Monthly State Let Construction Report For Beaumont District As Of Nov 12, 2021 Page 1 Of 4

Last Update: Friday, November 12, 2021
FTP Icon
page 1 | page 2 | page 3 | page 4

Contract Identification and InformationLengthContract AmountAmount This EstimateTotal Estimate To Date% Comp

CountyLIBERTY ETC
HighwayUS 90 ETC
From0.100 MI W OF SH 321
To0.103 MI E OF MAIN
CSJ0028-03-105
Proj IDSTP 2018(654)HES
Work TypeIMPROVE TRAFFIC SIGNALS
 
1.523965542.25981159.6099.9
NO CURRENT ESTIMATE AT TIME OF THIS RUN
Work Order07-17-18
Work Began07-09-19
Work Completed
Time Computed00-00-00
Contract Working Days143
Addl Days Granted4
Working Days Charged139
Percent Time Used94
Contractor(s)
THIRD COAST SERVICES LLC
SUBCONTRACTOR(S) FOR CCSJ: 0028-03-105
NO SUBCONTRACTORS FOR THIS CCSJ
Contract #06183033
Totals965542.250.00981159.6099.9

CountyLIBERTY
HighwayUS 90
FromAT FM 1413
To.
CSJ0028-03-107
Proj IDSTP 2021(525)HES
Work TypeSAFETY IMPROVEMENT PROJECTS
 
0.80022054430.400.000.0
CountyLIBERTY
HighwayUS 90
FromHARRIS COUNTY LINE, EAST
ToUPRR
CSJ0028-03-108
Proj IDF 2021(524)
Work TypeOVERLAY
 
7.0002829816.540.000.0
NO CURRENT ESTIMATE AT TIME OF THIS RUN
Work Order09-21-21
Work Began00-00-00
Work Completed
Time Computed00-00-00
Contract Working Days574
Addl Days Granted0
Working Days Charged0
Percent Time Used0
Contractor(s)
JAMES CONSTRUCTION GROUP, LLC
SUBCONTRACTOR(S) FOR CCSJ: 0028-03-107
NO SUBCONTRACTORS FOR THIS CCSJ
Contract #08213210
Totals24884246.940.000.000.0

CountyLIBERTY
HighwayUS 90
FromSH 146, EAST
ToS.COLBERT ST
CSJ0028-03-110
Proj IDSTP 2021(086)
Work TypePEDESTRIAN, SIDEWALKS & CURB RAMPS
 
0.806336017.0550953.7615.1
CountyLIBERTY
HighwaySH 321
FromDAYTON HIGH SCHOOL, SOUTH
ToUS 90
CSJ0593-01-131
Proj IDSTP 2021(086)
Work TypePEDESTRIAN, SIDEWALKS & CURB RAMPS
 
1.709758418.9522800.003.0
NO CURRENT ESTIMATE AT TIME OF THIS RUN
Work Order11-19-20
Work Began01-11-21
Work Completed
Time Computed00-00-00
Contract Working Days60
Addl Days Granted0
Working Days Charged16
Percent Time Used26
Contractor(s)
TRIPLE B SERVICES LLP
SUBCONTRACTOR(S) FOR CCSJ: 0028-03-110
AREA WIDE PROTECTIVE, INC. (1.42)
DOUBLE OAK EROSION, INC. (1.38)
SOWELLS ENGINEERS & CONSTRUCTORS, LLC (38.68)
TRAFFIC SYSTEMS CONSTRUCTION, INC. (0.13)
J. KRU LAND SERVICES, LLC. (0.40)
CRABTREE BARRICADE SYSTEMS, INC. (2.01)
SOUTHWEST ROAD & SAFETY CONTRACTORS, LTD. (0.59)
Contract #10203215
Totals1094436.000.0073753.766.7

CountyLIBERTY ETC
HighwayUS 90 ETC
FromAT LAYL DR
To0.1 MI E OF LAYL DR
CSJ0028-04-078
Proj IDSTP 2020(138)HES
Work TypeSAFETY IMPROVEMENT PROJECTS
 
5.0501018096.50997926.7598.0
Work Order11-20-19
Work Began01-06-20
Work Completed
Time Computed01-06-20
Contract Working Days340
Addl Days Granted0
Working Days Charged273
Percent Time Used80
Contractor(s)
VACA UNDERGROUND UTILITIES INC
SUBCONTRACTOR(S) FOR CCSJ: 0028-04-078
L&M INFRASTRUCTURE, LLC. (9.63)
Contract #10193218
Totals1018096.507560.00997926.7598.0

CountyJEFFERSON ETC
HighwayUS 90 ETC
FromAT FM 364
To.
CSJ0028-06-083
Proj IDSTP 2021(526)HES
Work TypeTRAFFIC CONTROL DEVICES
 
4.0873878702.08331628.008.5
NO CURRENT ESTIMATE AT TIME OF THIS RUN
Work Order06-22-21
Work Began00-00-00
Work Completed
Time Computed00-00-00
Contract Working Days320
Addl Days Granted0
Working Days Charged6
Percent Time Used1
Contractor(s)
THIRD COAST SERVICES LLC
SUBCONTRACTOR(S) FOR CCSJ: 0028-06-083
717 CONSTRUCTION SERVICES, LLC (3.05)
SEMPER STRIPING LLC (2.26)
Contract #05213014
Totals3878702.08293628.00331628.008.5

CountyJEFFERSON ETC
HighwayUS 90 ETC
FromS MAJOR DRIVE, EAST
ToIH 10
CSJ0028-07-058
Proj IDSTP 2021(290)HES
Work TypeSAFETY IMPROVEMENT PROJECTS
 
5.264753374.01359789.9747.7
NO CURRENT ESTIMATE AT TIME OF THIS RUN
Work Order03-01-21
Work Began04-14-21
Work Completed
Time Computed00-00-00
Contract Working Days102
Addl Days Granted0
Working Days Charged49
Percent Time Used48
Contractor(s)
TRAF-TEX, INC.
SUBCONTRACTOR(S) FOR CCSJ: 0028-07-058
ALLY GENERAL SOLUTIONS, LLC (9.55)
Contract #01213019
Totals753374.0175182.92359789.9747.7

CountyORANGE ETC
HighwayIH 10 ETC
FromJEFFERSON COUNTY LINE, EAST
To5.201 MI E OF JEFFERSON COUNTY LINE
CSJ0028-09-116
Proj IDIM 0108(181)
Work TypeSAFETY LIGHTING
 
18.56215083451.8015107305.5799.9
NO CURRENT ESTIMATE AT TIME OF THIS RUN
Work Order08-09-18
Work Began03-18-19
Work Completed
Time Computed00-00-00
Contract Working Days300
Addl Days Granted147
Working Days Charged447
Percent Time Used100
Contractor(s)
THIRD COAST SERVICES LLC
SUBCONTRACTOR(S) FOR CCSJ: 0028-09-116
SOUTH TEXAS ILLUMINATION, LLC (41.49)
AMERICAN REMEDIATION OPTIONS, INC. (1.79)
Contract #07183048
Totals15083451.8051992.4215107305.5799.9

CountyZERO COUNTIES
Highway
From
To
CSJ0028-11-210
Proj ID
Work Type
 
0.00307231.000.0
CountyORANGE
HighwayIH 10
FromAT LITTLE CYPRESS BAYOU
To(STR 002814069)AND(STR 002814068)
CSJ0028-14-100
Proj IDBR 2013(443)
Work TypeREPLACE BRIDGE AND APPROACHES
 
0.1895064499.673238930.3863.9
CountyORANGE
HighwayIH 10
FromW OF ADAMS BAYOU, EAST
ToW OF SABINE RIVER BRIDGE
CSJ0028-14-108
Proj IDIM 0108(184)
Work TypeGR, STR, BS, PVMT, SIGN
 
3.66947282929.2542143401.9589.1
CountyORANGE
HighwayIH 10
FromAT SH 87 AND T&NO RR
To(STR 002814108 & 109)
CSJ0028-14-109
Proj IDBR 2013(226)
Work TypeGR, BS, PVMT & STR
 
0.32216093789.7821295123.2699.9
Work Order03-18-14
Work Began05-30-14
Work Completed
Time Computed04-03-14
Contract Working Days679
Addl Days Granted360
Working Days Charged872
Percent Time Used83
Contractor(s)
WILLIAMS BROTHERS CONSTRUCTION CO., INC.
SUBCONTRACTOR(S) FOR CCSJ: 0028-11-210
A-1 EROSION CONTROL, LLC (0.16)
ALLSTATE SIGNAL & CONSTRUCTION, LLC (1.08)
AMERICAN REMEDIATION OPTIONS, INC. (0.16)
BORTUNCO (0.66)
DAVIS TREE EXPERTS (0.11)
HIGHWAY PAVEMENT SPECIALTIES, INC. (0.23)
MESA ROD BUSTERS, INC. (7.03)
ROADSAFE TRAFFIC SYSTEMS, INC. (0.45)
SCOTT DERR PAINTING CO, LLC (0.05)
SOUTHWEST ROAD & SAFETY CONTRACTORS, LLC (0.80)
TRAF-TEX, INC. (0.97)
ROADWAY CONSTRUCTION, LLC (0.31)
C PAVE, INC. (0.01)
NORMAN HIGHWAY CONSTRUCTORS, INC. (0.46)
CRABTREE BARRICADE SYSTEMS, INC. (0.03)
JANCO (0.98)
ASHTON SAWING AND DRILLING LLC (0.05)
RAY"S THREADING AND FAB SHOP (0.71)
GULF COAST GROUTING, INC. (0.18)
TOTAL HIGHWAY MAINTENANCE, LLC (0.45)
Contract #02143032
Totals68441218.705.4566984686.5997.8

CountyORANGE
HighwayIH 10
From0.54 MILES EAST OF FM 3247
ToSABINE RIVER BRIDGE
CSJ0028-14-091
Proj IDNH 2020(966)
Work TypeWIDEN FREEWAY
 
4.18752363934.1713809973.2226.3
Work Order08-14-20
Work Began09-16-20
Work Completed
Time Computed09-16-20
Contract Working Days940
Addl Days Granted12
Working Days Charged64
Percent Time Used6
Contractor(s)
WILLIAMS BROTHERS CONSTRUCTION CO., INC.
SUBCONTRACTOR(S) FOR CCSJ: 0028-14-091
ALLSTATE SIGNAL & CONSTRUCTION, LLC (6.62)
MESA ROD BUSTERS, INC. (1.31)
SOUTHWEST ROAD & SAFETY CONTRACTORS, LTD. (0.83)
HIGHWAY PAVEMENT SPECIALTIES, INC. (0.25)
AREA WIDE PROTECTIVE, INC. (0.42)
A R DANIEL CONSTRUCTION SERVICES, INCORPORATED (1.94)
AMERICAN REMEDIATION OPTIONS, INC. (0.44)
SCOTT DERR PAINTING CO, LLC (0.02)
TOTAL HIGHWAY MAINTENANCE, LLC (1.44)
ADCOCK 4 INVESTMENTS, LLC (0.64)
RAY"S THREADING AND FAB SHOP (0.65)
Contract #06203204
Totals52363934.171606468.6613809973.2226.3

CountyORANGE
HighwaySH 87
From0.2 MI W OF N 16TH ST, WEST
To28TH ST
CSJ0028-15-056
Proj IDSTP 2B20(172)HES
Work TypeSAFETY IMPROVEMENT PROJECTS
 
0.727537329.1566019.2112.2
NO CURRENT ESTIMATE AT TIME OF THIS RUN
Work Order09-15-20
Work Began10-20-21
Work Completed
Time Computed00-00-00
Contract Working Days41
Addl Days Granted0
Working Days Charged4
Percent Time Used9
Contractor(s)
THIRD COAST SERVICES LLC
SUBCONTRACTOR(S) FOR CCSJ: 0028-15-056
SEMPER STRIPING LLC (0.97)
WIDGEON CONSTRUCTION, INC. (112.98)
Contract #08203049
Totals537329.1566019.2166019.2112.2

CountyJASPER
HighwayUS 96
From@ FM 363
To.
CSJ0065-02-056
Proj IDF 2021(936)
Work TypeSAFETY IMPROVEMENT PROJECTS
 
0.020104464.300.000.0
NO CURRENT ESTIMATE AT TIME OF THIS RUN
Work Order09-20-21
Work Began00-00-00
Work Completed
Time Computed00-00-00
Contract Working Days17
Addl Days Granted0
Working Days Charged0
Percent Time Used0
Contractor(s)
THIRD COAST SERVICES LLC
SUBCONTRACTOR(S) FOR CCSJ: 0065-02-056
NO SUBCONTRACTORS FOR THIS CCSJ
Contract #08213273
Totals104464.300.000.000.0

CountyJEFFERSON
HighwayUS 69
FromTRAM ROAD, SOUTH
ToLNVA CANAL
CSJ0065-07-062
Proj IDNH 2019(818)
Work TypeWiden Freeway
 
2.27921735071.8518648707.4085.8
NO CURRENT ESTIMATE AT TIME OF THIS RUN
Work Order05-14-19
Work Began07-16-19
Work Completed
Time Computed00-00-00
Contract Working Days412
Addl Days Granted0
Working Days Charged411
Percent Time Used99
Contractor(s)
TEXAS MATERIALS GROUP, INC.
SUBCONTRACTOR(S) FOR CCSJ: 0065-07-062
CEN TEX HYDROSEED, INC. (0.36)
CRABTREE BARRICADE SYSTEMS, INC. (1.15)
AREA WIDE PROTECTIVE, INC. (0.22)
CREATIVE PAVING CONCEPTS, LLC (1.20)
INTECH CONTRACTING LLC (2.99)
THIRD COAST SERVICES LLC (3.87)
J & M CONTRACTING, COMPANY (5.63)
JOHN REED AND COMPANY, LLC (18.03)
MESA ROD BUSTERS, INC. (0.17)
SOUTHWEST ROAD & SAFETY CONTRACTORS, LTD. (1.60)
MIK INDUSTRIAL, LLC (0.69)
TEXAS CUTTING & CORING GP, INC. (0.30)
CREACOM, INC. (0.38)
HOUSTON SAWING & DRILLING (0.01)
JB PINNACLE GROUP, LLC (0.17)
TEXAS MATERIALS GROUP, INC. (25.51)
HIGHWAY 1 LLC (0.11)
RAGLE CONSTRUCTION, INC. (1.87)
Contract #04193009
Totals21735071.851409201.5718648707.4085.8

CountyJEFFERSON
HighwayUS 69
FromAT CHINN. RD.
To.
CSJ0065-07-068
Proj IDF 2021(876)
Work TypeSAFETY IMPROVEMENT PROJECTS
 
0.2001241805.440.000.0
NO CURRENT ESTIMATE AT TIME OF THIS RUN
Work Order09-20-21
Work Began00-00-00
Work Completed
Time Computed00-00-00
Contract Working Days71
Addl Days Granted0
Working Days Charged0
Percent Time Used0
Contractor(s)
TEXAS MATERIALS GROUP, INC.
SUBCONTRACTOR(S) FOR CCSJ: 0065-07-068
AMERICAN REMEDIATION OPTIONS, INC. (2.24)
DUSTROL, INC. (1.23)
BARRICADES UNLIMITED (3.69)
NORMAN HIGHWAY CONSTRUCTORS, INC. (33.42)
MOREAUX TRANSPORTATION SERVICES, INC. (0.95)
THIRD COAST SERVICES LLC (4.55)
Contract #08213041
Totals1241805.440.000.000.0

CountyHARDIN ETC
HighwayBU 96-F ETC
FromAT AVE J
To.
CSJ0065-14-026
Proj IDSTP 2020(781)HES
Work TypeTRAFFIC CONTROL DEVICES
 
2.0001167485.201261403.7599.9
Work Order07-21-20
Work Began10-22-20
Work Completed
Time Computed10-22-20
Contract Working Days152
Addl Days Granted0
Working Days Charged100
Percent Time Used65
Contractor(s)
TRAF-TEX, INC.
SUBCONTRACTOR(S) FOR CCSJ: 0065-14-026
NO SUBCONTRACTORS FOR THIS CCSJ
Contract #06203219
Totals1167485.2061954.051261403.7599.9

CountyHARDIN ETC
HighwayBU 96-F ETC
FromBNSF RR IN SILSBEE, SOUTH
ToUS 96 SOUTH OF SILSBEE
CSJ0065-14-028
Proj IDC 65-14-28
Work TypeSEAL COAT
 
158.65310965722.0253650.000.4
NO CURRENT ESTIMATE AT TIME OF THIS RUN
Work Order10-20-21
Work Began00-00-00
Work Completed
Time Computed00-00-00
Contract Working Days136
Addl Days Granted0
Working Days Charged0
Percent Time Used0
Contractor(s)
CLARK CONSTRUCTION OF TEXAS, INC.
SUBCONTRACTOR(S) FOR CCSJ: 0065-14-028
NO SUBCONTRACTORS FOR THIS CCSJ
Contract #09213030
Totals10965722.0253650.0053650.000.4

CountyLIBERTY
HighwayUS 59
FromSOUTH END OF CLEVELAND BYPASS
ToMONTGOMERY COUNTY LINE
CSJ0177-03-096
Proj IDNH 2012(594)
Work TypeGR, STR, BS, PVMT, SIGN, STRIPE
 
4.475100888506.7463630553.2662.9
CountyMONTGOMERY
HighwayIH 69
FromFOSTORIA ROAD, NORTH
ToLIBERTY COUNTY LINE
CSJ0177-05-113
Proj IDNH 2019(022)
Work TypeCONSTRUCT DETENTION POND
 
0.0811256328.45634547.3350.5
NO CURRENT ESTIMATE AT TIME OF THIS RUN
Work Order10-16-18
Work Began05-01-19
Work Completed
Time Computed00-00-00
Contract Working Days736
Addl Days Granted339
Working Days Charged675
Percent Time Used62
Contractor(s)
JAMES CONSTRUCTION GROUP, LLC
SUBCONTRACTOR(S) FOR CCSJ: 0177-03-096
PRIMATE CONSTRUCTION, LP (0.25)
ATS DRILLING, INC. (4.05)
CREACOM, INC. (3.80)
J. H. ODEN CONTRACTING COMPANY (0.40)
DUSTROL, INC. (0.65)
WILLOW CITY SIGN & RAIL, INC. (0.66)
SCR CIVIL CONSTRUCTION, LLC (0.03)
BOWMAN ENGINEERING & CONSULTING, INC. (7.58)
PMI PAVEMENT MARKING, LLC (0.93)
SMITH & COMPANY (3.82)
EUBANK EXCAVATION, L.L.C. (0.22)
MCNORTON DEWATERING, INC. (0.05)
MEMCO (0.00)
TORO BRAVO CONSTRUCTION, LLC (6.89)
MTAM CORPORATION (0.06)
CURB PLANET INC. (0.00)
SOUTHEAST GRINDING & GROOVING, LLC (0.00)
CHERRY CRUSHED CONCRETE (0.21)
SCOTT DERR PAINTING CO, LLC (0.10)
SAPO ENGINEERING CONSULTANTS, LLC (0.22)
ANTIGO CONSTRUCTION, INC. (0.01)
WHITE STAR CONCRETE INC (0.01)
TEXAS WALL & LANDSCAPE (0.24)
A. H. BECK FOUNDATION CO., INC. (2.23)
Contract #09183201
Totals102144835.19642802.7664265100.5962.7

CountyJEFFERSON
HighwayUS 69
FromLNVA CANAL, SOUTH
ToIH 10
CSJ0200-11-095
Proj IDNH 1802(412)
Work TypeGR, BS, STR, PVMT
 
3.62431528539.2015469930.1349.0
Work Order08-15-18
Work Began10-14-18
Work Completed
Time Computed10-14-18
Contract Working Days652
Addl Days Granted39
Working Days Charged525
Percent Time Used75
Contractor(s)
TEXAS MATERIALS GROUP, INC.
SUBCONTRACTOR(S) FOR CCSJ: 0200-11-095
HOUSTON SAWING & DRILLING (0.01)
APEX HIGHWAY SERVICES LLC (0.02)
DUSTROL, INC. (1.12)
ALLSTATE SIGNAL & CONSTRUCTION, LLC (3.56)
CPAVE, INC. (0.69)
AMERICAN REMEDIATION OPTIONS, INC. (1.79)
NORMAN HIGHWAY CONSTRUCTORS, INC. (9.42)
WEBBER BARRIER SERVICES, LLC. (5.67)
W. W. FOUNDATION DRILLING, LTD. (1.61)
CRABTREE BARRICADE SYSTEMS, INC. (1.06)
(INACTIVE)MIRE TRUCKING & SERVICES (0.12)
HB FARMER FOUNDATION, LLC (1.61)
BREDA COMPANY, INC. (0.64)
AARON CONCRETE CONTRACTORS, L.P. (6.01)
ROYAL REBAR (0.30)
JOHN WRIGHT CONSTRUCTION (0.06)
BATTEN DRILLING, INC. (0.47)
Contract #07183004
Totals31528539.20268999.4515469930.1349.0

CountyJEFFERSON
HighwayUS 69
FromSH 124 OVERPASS
ToSH 347
CSJ0200-14-089
Proj IDNH 2020(592)
Work TypeOVERLAY
 
5.3842558236.213997794.5599.9
Work Order09-18-20
Work Began03-08-21
Work Completed
Time Computed01-18-21
Contract Working Days78
Addl Days Granted0
Working Days Charged77
Percent Time Used98
Contractor(s)
TEXAS MATERIALS GROUP, INC.
SUBCONTRACTOR(S) FOR CCSJ: 0200-14-089
CPAVE, INC. (18.23)
DUSTROL, INC. (15.69)
CRABTREE BARRICADE SYSTEMS, INC. (2.98)
PINNACLE GRINDING AND GROOVING LLC (0.41)
Contract #08203066
Totals2558236.2123315.273997794.5599.9

CountyJEFFERSON
HighwayUS 69
From0.8 MILES NORTH OF SPURLOCK RD., SOUTH
ToFM 365
CSJ0200-15-021
Proj IDC 200-15-21
Work TypeOVERLAY
 
2.5403080232.240.000.0
CountyJEFFERSON
HighwayUS 69
FromSPURLOCK RD, SOUTH
ToFM 365
CSJ0200-15-026
Proj IDF 2021(472)
Work TypeSAFETY IMPROVEMENT PROJECTS
 
2.5501500558.900.000.0
CountyJEFFERSON
HighwayUS 69
FromFM 365, SOUTH
To39TH ST
CSJ0200-16-022
Proj IDC 200-16-22
Work TypeOVERLAY
 
3.4801495471.950.000.0
CountyJEFFERSON
HighwayUS 69
FromFM 365, SOUTH
To0.33 MILES SOUTH OF LAKE ARTHUR DRIVE
CSJ0200-16-026
Proj IDF 2021(468)
Work TypeSAFETY IMPROVEMENT PROJECTS
 
1.614987142.750.000.0
NO CURRENT ESTIMATE AT TIME OF THIS RUN
Work Order09-20-21
Work Began10-20-21
Work Completed
Time Computed00-00-00
Contract Working Days104
Addl Days Granted0
Working Days Charged4
Percent Time Used3
Contractor(s)
TEXAS MATERIALS GROUP, INC.
SUBCONTRACTOR(S) FOR CCSJ: 0200-15-021
AMERICAN REMEDIATION OPTIONS, INC. (0.29)
BARRICADES UNLIMITED (1.68)
CPAVE, INC. (6.98)
DUSTROL, INC. (5.45)
JB PINNACLE GROUP, LLC (21.38)
NORMAN HIGHWAY CONSTRUCTORS, INC. (15.29)
THIRD COAST SERVICES LLC (0.29)
Contract #08213218
Totals7063405.840.000.000.0

CountyJEFFERSON
HighwayUS 69
FromAT SH 73
To.
CSJ0200-16-020
Proj IDF 2022(013)
Work TypeINTERCHANGE (NEW OR RECONSTRUCTED)
 
0.58270021318.530.000.0
NO CURRENT ESTIMATE AT TIME OF THIS RUN
Work Order10-06-21
Work Began11-03-21
Work Completed
Time Computed00-00-00
Contract Working Days695
Addl Days Granted0
Working Days Charged0
Percent Time Used0
Contractor(s)
WILLIAMS BROTHERS CONSTRUCTION CO., INC.
SUBCONTRACTOR(S) FOR CCSJ: 0200-16-020
MESA ROD BUSTERS, INC. (5.71)
AMERICAN REMEDIATION OPTIONS, INC. (1.77)
BARRICADES UNLIMITED (0.64)
BATTERSON, LLP (0.39)
BORTUNCO (0.67)
BUYERS BARRICADES HOUSTON, LLC (0.18)
HIGHWAY PAVEMENT SPECIALTIES, INC. (0.18)
SCOTT DERR PAINTING CO, LLC (0.04)
TRAFFIC SYSTEMS CONSTRUCTION, INC. (2.13)
STRUCTURAL INTEGRITY GROUP LLC (0.01)
RAY"S THREADING AND FAB SHOP (0.17)
Contract #09213202
Totals70021318.530.000.000.0

page 1 | page 2 | page 3 | page 4