/Corridor Planning
|
1.5.1
|
Feasibility Studies
|
1.8.1
|
Public Involvement
|
2.1.1
|
Traffic Noise Analysis
|
2.3.1
|
Wetland Delineation
|
2.3.2
|
Conditional/Functional Assessment
|
2.4.1
|
Nationwide Permit
|
2.4.2
|
Clean Water Act Sec. 404 Permits
|
2.4.3
|
U.S. Coast G. & U.S. Army Corps of Engr. Permits
|
2.5.1
|
Geological Assessment for Edwards Aquifer Recharge Zone
|
2.6.2
|
Impact Evaluation Assessments (Retired Category)
|
2.7.1
|
Sec. 4(F)/6(F) Evaluations
|
2.10.1
|
Archaeological Surveys, Doc., Excavation, Testing Rpts
|
2.12.1
|
Socio-Economic And Environmental Justice Analyses
|
2.13.1
|
Hazardous Materials Initial Site Assessment
|
2.14.1
|
Environmental Document Preparation
|
2.15.1
|
Historical Research Of Extant Bldgs, Struct, Landsc., & Obj.
|
2.15.2
|
Historical Surveys & Doc. of Bldgs, Struct, Landsc., & Obj.
|
3.2.1
|
Route Studies & Schematic Design
|
4.2.1
|
Roadway Design
|
4.5.1
|
Constructability Review
|
5.2.1
|
Bridge Design
|
6.1.1
|
Routine Bridge Inspection Team Leader
|
6.1.2
|
Routine Bridge Inspection Project Manager
|
6.4.1
|
Underwater Bridge Inspection Team Leader
|
11.1.1
|
Roadway Construction Management And Inspection
|
11.2.1
|
Bridge Construction Management And Inspection
|
11.3.1
|
Construction Superintendent
|
11.4.1
|
Environmental Inspections
|
11.6.1
|
Construction Schedule Support-General
|
11.8.1
|
Construct Schedule Support-Sched Bridge & Interchange Proj
|
12.1.1
|
Asphaltic Concrete Production
|
12.1.2
|
Portland Cement Concrete
|
12.1.3
|
Materials Engineering
|
12.1.4
|
Asphaltic Concrete Placement
|
12.1.5
|
Portland Cement Concrete Placement
|
12.1.6
|
Embankment/Subgrade/Backfill/Base Production
|
12.1.7
|
Embankment/Subgrade/Backfill/Base Placement
|
12.2.1
|
Concrete Plant Inspection and Testing
|
14.1.1
|
Soil Exploration
|
14.2.1
|
Geotechnical Testing
|
14.3.1
|
Transportation Foundation Studies
|
14.4.1
|
Building Foundation Studies
|
14.5.1
|
Evaluation & Design of Geotechnical Related Structures
|
16.2.1
|
Building and Facilities Architecture
|
17.1.1
|
Structural Engineering
|
17.2.1
|
Mechanical Engineering
|
17.3.1
|
Plumbing Engineering
|
17.4.1
|
Electrical Engineering
|
17.6.1
|
Hazardous Building Materials Assessment (Asbestos)
|
Renewal Status |
APRIL 22, 2022 ( ACTIVE )
|
Firm Name |
TERRADYNE ENGINEERING AUS, INC.
|
Mailing Address |
354 E GLADE ROAD
|
|
EULESS, TX 76039
|
Firm Phone |
(817)952-7217
|
2.13.1
|
Hazardous Materials Initial Site Assessment
|
12.1.1
|
Asphaltic Concrete Production
|
12.1.4
|
Asphaltic Concrete Placement
|
12.1.5
|
Portland Cement Concrete Placement
|
12.1.6
|
Embankment/Subgrade/Backfill/Base Production
|
12.1.7
|
Embankment/Subgrade/Backfill/Base Placement
|
14.1.1
|
Soil Exploration
|
14.2.1
|
Geotechnical Testing
|
14.3.1
|
Transportation Foundation Studies
|
14.4.1
|
Building Foundation Studies
|
Renewal Status |
JANUARY 17, 2022 ( ACTIVE )
|
Firm Name |
TETRA SURVEYS LLC
|
Mailing Address |
PO BOX 66190
|
|
HOUSTON, TX 77266-6190
|
Firm Phone |
(713)470-0079
|
15.1.1
|
Right of Way Surveys
|
Renewal Status |
APRIL 14, 2022 ( ACTIVE )
|
Firm Name |
TETRA TECH, INC.
|
Mailing Address |
1500 CITY WEST, SUITE 1000
|
|
HOUSTON, TX 77042
|
Firm Phone |
(412)921-4011
|
2.13.1
|
Hazardous Materials Initial Site Assessment
|
11.1.1
|
Roadway Construction Management And Inspection
|
11.2.1
|
Bridge Construction Management And Inspection
|
Renewal Status |
JANUARY 20, 2022 ( ACTIVE )
|
Firm Name |
TEXAS INFRASTRUCTURE DEVELOPMENT GROUP LLC
|
Mailing Address |
2238 ESTATE GATE DR
|
|
SAN ANTONIO, TX 78260
|
Firm Phone |
(210)833-5173
|
2.1.1
|
Traffic Noise Analysis
|
2.2.1
|
Air Quality Analysis
|
2.3.1
|
Wetland Delineation
|
2.4.1
|
Nationwide Permit
|
2.4.2
|
Clean Water Act Sec. 404 Permits
|
2.4.3
|
U.S. Coast G. & U.S. Army Corps of Engr. Permits
|
2.6.2
|
Impact Evaluation Assessments (Retired Category)
|
2.13.1
|
Hazardous Materials Initial Site Assessment
|
2.14.1
|
Environmental Document Preparation
|
3.2.1
|
Route Studies & Schematic Design
|
4.2.1
|
Roadway Design
|
8.1.1
|
Signing, Pavement Marking, And Channelization
|
9.1.1
|
Bicycle and Pedestrian Facility Devel. (Retired Category)
|
10.1.1
|
Hydrologic Studies
|
10.2.1
|
Roadway Hydraulic Design
|
10.3.1
|
Bridge Hydraulic Design
|
10.5.1
|
Bridge Scour Evaluations And Analysis
|
Renewal Status |
AUGUST 3, 2022 ( ACTIVE )
|
Firm Name |
TEXAS NDT SERVICES, LLC
|
Mailing Address |
3107 PRIMROSE CANYON LN
|
|
PEARLAND, TX 77584
|
Firm Phone |
(713)398-8293
|
12.2.4
|
Structural Steel Fabrication Plant Inspection and Testing Te
|
Renewal Status |
FEBRUARY 23, 2022 ( ACTIVE )
|
Firm Name |
TEXAS TRANSPORTATION SOLUTIONS, INC.
|
Mailing Address |
11211 TAYLOR DRAPER LN, STE 210
|
|
AUSTIN, TX 78759
|
Firm Phone |
(512)657-8168
|
4.2.1
|
Roadway Design
|
4.4.1
|
Freeway Interchanges
|
4.5.1
|
Constructability Review
|
4.6.1
|
3-D Visualization and Animation Services
|
5.2.1
|
Bridge Design
|
5.3.1
|
Multi-Level Interchange Design
|
5.5.1
|
Bridge & Non-Bridge Class Culvert and Inlet Design
|
6.1.1
|
Routine Bridge Inspection Team Leader
|
8.1.1
|
Signing, Pavement Marking, And Channelization
|
8.6.1
|
Rail-Highway Design
|
9.1.1
|
Bicycle and Pedestrian Facility Devel. (Retired Category)
|
14.3.1
|
Transportation Foundation Studies
|
Renewal Status |
MARCH 1, 2022 ( ACTIVE )
|
Firm Name |
TEXAS URBAN LOW IMPACT DEVELOPMENT LLC DBA WHITE OAK ENGINEERS & PLANNERS
|
Mailing Address |
3506 E TC JESTER BLVD
|
|
HOUSTON, TX 77018
|
Firm Phone |
(713)470-7444
|
1.1.1
|
Policy Planning
|
1.2.1
|
Systems Planning
|
1.3.1
|
Subarea/Corridor Planning
|
1.4.1
|
Land Planning/Engineering
|
1.5.1
|
Feasibility Studies
|
3.2.1
|
Route Studies & Schematic Design
|
4.2.1
|
Roadway Design
|
5.2.1
|
Bridge Design
|
6.1.1
|
Routine Bridge Inspection Team Leader
|
7.1.1
|
Traffic Engineering Studies
|
8.1.1
|
Signing, Pavement Marking, And Channelization
|
8.3.1
|
Signalization
|
8.6.1
|
Rail-Highway Design
|
9.1.1
|
Bicycle and Pedestrian Facility Devel. (Retired Category)
|
10.1.1
|
Hydrologic Studies
|
10.2.1
|
Roadway Hydraulic Design
|
11.2.1
|
Bridge Construction Management And Inspection
|
Renewal Status |
JANUARY 24, 2022 ( ACTIVE )
|
Firm Name |
TFB ENGINEERING, LLC
|
Mailing Address |
12825 VILLA MILANO DRIVE
|
|
FORT WORTH, TX 76126-6114
|
Firm Phone |
(817)946-6086
|
6.1.1
|
Routine Bridge Inspection Team Leader
|
10.5.1
|
Bridge Scour Evaluations And Analysis
|
Renewal Status |
JANUARY 16, 2022 ( ACTIVE )
|
Firm Name |
TGE RESOURCES, INC.
|
Mailing Address |
8048 NORTHCOURT ROAD
|
|
HOUSTON, TX 77040
|
Firm Phone |
(713)744-5805
|
1.1.1
|
Policy Planning
|
1.5.1
|
Feasibility Studies
|
1.9.1
|
Geographic Information System (GIS) and Data Analysis
|
2.3.1
|
Wetland Delineation
|
2.4.2
|
Clean Water Act Sec. 404 Permits
|
2.5.1
|
Geological Assessment for Edwards Aquifer Recharge Zone
|
2.13.1
|
Hazardous Materials Initial Site Assessment
|
17.6.1
|
Hazardous Building Materials Assessment (Asbestos)
|
17.6.2
|
Hazardous Building Materials Assessment (Lead)
|
Renewal Status |
MARCH 28, 2022 ( ACTIVE )
|
Firm Name |
THE ATLANTIC GROUP
|
Mailing Address |
2223 DRAKE AVENUE SW, SUITE 200
|
|
HUNTSVILLE, AL 35805
|
Firm Phone |
(256)971-9991
|
15.3.1
|
Aerial Photogrammetry
|
Renewal Status |
MARCH 8, 2022 ( ACTIVE )
|
Firm Name |
THE CK GROUP, INC.
|
Mailing Address |
4108 AMON CARTER BLVD. 206
|
|
FORT WORTH, TX 76155
|
Firm Phone |
(602)482-5884
|
3.2.1
|
Route Studies & Schematic Design
|
4.2.1
|
Roadway Design
|
7.1.1
|
Traffic Engineering Studies
|
7.3.1
|
Traffic Signal Timing
|
7.4.1
|
Traffic Control Systems Analysis, Design And Implementation
|
8.1.1
|
Signing, Pavement Marking, And Channelization
|
8.2.1
|
Illumination
|
8.3.1
|
Signalization
|
9.1.1
|
Bicycle and Pedestrian Facility Devel. (Retired Category)
|
10.1.1
|
Hydrologic Studies
|
11.1.1
|
Roadway Construction Management And Inspection
|
12.1.2
|
Portland Cement Concrete
|
14.1.1
|
Soil Exploration
|
14.2.1
|
Geotechnical Testing
|
Renewal Status |
JANUARY 7, 2022 ( ACTIVE )
|
Firm Name |
THE ESTES GROUP, LLC
|
Mailing Address |
3010 POINTE PL
|
|
ROUND ROCK, TX 78681
|
Firm Phone |
(512)695-0202
|
1.3.1
|
Subarea/Corridor Planning
|
1.4.1
|
Land Planning/Engineering
|
1.5.1
|
Feasibility Studies
|
1.8.1
|
Public Involvement
|
2.5.1
|
Geological Assessment for Edwards Aquifer Recharge Zone
|
3.2.1
|
Route Studies & Schematic Design
|
4.2.1
|
Roadway Design
|
4.4.1
|
Freeway Interchanges
|
7.1.1
|
Traffic Engineering Studies
|
8.1.1
|
Signing, Pavement Marking, And Channelization
|
9.1.1
|
Bicycle and Pedestrian Facility Devel. (Retired Category)
|
9.3.1
|
Pedestrian Facility Design
|
9.3.2
|
Accessibility Design
|
9.4.1
|
Bikeway Design
|
10.1.1
|
Hydrologic Studies
|
10.2.1
|
Roadway Hydraulic Design
|
10.3.1
|
Bridge Hydraulic Design
|
18.4.1
|
Utility Engineering
|
Renewal Status |
JANUARY 11, 2022 ( ACTIVE )
|
Firm Name |
THE GOODMAN CORPORATION
|
Mailing Address |
3200 TRAVIS ST. SUITE 200
|
|
HOUSTON, TX 77006-3636
|
Firm Phone |
(713)951-7951
|
1.1.1
|
Policy Planning
|
1.2.1
|
Systems Planning
|
1.3.1
|
Subarea/Corridor Planning
|
1.4.1
|
Land Planning/Engineering
|
1.5.1
|
Feasibility Studies
|
1.7.1
|
Traffic Demand Modeling
|
1.8.1
|
Public Involvement
|
2.3.1
|
Wetland Delineation
|
2.13.1
|
Hazardous Materials Initial Site Assessment
|
2.14.1
|
Environmental Document Preparation
|
4.2.1
|
Roadway Design
|
7.1.1
|
Traffic Engineering Studies
|
7.3.1
|
Traffic Signal Timing
|
7.4.1
|
Traffic Control Systems Analysis, Design And Implementation
|
Renewal Status |
AUGUST 3, 2022 ( ACTIVE )
|
Firm Name |
THE HASKELL COMPANY
|
Mailing Address |
2591 DALLAS PARKWAY, SUITE 405
|
|
FRISCO, TX 75034
|
Firm Phone |
(972)731-0800
|
1.5.1
|
Feasibility Studies
|
2.3.1
|
Wetland Delineation
|
2.4.1
|
Nationwide Permit
|
3.2.1
|
Route Studies & Schematic Design
|
4.2.1
|
Roadway Design
|
4.4.1
|
Freeway Interchanges
|
7.1.1
|
Traffic Engineering Studies
|
8.1.1
|
Signing, Pavement Marking, And Channelization
|
9.1.1
|
Bicycle and Pedestrian Facility Devel. (Retired Category)
|
10.1.1
|
Hydrologic Studies
|
10.2.1
|
Roadway Hydraulic Design
|
10.3.1
|
Bridge Hydraulic Design
|
10.5.1
|
Bridge Scour Evaluations And Analysis
|
Renewal Status |
FEBRUARY 15, 2022 ( ACTIVE )
|
Firm Name |
THE OFFICE OF JAMES BURNETT
|
Mailing Address |
711 LOUISIANA STREET, SUITE 111
|
|
HOUSTON, TX 77002
|
Firm Phone |
(713)529-9919
|
1.8.1
|
Public Involvement
|
16.3.1
|
Landscape Architecture
|
Renewal Status |
FEBRUARY 28, 2022 ( ACTIVE )
|
Firm Name |
THE RIOS GROUP, INC.
|
Mailing Address |
7400 SAND ST.
|
|
FT WORTH, TX 76118
|
Firm Phone |
(817)345-7500
|
9.1.1
|
Bicycle and Pedestrian Facility Devel. (Retired Category)
|
11.1.1
|
Roadway Construction Management And Inspection
|
18.2.1
|
Subsurface Utility Engineering (Utility Eng. Investigation)
|
18.3.1
|
Utility Adjustment Coordination
|
18.4.1
|
Utility Engineering
|
18.6.1
|
Utility Management & Coordination Oversight
|
Renewal Status |
MARCH 30, 2022 ( ACTIVE )
|
Firm Name |
THE TRAFFIC GROUP, INC.
|
Mailing Address |
9900 FRANKLIN SQUARE DRIVE - SUITE H
|
|
BALTIMORE, MD 21236-5915
|
Firm Phone |
(410)931-6600
|
3.2.1
|
Route Studies & Schematic Design
|
7.3.1
|
Traffic Signal Timing
|
Renewal Status |
JANUARY 25, 2022 ( ACTIVE )
|
Firm Name |
THE TRANSTEC GROUP, INC
|
Mailing Address |
6111 BALCONES DRIVE
|
|
AUSTIN, TX 78731
|
Firm Phone |
(512)451-6233
|
4.2.1
|
Roadway Design
|
11.1.1
|
Roadway Construction Management And Inspection
|
12.4.1
|
Pavement Design Services
|
12.5.1
|
Pavement Evaluation
|
Renewal Status |
JANUARY 10, 2022 ( ACTIVE )
|
Firm Name |
THOMPSON ENGINEERING, INC.
|
Mailing Address |
P.O. BOX 9637
|
|
MOBILE, AL 36691
|
Firm Phone |
(251)666-2443
|
3.2.1
|
Route Studies & Schematic Design
|
4.2.1
|
Roadway Design
|
5.2.1
|
Bridge Design
|
8.1.1
|
Signing, Pavement Marking, And Channelization
|
11.1.1
|
Roadway Construction Management And Inspection
|
14.1.1
|
Soil Exploration
|
14.2.1
|
Geotechnical Testing
|
Renewal Status |
JULY 26, 2022 ( ACTIVE )
|
Firm Name |
THOMPSON-HAMILTON ENGINEERING, LLC
|
Mailing Address |
283 CATALINA LANE
|
|
AUSTIN, TX 78737
|
Firm Phone |
(512)791-1175
|
2.5.1
|
Geological Assessment for Edwards Aquifer Recharge Zone
|
10.1.1
|
Hydrologic Studies
|
10.2.1
|
Roadway Hydraulic Design
|
Renewal Status |
JANUARY 7, 2022 ( ACTIVE )
|
Firm Name |
TJ HUNTER ENGINEERING, INC.
|
Mailing Address |
5060 ADDISON CIRCLE #4842
|
|
ADDISON, TX 75001
|
Firm Phone |
(469)431-0177
|
3.2.1
|
Route Studies & Schematic Design
|
4.2.1
|
Roadway Design
|
4.4.1
|
Freeway Interchanges
|
4.5.1
|
Constructability Review
|
7.1.1
|
Traffic Engineering Studies
|
8.1.1
|
Signing, Pavement Marking, And Channelization
|
10.2.1
|
Roadway Hydraulic Design
|
11.1.1
|
Roadway Construction Management And Inspection
|
11.7.1
|
Construct. Schedule Support-Sched of Roadway Design
|
Renewal Status |
APRIL 22, 2022 ( ACTIVE )
|
Firm Name |
TJKM
|
Mailing Address |
4305 HACIENDA DRIVE, SUITE 550
|
|
PLEASANTON, CA 94588
|
Firm Phone |
(925)463-0611
|
1.1.1
|
Policy Planning
|
1.2.1
|
Systems Planning
|
1.3.1
|
Subarea/Corridor Planning
|
1.4.1
|
Land Planning/Engineering
|
1.5.1
|
Feasibility Studies
|
1.6.1
|
Major Investment Studies
|
1.7.1
|
Traffic Demand Modeling
|
1.8.1
|
Public Involvement
|
3.2.1
|
Route Studies & Schematic Design
|
4.2.1
|
Roadway Design
|
7.1.1
|
Traffic Engineering Studies
|
7.3.1
|
Traffic Signal Timing
|
7.4.1
|
Traffic Control Systems Analysis, Design And Implementation
|
7.5.1
|
Intelligent Transportation Systems
|
8.1.1
|
Signing, Pavement Marking, And Channelization
|
8.2.1
|
Illumination
|
8.3.1
|
Signalization
|
8.4.1
|
ITS Control Systems Analysis, Design & Implementation
|
8.6.1
|
Rail-Highway Design
|
9.1.1
|
Bicycle and Pedestrian Facility Devel. (Retired Category)
|
11.1.1
|
Roadway Construction Management And Inspection
|
Renewal Status |
JANUARY 31, 2022 ( ACTIVE )
|
Firm Name |
TLC ENGINEERING, INC.
|
Mailing Address |
8204 WESTGLEN DRIVE
|
|
HOUSTON, TX 77063
|
Firm Phone |
(713)868-6900
|
1.1.1
|
Policy Planning
|
1.3.1
|
Subarea/Corridor Planning
|
1.4.1
|
Land Planning/Engineering
|
1.5.1
|
Feasibility Studies
|
2.12.1
|
Socio-Economic And Environmental Justice Analyses
|
2.13.1
|
Hazardous Materials Initial Site Assessment
|
4.2.1
|
Roadway Design
|
8.1.1
|
Signing, Pavement Marking, And Channelization
|
8.6.1
|
Rail-Highway Design
|
10.4.1
|
Storm Water Pump Station-Hydraulic Design
|
17.1.1
|
Structural Engineering
|
17.5.1
|
Civil Engineering
|
Renewal Status |
JANUARY 7, 2022 ( ACTIVE )
|
Firm Name |
TLP ENGINEERING CONSULTANTS, INC.
|
Mailing Address |
450 S. ORANGE AVENUE, SUITE 600
|
|
ORLANDO, FL 32801
|
Firm Phone |
(407)901-5061
|
1.5.1
|
Feasibility Studies
|
4.4.1
|
Freeway Interchanges
|
5.2.1
|
Bridge Design
|
5.3.1
|
Multi-Level Interchange Design
|
9.1.1
|
Bicycle and Pedestrian Facility Devel. (Retired Category)
|
Renewal Status |
FEBRUARY 11, 2022 ( ACTIVE )
|
Firm Name |
TOLUNAY-WONG ENGINEERS, INC.
|
Mailing Address |
10710 S. SAM HOUSTON PKWY. W., STE 100
|
|
HOUSTON, TX 77031
|
Firm Phone |
(713)722-7064
|
1.5.1
|
Feasibility Studies
|
2.13.1
|
Hazardous Materials Initial Site Assessment
|
12.1.1
|
Asphaltic Concrete Production
|
12.1.2
|
Portland Cement Concrete
|
12.1.3
|
Materials Engineering
|
12.1.4
|
Asphaltic Concrete Placement
|
12.1.5
|
Portland Cement Concrete Placement
|
12.1.6
|
Embankment/Subgrade/Backfill/Base Production
|
12.1.7
|
Embankment/Subgrade/Backfill/Base Placement
|
12.2.1
|
Concrete Plant Inspection and Testing
|
12.2.5
|
Hot Mix Asphalt (HMA) Plant Inspection and Testing
|
14.1.1
|
Soil Exploration
|
14.2.1
|
Geotechnical Testing
|
14.3.1
|
Transportation Foundation Studies
|
14.4.1
|
Building Foundation Studies
|
14.5.1
|
Evaluation & Design of Geotechnical Related Structures
|
Renewal Status |
MARCH 21, 2022 ( ACTIVE )
|
Firm Name |
TOOLE DESIGN GROUP, LLC
|
Mailing Address |
8484 GEORGIA AVENUE STE 800
|
|
SILVER SPRING, MD 20910
|
Firm Phone |
(301)927-1900
|
1.1.1
|
Policy Planning
|
1.2.1
|
Systems Planning
|
1.3.1
|
Subarea/Corridor Planning
|
1.4.1
|
Land Planning/Engineering
|
1.5.1
|
Feasibility Studies
|
7.1.1
|
Traffic Engineering Studies
|
8.1.1
|
Signing, Pavement Marking, And Channelization
|
9.1.1
|
Bicycle and Pedestrian Facility Devel. (Retired Category)
|
Renewal Status |
JANUARY 6, 2022 ( ACTIVE )
|
Firm Name |
TOWILL, INC.
|
Mailing Address |
2300 CLAYTON ROAD, SUITE 1200
|
|
CONCORD, CA 94520-2176
|
Firm Phone |
(925)682-6976
|
15.2.1
|
Design Survey
|
15.2.2
|
Construction Survey
|
15.3.1
|
Aerial Photogrammetry
|
15.3.5
|
Horizontal and Vertical Control
|
Renewal Status |
JANUARY 3, 2022 ( ACTIVE )
|
Firm Name |
TRAF-IQ, INC.
|
Mailing Address |
14811 ST. MARY'S LANE, SUITE 180
|
|
HOUSTON, TX 77079
|
Firm Phone |
(832)399-1100
|
1.2.1
|
Systems Planning
|
1.3.1
|
Subarea/Corridor Planning
|
1.4.1
|
Land Planning/Engineering
|
1.5.1
|
Feasibility Studies
|
1.6.1
|
Major Investment Studies
|
3.2.1
|
Route Studies & Schematic Design
|
4.2.1
|
Roadway Design
|
7.1.1
|
Traffic Engineering Studies
|
7.3.1
|
Traffic Signal Timing
|
7.4.1
|
Traffic Control Systems Analysis, Design And Implementation
|
7.5.1
|
Intelligent Transportation Systems
|
8.1.1
|
Signing, Pavement Marking, And Channelization
|
8.2.1
|
Illumination
|
8.3.1
|
Signalization
|
8.4.1
|
ITS Control Systems Analysis, Design & Implementation
|
8.6.1
|
Rail-Highway Design
|
9.1.1
|
Bicycle and Pedestrian Facility Devel. (Retired Category)
|
Renewal Status |
JANUARY 25, 2022 ( ACTIVE )
|
Firm Name |
TRAFFIC ENGINEERS, INC.
|
Mailing Address |
712 MAIN STE 950
|
|
HOUSTON, TX 77002-3207
|
Firm Phone |
(713)270-8145
|
1.1.1
|
Policy Planning
|
1.2.1
|
Systems Planning
|
1.3.1
|
Subarea/Corridor Planning
|
1.4.1
|
Land Planning/Engineering
|
2.12.1
|
Socio-Economic And Environmental Justice Analyses
|
3.2.1
|
Route Studies & Schematic Design
|
4.2.1
|
Roadway Design
|
4.4.1
|
Freeway Interchanges
|
7.1.1
|
Traffic Engineering Studies
|
7.3.1
|
Traffic Signal Timing
|
7.4.1
|
Traffic Control Systems Analysis, Design And Implementation
|
7.5.1
|
Intelligent Transportation Systems
|
8.1.1
|
Signing, Pavement Marking, And Channelization
|
8.2.1
|
Illumination
|
8.3.1
|
Signalization
|
8.4.1
|
ITS Control Systems Analysis, Design & Implementation
|
8.6.1
|
Rail-Highway Design
|
9.1.1
|
Bicycle and Pedestrian Facility Devel. (Retired Category)
|
Renewal Status |
JANUARY 8, 2022 ( ACTIVE )
|
Firm Name |
TRANSCEND ENGINEERS & PLANNERS, LLC
|
Mailing Address |
23410 GRAND RESERVE DRIVE, SUITE 101
|
|
KATY, TX 77494
|
Firm Phone |
(832)492-4499
|
1.1.1
|
Policy Planning
|
1.2.1
|
Systems Planning
|
1.3.1
|
Subarea/Corridor Planning
|
1.4.1
|
Land Planning/Engineering
|
1.5.1
|
Feasibility Studies
|
1.6.1
|
Major Investment Studies
|
1.7.1
|
Traffic Demand Modeling
|
1.8.1
|
Public Involvement
|
3.2.1
|
Route Studies & Schematic Design
|
7.1.1
|
Traffic Engineering Studies
|
7.3.1
|
Traffic Signal Timing
|
7.4.1
|
Traffic Control Systems Analysis, Design And Implementation
|
7.5.1
|
Intelligent Transportation Systems
|
8.1.1
|
Signing, Pavement Marking, And Channelization
|
8.2.1
|
Illumination
|
8.3.1
|
Signalization
|
8.4.1
|
ITS Control Systems Analysis, Design & Implementation
|
8.6.1
|
Rail-Highway Design
|
9.1.1
|
Bicycle and Pedestrian Facility Devel. (Retired Category)
|
Renewal Status |
FEBRUARY 1, 2022 ( ACTIVE )
|
Firm Name |
TRANSPO GROUP USA, INCORPORATED
|
Mailing Address |
12131 113TH AVE NE SUITE 203
|
|
KIRKLAND, WA 98034
|
Firm Phone |
(425)896-5221
|
1.1.1
|
Policy Planning
|
1.2.1
|
Systems Planning
|
1.3.1
|
Subarea/Corridor Planning
|
1.4.1
|
Land Planning/Engineering
|
1.5.1
|
Feasibility Studies
|
1.7.1
|
Traffic Demand Modeling
|
2.12.1
|
Socio-Economic And Environmental Justice Analyses
|
3.2.1
|
Route Studies & Schematic Design
|
4.2.1
|
Roadway Design
|
4.4.1
|
Freeway Interchanges
|
8.1.1
|
Signing, Pavement Marking, And Channelization
|
9.1.1
|
Bicycle and Pedestrian Facility Devel. (Retired Category)
|
Renewal Status |
JANUARY 19, 2022 ( ACTIVE )
|
Firm Name |
TRANSPORTATION AND MUNICIPAL ENGINEERS, LLC
|
Mailing Address |
808 SHADY CREEK COURT
|
|
CLEBURNE, TX 76033
|
Firm Phone |
(817)517-4828
|
3.2.1
|
Route Studies & Schematic Design
|
4.2.1
|
Roadway Design
|
5.2.1
|
Bridge Design
|
8.1.1
|
Signing, Pavement Marking, And Channelization
|
10.1.1
|
Hydrologic Studies
|
10.2.1
|
Roadway Hydraulic Design
|
11.1.1
|
Roadway Construction Management And Inspection
|
11.2.1
|
Bridge Construction Management And Inspection
|
15.1.1
|
Right of Way Surveys
|
15.2.1
|
Design Survey
|
15.2.2
|
Construction Survey
|
Renewal Status |
JANUARY 18, 2022 ( ACTIVE )
|
Firm Name |
TRANSYSTEMS CORPORATION DBA TRANSYSTEMS CORPORATION CONSULTANTS
|
Mailing Address |
500 W. 7TH ST, SUITE 1100
|
|
FT WORTH, TX 76102
|
Firm Phone |
(817)339-8950
|
|
 |
1.1.1
|
Policy Planning
|
1.2.1
|
Systems Planning
|
1.3.1
|
Subarea/Corridor Planning
|
1.4.1
|
Land Planning/Engineering
|
1.5.1
|
Feasibility Studies
|
1.7.1
|
Traffic Demand Modeling
|
1.8.1
|
Public Involvement
|
2.1.1
|
Traffic Noise Analysis
|
2.2.1
|
Air Quality Analysis
|
2.4.1
|
Nationwide Permit
|
2.4.2
|
Clean Water Act Sec. 404 Permits
|
2.4.3
|
U.S. Coast G. & U.S. Army Corps of Engr. Permits
|
2.7.1
|
Sec. 4(F)/6(F) Evaluations
|
2.10.1
|
Archaeological Surveys, Doc., Excavation, Testing Rpts
|
2.12.1
|
Socio-Economic And Environmental Justice Analyses
|
2.14.1
|
Environmental Document Preparation
|
3.2.1
|
Route Studies & Schematic Design
|
4.2.1
|
Roadway Design
|
4.4.1
|
Freeway Interchanges
|
4.5.1
|
Constructability Review
|
4.6.1
|
3-D Visualization and Animation Services
|
5.2.1
|
Bridge Design
|
5.3.1
|
Multi-Level Interchange Design
|
5.5.1
|
Bridge & Non-Bridge Class Culvert and Inlet Design
|
6.1.1
|
Routine Bridge Inspection Team Leader
|
6.1.2
|
Routine Bridge Inspection Project Manager
|
6.2.1
|
Complex Bridge Inspection Team Leader
|
6.2.2
|
Complex Bridge Inspection Project Manager
|
6.3.1
|
Tunnel Inspection Team Leader
|
6.3.2
|
Tunnel Inspection Project Manager
|
7.1.1
|
Traffic Engineering Studies
|
7.3.1
|
Traffic Signal Timing
|
7.4.1
|
Traffic Control Systems Analysis, Design And Implementation
|
7.5.1
|
Intelligent Transportation Systems
|
8.1.1
|
Signing, Pavement Marking, And Channelization
|
8.2.1
|
Illumination
|
8.3.1
|
Signalization
|
8.4.1
|
ITS Control Systems Analysis, Design & Implementation
|
8.6.1
|
Rail-Highway Design
|
9.1.1
|
Bicycle and Pedestrian Facility Devel. (Retired Category)
|
10.1.1
|
Hydrologic Studies
|
10.2.1
|
Roadway Hydraulic Design
|
10.3.1
|
Bridge Hydraulic Design
|
10.4.1
|
Storm Water Pump Station-Hydraulic Design
|
10.4.3
|
Pump Stations-Structures
|
10.5.1
|
Bridge Scour Evaluations And Analysis
|
10.8.1
|
FEMA Regulations and Permits
|
11.1.1
|
Roadway Construction Management And Inspection
|
11.2.1
|
Bridge Construction Management And Inspection
|
11.3.1
|
Construction Superintendent
|
11.6.1
|
Construction Schedule Support-General
|
13.1.1
|
Rail Route and Design Studies
|
13.2.1
|
Rail Infrastructure Analysis
|
13.3.1
|
Rail Infrastructure Project Development
|
13.5.1
|
Rail Construction Management
|
14.3.1
|
Transportation Foundation Studies
|
15.1.1
|
Right of Way Surveys
|
15.2.1
|
Design Survey
|
15.2.2
|
Construction Survey
|
15.3.5
|
Horizontal and Vertical Control
|
16.1.1
|
Architecture
|
17.2.1
|
Mechanical Engineering
|
17.4.1
|
Electrical Engineering
|
17.5.1
|
Civil Engineering
|
18.3.1
|
Utility Adjustment Coordination
|
18.4.1
|
Utility Engineering
|
18.5.1
|
Utility Construction Management and Verification
|
18.6.1
|
Utility Management & Coordination Oversight
|
Renewal Status |
APRIL 29, 2022 ( ACTIVE )
|
Firm Name |
TRC ENVIRONMENTAL CORPORATION
|
Mailing Address |
505 EAST HUNTLAND DR STE 250
|
|
AUSTIN, TX 78752
|
Firm Phone |
(512)684-3188
|
|
 |
1.4.1
|
Land Planning/Engineering
|
1.5.1
|
Feasibility Studies
|
1.6.1
|
Major Investment Studies
|
2.3.1
|
Wetland Delineation
|
2.4.1
|
Nationwide Permit
|
2.4.2
|
Clean Water Act Sec. 404 Permits
|
2.4.3
|
U.S. Coast G. & U.S. Army Corps of Engr. Permits
|
2.5.1
|
Geological Assessment for Edwards Aquifer Recharge Zone
|
2.6.2
|
Impact Evaluation Assessments (Retired Category)
|
2.10.1
|
Archaeological Surveys, Doc., Excavation, Testing Rpts
|
2.13.1
|
Hazardous Materials Initial Site Assessment
|
3.2.1
|
Route Studies & Schematic Design
|
4.2.1
|
Roadway Design
|
4.4.1
|
Freeway Interchanges
|
4.5.1
|
Constructability Review
|
5.2.1
|
Bridge Design
|
5.5.1
|
Bridge & Non-Bridge Class Culvert and Inlet Design
|
6.1.1
|
Routine Bridge Inspection Team Leader
|
6.2.1
|
Complex Bridge Inspection Team Leader
|
7.1.1
|
Traffic Engineering Studies
|
8.1.1
|
Signing, Pavement Marking, And Channelization
|
8.3.1
|
Signalization
|
8.6.1
|
Rail-Highway Design
|
9.1.1
|
Bicycle and Pedestrian Facility Devel. (Retired Category)
|
10.1.1
|
Hydrologic Studies
|
10.2.1
|
Roadway Hydraulic Design
|
10.3.1
|
Bridge Hydraulic Design
|
10.4.1
|
Storm Water Pump Station-Hydraulic Design
|
10.5.1
|
Bridge Scour Evaluations And Analysis
|
10.6.1
|
Coastal Hydraulic Design
|
10.8.1
|
FEMA Regulations and Permits
|
11.1.1
|
Roadway Construction Management And Inspection
|
11.7.1
|
Construct. Schedule Support-Sched of Roadway Design
|
12.1.2
|
Portland Cement Concrete
|
12.2.1
|
Concrete Plant Inspection and Testing
|
17.5.1
|
Civil Engineering
|
Renewal Status |
JANUARY 13, 2022 ( ACTIVE )
|
Firm Name |
TREVINO WATER ENGINEERING, LLC
|
Mailing Address |
133 FOREST ROAD
|
|
DAVENPORT, IA 52803
|
Firm Phone |
(512)775-9994
|
10.1.1
|
Hydrologic Studies
|
10.2.1
|
Roadway Hydraulic Design
|
10.3.1
|
Bridge Hydraulic Design
|
Renewal Status |
MARCH 30, 2022 ( ACTIVE )
|
Firm Name |
TRIHYDRO CORPORATION
|
Mailing Address |
1252 COMMERCE DRIVE
|
|
LARAMIE, WY 82070
|
Firm Phone |
(307)745-7474
|
2.13.1
|
Hazardous Materials Initial Site Assessment
|
8.1.1
|
Signing, Pavement Marking, And Channelization
|
10.2.1
|
Roadway Hydraulic Design
|
Renewal Status |
JANUARY 13, 2022 ( ACTIVE )
|
Firm Name |
TRW ENGINEERS, INC DBA TSC ENGINEERING
|
Mailing Address |
10970 STANCLIFF ROAD
|
|
HOUSTON, TX 77099
|
Firm Phone |
(713)784-7777
|
|
 |
1.1.1
|
Policy Planning
|
1.2.1
|
Systems Planning
|
1.3.1
|
Subarea/Corridor Planning
|
1.4.1
|
Land Planning/Engineering
|
1.5.1
|
Feasibility Studies
|
1.6.1
|
Major Investment Studies
|
2.14.1
|
Environmental Document Preparation
|
3.2.1
|
Route Studies & Schematic Design
|
4.2.1
|
Roadway Design
|
4.4.1
|
Freeway Interchanges
|
7.1.1
|
Traffic Engineering Studies
|
7.3.1
|
Traffic Signal Timing
|
7.4.1
|
Traffic Control Systems Analysis, Design And Implementation
|
7.5.1
|
Intelligent Transportation Systems
|
8.1.1
|
Signing, Pavement Marking, And Channelization
|
8.3.1
|
Signalization
|
8.4.1
|
ITS Control Systems Analysis, Design & Implementation
|
8.6.1
|
Rail-Highway Design
|
9.1.1
|
Bicycle and Pedestrian Facility Devel. (Retired Category)
|
10.1.1
|
Hydrologic Studies
|
10.2.1
|
Roadway Hydraulic Design
|
10.3.1
|
Bridge Hydraulic Design
|
10.4.1
|
Storm Water Pump Station-Hydraulic Design
|
10.5.1
|
Bridge Scour Evaluations And Analysis
|
11.1.1
|
Roadway Construction Management And Inspection
|
18.2.1
|
Subsurface Utility Engineering (Utility Eng. Investigation)
|
Renewal Status |
APRIL 5, 2022 ( ACTIVE )
|
Firm Name |
TSI LABORATORIES, INC.
|
Mailing Address |
1810 SOUTH LAURENT ST.
|
|
VICTORIA, TX 77901
|
Firm Phone |
(361)578-6933
|
12.1.2
|
Portland Cement Concrete
|
14.2.1
|
Geotechnical Testing
|
Renewal Status |
JANUARY 13, 2022 ( ACTIVE )
|
Firm Name |
TSIT ENGINEERING & CONSULTING, LLC
|
Mailing Address |
11301 MOSIER VALLEY RD
|
|
FT WORTH, TX 76040
|
Firm Phone |
(214)563-3003
|
11.1.1
|
Roadway Construction Management And Inspection
|
12.1.1
|
Asphaltic Concrete Production
|
12.1.2
|
Portland Cement Concrete
|
12.1.3
|
Materials Engineering
|
12.1.4
|
Asphaltic Concrete Placement
|
12.1.5
|
Portland Cement Concrete Placement
|
12.1.6
|
Embankment/Subgrade/Backfill/Base Production
|
12.1.7
|
Embankment/Subgrade/Backfill/Base Placement
|
12.2.1
|
Concrete Plant Inspection and Testing
|
14.1.1
|
Soil Exploration
|
14.2.1
|
Geotechnical Testing
|
14.3.1
|
Transportation Foundation Studies
|
14.4.1
|
Building Foundation Studies
|
Renewal Status |
MARCH 15, 2022 ( ACTIVE )
|
Firm Name |
TTL, INC.
|
Mailing Address |
17215 JONES MALTSBERGER
|
|
SAN ANTONIO, TX 78247
|
Firm Phone |
(210)888-6100
|
|
 |
2.3.1
|
Wetland Delineation
|
2.4.1
|
Nationwide Permit
|
2.4.2
|
Clean Water Act Sec. 404 Permits
|
2.5.1
|
Geological Assessment for Edwards Aquifer Recharge Zone
|
2.13.1
|
Hazardous Materials Initial Site Assessment
|
3.2.1
|
Route Studies & Schematic Design
|
4.2.1
|
Roadway Design
|
4.4.1
|
Freeway Interchanges
|
11.1.1
|
Roadway Construction Management And Inspection
|
11.2.1
|
Bridge Construction Management And Inspection
|
11.4.1
|
Environmental Inspections
|
12.1.1
|
Asphaltic Concrete Production
|
12.1.2
|
Portland Cement Concrete
|
12.1.4
|
Asphaltic Concrete Placement
|
12.1.5
|
Portland Cement Concrete Placement
|
12.1.7
|
Embankment/Subgrade/Backfill/Base Placement
|
12.2.1
|
Concrete Plant Inspection and Testing
|
14.1.1
|
Soil Exploration
|
14.2.1
|
Geotechnical Testing
|
14.3.1
|
Transportation Foundation Studies
|
14.4.1
|
Building Foundation Studies
|
15.1.1
|
Right of Way Surveys
|
15.2.1
|
Design Survey
|
15.2.2
|
Construction Survey
|
15.3.2
|
Terrestrial Photogrammetry
|
15.3.3
|
Terrestrial LIDAR
|
15.3.4
|
Mobile LiDAR
|
15.3.5
|
Horizontal and Vertical Control
|
17.5.1
|
Civil Engineering
|
17.6.1
|
Hazardous Building Materials Assessment (Asbestos)
|
17.6.2
|
Hazardous Building Materials Assessment (Lead)
|
18.2.1
|
Subsurface Utility Engineering (Utility Eng. Investigation)
|
18.4.1
|
Utility Engineering
|
Renewal Status |
JANUARY 6, 2022 ( ACTIVE )
|
Firm Name |
T2 UES, INC.
|
Mailing Address |
2590 OAKMONT DRIVE STE 210
|
|
ROUND ROCK, TX 78665
|
Firm Phone |
(512)366-6807
|
1.1.1
|
Policy Planning
|
1.4.1
|
Land Planning/Engineering
|
17.5.1
|
Civil Engineering
|
18.2.1
|
Subsurface Utility Engineering (Utility Eng. Investigation)
|
18.3.1
|
Utility Adjustment Coordination
|
18.4.1
|
Utility Engineering
|
18.5.1
|
Utility Construction Management and Verification
|
18.6.1
|
Utility Management & Coordination Oversight
|
Renewal Status |
JANUARY 12, 2022 ( ACTIVE )
|
Firm Name |
T3E, LLC
|
Mailing Address |
4863 HORSESHOE DRIVE
|
|
WEATHERFORD, TX 76087
|
Firm Phone |
(254)651-9533
|
3.2.1
|
Route Studies & Schematic Design
|
4.2.1
|
Roadway Design
|
8.1.1
|
Signing, Pavement Marking, And Channelization
|
9.1.1
|
Bicycle and Pedestrian Facility Devel. (Retired Category)
|
10.1.1
|
Hydrologic Studies
|
10.2.1
|
Roadway Hydraulic Design
|
11.1.1
|
Roadway Construction Management And Inspection
|
11.2.1
|
Bridge Construction Management And Inspection
|
12.2.1
|
Concrete Plant Inspection and Testing
|
Renewal Status |
MARCH 17, 2022 ( ACTIVE )
|
Firm Name |
ULTEIG ENGINEERS, INC.
|
Mailing Address |
3350 38TH AVE S
|
|
FARGO, ND 58104
|
Firm Phone |
(651)415-3927
|
|
 |
1.1.1
|
Policy Planning
|
1.2.1
|
Systems Planning
|
1.3.1
|
Subarea/Corridor Planning
|
1.4.1
|
Land Planning/Engineering
|
1.5.1
|
Feasibility Studies
|
1.6.1
|
Major Investment Studies
|
1.7.1
|
Traffic Demand Modeling
|
1.8.1
|
Public Involvement
|
1.9.1
|
Geographic Information System (GIS) and Data Analysis
|
2.1.1
|
Traffic Noise Analysis
|
2.3.1
|
Wetland Delineation
|
2.4.1
|
Nationwide Permit
|
2.4.2
|
Clean Water Act Sec. 404 Permits
|
2.6.2
|
Impact Evaluation Assessments (Retired Category)
|
2.6.4
|
Biological Evaluations/Assessments (Retired Category)
|
2.13.1
|
Hazardous Materials Initial Site Assessment
|
2.14.1
|
Environmental Document Preparation
|
3.2.1
|
Route Studies & Schematic Design
|
4.2.1
|
Roadway Design
|
4.4.1
|
Freeway Interchanges
|
4.5.1
|
Constructability Review
|
4.6.1
|
3-D Visualization and Animation Services
|
5.2.1
|
Bridge Design
|
5.3.1
|
Multi-Level Interchange Design
|
5.5.1
|
Bridge & Non-Bridge Class Culvert and Inlet Design
|
6.1.1
|
Routine Bridge Inspection Team Leader
|
7.1.1
|
Traffic Engineering Studies
|
7.3.1
|
Traffic Signal Timing
|
7.5.1
|
Intelligent Transportation Systems
|
8.1.1
|
Signing, Pavement Marking, And Channelization
|
8.2.1
|
Illumination
|
8.3.1
|
Signalization
|
8.4.1
|
ITS Control Systems Analysis, Design & Implementation
|
8.6.1
|
Rail-Highway Design
|
9.1.1
|
Bicycle and Pedestrian Facility Devel. (Retired Category)
|
9.2.1
|
Active Transportation Planning
|
9.3.1
|
Pedestrian Facility Design
|
9.3.2
|
Accessibility Design
|
10.1.1
|
Hydrologic Studies
|
10.2.1
|
Roadway Hydraulic Design
|
10.4.2
|
Pump Stations-Electrical
|
11.1.1
|
Roadway Construction Management And Inspection
|
11.2.1
|
Bridge Construction Management And Inspection
|
11.3.1
|
Construction Superintendent
|
11.4.1
|
Environmental Inspections
|
11.6.1
|
Construction Schedule Support-General
|
11.7.1
|
Construct. Schedule Support-Sched of Roadway Design
|
14.1.1
|
Soil Exploration
|
14.2.1
|
Geotechnical Testing
|
14.3.1
|
Transportation Foundation Studies
|
17.4.1
|
Electrical Engineering
|
17.5.1
|
Civil Engineering
|
18.2.1
|
Subsurface Utility Engineering (Utility Eng. Investigation)
|
18.3.1
|
Utility Adjustment Coordination
|
18.4.1
|
Utility Engineering
|
18.5.1
|
Utility Construction Management and Verification
|
23.2.1
|
Alternative Delivery Design & Construction Support Engineer
|
23.11.1
|
Plan Review
|
Renewal Status |
APRIL 18, 2022 ( ACTIVE )
|
Firm Name |
UNDERWOOD DRAFTING & SURVEYING, INC.
|
Mailing Address |
3404 INTERURBAN ROAD
|
|
DENISON, TX 75021
|
Firm Phone |
(903)465-2151
|
15.1.1
|
Right of Way Surveys
|
15.2.1
|
Design Survey
|
15.2.2
|
Construction Survey
|
15.3.5
|
Horizontal and Vertical Control
|
Renewal Status |
FEBRUARY 16, 2022 ( ACTIVE )
|
Firm Name |
UNINTECH CONSULTING ENGINEERS, INC
|
Mailing Address |
2431 E. EVANS RD.
|
|
SAN ANTONIO, TX 78259
|
Firm Phone |
(210)641-6003
|
2.4.2
|
Clean Water Act Sec. 404 Permits
|
3.2.1
|
Route Studies & Schematic Design
|
4.2.1
|
Roadway Design
|
5.2.1
|
Bridge Design
|
6.1.1
|
Routine Bridge Inspection Team Leader
|
6.1.2
|
Routine Bridge Inspection Project Manager
|
10.3.1
|
Bridge Hydraulic Design
|
10.4.3
|
Pump Stations-Structures
|
14.3.1
|
Transportation Foundation Studies
|
14.4.1
|
Building Foundation Studies
|
15.1.1
|
Right of Way Surveys
|
15.2.1
|
Design Survey
|
15.2.2
|
Construction Survey
|
15.3.5
|
Horizontal and Vertical Control
|
17.1.1
|
Structural Engineering
|
Renewal Status |
FEBRUARY 15, 2022 ( ACTIVE )
|
Firm Name |
UNITED ENGINEERS, INC.
|
Mailing Address |
9301 SOUTHWEST FRWY, STE 500
|
|
HOUSTON, TX 77074
|
Firm Phone |
(713)271-2900
|
|
 |
9.1.1
|
Bicycle and Pedestrian Facility Devel. (Retired Category)
|
10.1.1
|
Hydrologic Studies
|
10.2.1
|
Roadway Hydraulic Design
|
11.1.1
|
Roadway Construction Management And Inspection
|
11.2.1
|
Bridge Construction Management And Inspection
|
11.3.1
|
Construction Superintendent
|
11.4.1
|
Environmental Inspections
|
11.5.1
|
Construction Scheduling Project Manager
|
11.6.1
|
Construction Schedule Support-General
|
11.7.1
|
Construct. Schedule Support-Sched of Roadway Design
|
11.8.1
|
Construct Schedule Support-Sched Bridge & Interchange Proj
|
15.1.1
|
Right of Way Surveys
|
15.2.1
|
Design Survey
|
15.2.2
|
Construction Survey
|
15.3.5
|
Horizontal and Vertical Control
|
18.2.1
|
Subsurface Utility Engineering (Utility Eng. Investigation)
|
18.3.1
|
Utility Adjustment Coordination
|
18.4.1
|
Utility Engineering
|
18.5.1
|
Utility Construction Management and Verification
|
18.6.1
|
Utility Management & Coordination Oversight
|
Renewal Status |
FEBRUARY 23, 2022 ( ACTIVE )
|
Firm Name |
UNITED GEO TECHNOLOGIES, LLC
|
Mailing Address |
7715 MAINLAND, SUITE 110
|
|
SAN ANTONIO, TX 78250
|
Firm Phone |
(210)684-2147
|
15.3.1
|
Aerial Photogrammetry
|
|