|
||||
|
||||
Project Description | Study Area Map | Previous East Side Studies | Project Schedule | Strategy Refinement Process | Study Participants | Working Group Meetings | I-10 East Corridor Bottleneck Study | Public Involvement | Public Meetings | Truck Survey | Let Us Know What You Think | HOV Frequently Asked Questions (FAQ's) | Newsletters Previous East Side Studies There are several major east-side arterials in addition to I-10. These arterials are not included in the study area limits. Since 1987, several studies have been conducted on portions of these major arterials. These studies include:
Not all study recommendations have been implemented. Projects are prioritized primarily by need. Study recommendations are typically broken into smaller projects and continue through the project development process, including preliminary design (schematic development), environmental analysis, right-of-way mapping and acquisition, final design, and, ultimately, construction. Depending on the project, the time from planning to construction could vary from five to fifteen years. Given the extent of the previous studies, the I-10 East Corridor Study focus was primarily on I-10 strategies. Strategies were also considered for the eastern sections of Alameda Avenue and North Loop Road that were not previously studied. Previous East Side Studies Map
|
|
© Copyright 2012, TxDOT All Rights Reserved. |
Disclaimer | Accessibility Policy | Privacy and Security Policy | Open Records | TxDOT Contacts |