DIVISION III - SURFACE COURSES OR PAVEMENT (Items 300 to 330)

Table of Contents

300 ASPHALTS, OILS, AND EMULSIONS
301 ASPHALT ANTISTRIPPING AGENTS
302 AGGREGATES FOR SURFACE TREATMENTS
305 SALVAGING, HAULING, AND STOCKPILING RECLAIMABLE ASPHALT PAVEMENT
310 PRIME COAT
314 EMULSIFIED ASPHALT TREATMENT
315 FOG SEAL
316 SURFACE TREATMENTS
318 HOT ASPHALT-RUBBER SURFACE TREATMENTS
320 EQUIPMENT FOR HOT MIX ASPHALT MATERIALS
330 LIMESTONE ROCK ASPHALT PAVEMENT

ITEM NO. - TITLE AND REQUIREMENTS

300 - ASPHALTS, OILS, AND EMULSIONS

SPECIFICATION REQUIREMENTS
1) Asphalt Materials should be specified in the plans for Items in which they are used.

PAYMENT DESCRIPTION
1) The asphaltic materials described in this specification will be measured and paid for in accordance with governing specifications for the Items of construction in which these materials are used.

REFERENCE ITEMS
None

Go to Top

301 - ASPHALT ANTISTRIPPING AGENTS

SPECIFICATION REQUIREMENTS
1) Method of addition for Hydrated Lime or Lime Slurry may be specified in the plans.

PAYMENT DESCRIPTION
1) Subsidiary to the various bid Items in the contract.

REFERENCE ITEMS
(520)

Go to Top

302 - AGGREGATES FOR SURFACE TREATMENTS

SPECIFICATION REQUIREMENTS
1)  Type(s) and grade(s) of aggregate must be shown on the plans.
2)  Specify Surface Aggregate Class.
3)  Specify any additives or antistrip if desired.
4)  Show on the plans if Flakiness index is to be other than 17 max.
5)  Show on the plans if Coarse Aggregate Angularity for crushed gravel is required to be other than 85% min.
6)  Show on the plans if the Water Absorption for Lightweight Aggregate is required to be different than 12.0% max.
7) For precoated aggregates, a target value for the desired percent by weight of residual bitumen coating on the aggregate can be shown on plans or can be approved by the Engineer.
8) Specify delivery location on the plans.

PAYMENT DESCRIPTION
1) The aggregates provided in accordance with this specification will be measured and paid for in accordance with governing specifications for the Items of construction in which these materials are used.

REFERENCE ITEMS
(300), (330)

Go to Top

305 - SALVAGING, HAULING, AND STOCKPILING RECLAIMABLE ASPHALT PAVEMENT

SPECIFICATION REQUIREMENTS
1) Limits, depths, and/or locations for removing existing asphaltic concrete pavement and/or  asphalt stabilized base must be shown on plans.
2 ) Show on the plans if reclaimed material is required to be other than 95% passing 2-in. sieve.
3)  Stockpile locations can be shown on plans or can be approved by the Engineer.
4)  Special stockpile directions may be shown on plans or directed by the Engineer.
5)  Plans may show sediment control fence around stockpile locations.
6) Plans may show or Engineer may approve allowing or requiring salvaged materials to be used in other construction items of the project.

PAYMENT DESCRIPTION UNITS
1) "Salvaging, Hauling, and Stockpiling Reclaimable Asphalt Pavement" CY
2) "Salvaging, Hauling, and Stockpiling Reclaimable Asphalt Pavement (Depth Specified)" SY

REFERENCE ITEMS
None

Go to Top

310 - PRIME COAT

SPECIFICATION REQUIREMENTS
1)  Limits, area, and/or locations must be shown on plans.
2)  Type and grade of bituminous material must be shown on plans.
3)  The rate of application can be shown on plans or can be as directed by the Engineer.
4) Blotter may be required at the rate specified in the plans.

PAYMENT DESCRIPTION UNITS
1) "Prime Coat (Type and Grade Specified)" GAL
2) "Prime Coat and Blotter (Type and Grade Specified)" GAL

REFERENCE ITEMS
(300), (316)

Go to Top

314 - EMULSIFIED ASPHALT TREATMENT

SPECIFICATION REQUIREMENTS
1) Limits, areas, and/or locations must be shown on the plans.
2) Type and grade of emulsified asphalt must be shown on the plans.
3) The emulsified asphalt percentage in the emulsion/water mixture can be shown on the plans or can be as directed by the Engineer.
4) When the emulsified asphalt and water mixture is incorporated into the top portion of the subbase or base course, the depth and width must be shown on the plans.
5) The rate of application can be shown on the plans or can be as directed by the Engineer.

PAYMENT DESCRIPTION UNITS
1) "Emulsified Asphalt (Type and Grade Specified)" GAL
2) "Emulsified Asphalt (Base or Subgrade Treatment) (Type and Grade Specified)" GAL
3) "Emulsified Asphalt (Erosion Control) (Type and Grade Specified)" GAL

REFERENCE ITEMS
(204), (300)

Go to Top

315 - FOG SEAL

SPECIFICATION REQUIREMENTS
1) Limits and/or locations must be shown on plans.
2) Type and grade of emulsified asphalt must be shown on plans.
3) The percent of emulsified asphalt in the emulsion/water mixture can be shown on plans or can be as directed by the Engineer.
4) The rate of application can be shown on plans or can be as directed by the Engineer.

PAYMENT DESCRIPTION UNITS
1)"Emulsified Asphalt (Type and Grade Specified)" GAL

REFERENCE ITEMS
(300), (316)

Go to Top

316 - SURFACE TREATMENTS

SPECIFICATION REQUIREMENTS
1) Specify if construction consists of a one, two, or three-course surface treatment application.
2) Limits, areas, and/or locations must be shown on the plans.
3) Type(s) and grade(s) of asphalt must be shown on the plans.
4)  If the Contractor is to supply aggregate, the type(s) and grade(s) of aggregate must be shown on the plans.
5)  If the Contractor supplies aggregate, specify if a surface aggregate class other than “B or better” is required.
6) Specify transverse variance rate, if needed.  Suggest a range of 10% (Ex. 22 -32).
7)  Specify additional roller requirements, if needed.
8) Plans may show, or Engineer may allow the use of asphalt storage tanks.
9) Any limit on aggregate haul truck size may be shown on the plans.
10) Specify start and stop dates for asphalt season.
11) The rates of application of asphalt and aggregate must be shown on the plans (for estimation purposes only).
12)  Show on the plans if the Department will furnish aggregate. If so, specify aggregate stockpile locations.
13)  Specify any requirements for removal of pavement markers.
14)  Specify if vegetation is to be removed and pavement edges are to be bladed.
15)  Specify the method of measuring asphalt (volume, weight) and may show another method of measuring weight or volume other than the default methods shown in the specification.

PAYMENT DESCRIPTION UNITS
1) "Asphalt (Type and Grade Specified)" GAL or TON
2) "Aggregate (Type, Grade and SAC Specified)" CY
3) "Loading, Hauling, and Distributing Aggregate" CY

REFERENCE ITEMS
(210), (300), (302), (520)

Go to Top

318 - HOT ASPHALT-RUBBER SURFACE TREATMENTS

SPECIFICATION REQUIREMENTS
1) Specify if construction consists of a one, two, or three-course hot asphalt-rubber surface treatment application.
2) Limits, areas, and/or locations must be shown on the plans.
3) Asphalt-Rubber Binder II or III, as defined in Item 300, must be shown on the plans.
4) If the Contractor is to supply aggregate, the type(s) and grade(s) of aggregate must be shown on the plans.
5) If the Contractor supplies aggregate, specify if a surface aggregate class other than “B” is required.
6) Specify transverse variance rate, if needed.  Suggest a range of 10% (Ex. 22 - 32.)
7) Specify additional roller requirements, if needed.
8) Any limit on aggregate haul truck size may be shown on the plans.
9) Specify start and stop dates for asphalt season.
10) The rates of application of asphalt and aggregate must be shown on the plans (for estimation purposes only).
11) Show on the plans if the Department will furnish aggregate. If so, specify aggregate stockpile locations.
12) Specify any requirements for removal of pavement markers.

PAYMENT DESCRIPTION UNITS
1) "Hot Asphalt-Rubber (Type Specified)" TON
2) "Aggregate (Type, Grade and SAC Specified)" CY
3) “Loading, Hauling, and Distributing Aggregate” CY

REFERENCE ITEMS
(210), (300), (302), (520)

Go to Top

320 - EQUIPMENT FOR HOT MIX ASPHALT MATERIALS

SPECIFICATION REQUIREMENTS
1)  If remixing equipment is desired, specify on the set of plans.
2) If the use of a motor grader is allowed, specify on the set of plans.

PAYMENT DESCRIPTION
1) Subsidiary to the various bid items in the Contract.

REFERENCE ITEMS
(520)

Go to Top

330 - LIMESTONE ROCK ASPHALT PAVEMENT

SPECIFICATION REQUIREMENTS
1)  Specify the Type (I or II) and Grade of LRA for each course.
2)  Specify surface aggregate classification requirements.
3) Specify if surface aggregate classification requirements apply to other than surface courses.
4)  Specify any additional aggregate requirements not shown in Table 1.
5)  Tack coat type and grade may be specified or as approved.
6) Additives type and rate may be specified or as approved.
7)  Show on the plans if requirements for Tex-530-C are different than Table 5.
8)  Show on the plans if windrow dumping of mixture is not allowed.
9) If a motor grader is allowed, specify on plans.
10) Specify if ride quality requirements are waived or requiring other than Type A.

PAYMENT DESCRIPTION UNITS
1) "Limestone Rock Asphalt Pavement (Type, Grade and SAC Specified)" TON

REFERENCE ITEMS 
(204), (300), (301), (320), (520), (585)

Go to Top