Monthly State Let Construction Report For Beaumont District As Of Oct 16, 2017 Page 3 Of 4

Last Update: Monday, October 16, 2017
FTP Icon
page 1 | page 2 | page 3 | page 4

Contract Identification and InformationLengthContract AmountAmount This EstimateTotal Estimate To Date% Comp

CountyJEFFERSON
HighwayVA
FromDISTRICTWIDE
To.
CSJ0920-00-117
Proj IDSTP 1502(181)
Work TypeLANDSCAPE
 
1.000718877.79672104.0093.4
Work Order07-20-15
Work Began11-16-15
Work Completed
Time Computed08-20-15
Contract Working Days186
Addl Days Granted0
Working Days Charged100
Percent Time Used53
Contractor(s)
APEX LANDSCAPE & IRRIGATION, LLC
SUBCONTRACTOR(S) FOR CCSJ: 0920-00-117
AMERICAN REMEDIATION OPTIONS, INC. (7.17)
CRABTREE BARRICADE SYSTEMS, INC. (1.28)
Contract #05153033
Totals718877.791250.00672104.0093.4

CountyJEFFERSON
HighwayVA
FromDISTRICTWIDE
To.
CSJ0920-00-118
Proj IDSTP 1602(155)
Work TypeLANDSCAPE
 
1.567706493.95676337.0095.7
NO CURRENT ESTIMATE AT TIME OF THIS RUN
Work Order08-04-16
Work Began10-01-16
Work Completed
Time Computed00-00-00
Contract Working Days225
Addl Days Granted0
Working Days Charged29
Percent Time Used12
Contractor(s)
APEX LANDSCAPE & IRRIGATION, LLC
SUBCONTRACTOR(S) FOR CCSJ: 0920-00-118
CRABTREE BARRICADE SYSTEMS, INC. (1.39)
HOLES INCORPORATED (0.00)
Contract #06163218
Totals706493.95750.00676337.0095.7

CountyJEFFERSON
HighwayVA
FromDISTRICTWIDE
To.
CSJ0920-00-119
Proj IDSTP 1702(116)
Work TypeLANDSCAPE
 
0.500624968.150.000.0
NO CURRENT ESTIMATE AT TIME OF THIS RUN
Work Order06-21-17
Work Began00-00-00
Work Completed
Time Computed00-00-00
Contract Working Days175
Addl Days Granted0
Working Days Charged0
Percent Time Used0
Contractor(s)
APEX LANDSCAPE & IRRIGATION, LLC
SUBCONTRACTOR(S) FOR CCSJ: 0920-00-119
CRABTREE BARRICADE SYSTEMS, INC. (1.00)
Contract #05173019
Totals624968.150.000.000.0

CountyNEWTON
HighwayCR
FromCR 4212 AT SABINE RIVER BRANCH
To(STR AA0507003)
CSJ0920-06-033
Proj IDBR 2017(547)
Work TypeSTR
 
0.100646004.20111910.2017.3
NO CURRENT ESTIMATE AT TIME OF THIS RUN
Work Order07-20-17
Work Began09-18-17
Work Completed
Time Computed00-00-00
Contract Working Days96
Addl Days Granted0
Working Days Charged7
Percent Time Used7
Contractor(s)
OLDCASTLE MATERIALS TEXAS, INC.
SUBCONTRACTOR(S) FOR CCSJ: 0920-06-033
AMERICAN REMEDIATION OPTIONS, INC. (2.70)
CPAVE, INC. (1.08)
HOUSTON SAWING & DRILLING (0.33)
HUNTER DEMOLITION (6.03)
AWP, INC. DBA AREA WIDE PROTECTIVE (0.82)
HEMPHILL WBE PILE DRIVING CO. (1.11)
Contract #06173225
Totals646004.20104710.20111910.2017.3

CountyORANGE
HighwayCR
FromE ROUNDBUNCH RD AT COW BAYOU
To(STR AA2690006)
CSJ0920-30-077
Proj IDBR 2014(325)
Work TypeREHAB BRIDGE AND APPROACHES
 
0.26911399710.804324371.1037.9
NO CURRENT ESTIMATE AT TIME OF THIS RUN
Work Order03-30-17
Work Began07-06-17
Work Completed
Time Computed00-00-00
Contract Working Days300
Addl Days Granted0
Working Days Charged47
Percent Time Used15
Contractor(s)
RAGLE CONSTRUCTION, INC.
SUBCONTRACTOR(S) FOR CCSJ: 0920-30-077
CRABTREE BARRICADE SYSTEMS, INC. (0.14)
HOUSTON SAWING & DRILLING (0.01)
SOUTHWEST ROAD & SAFETY CONTRACTORS, LLC (0.41)
MUSTANG COLT SERVICES, INC. (5.86)
PENINSULA MARINE, INC. (10.51)
CPAVE, INC. (0.05)
LONE STAR HIGHWAY PRODUCTS, INC. (5.10)
Contract #02173204
Totals11399710.80409752.604324371.1037.9

CountyORANGE
HighwayCS
FromOLD HWY 90 AT ANDERSON GULLY
To(STR C01835002)
CSJ0920-30-079
Proj IDBR 2014(324)
Work TypeSTR
 
0.100316837.100.000.0
NO CURRENT ESTIMATE AT TIME OF THIS RUN
Work Order09-25-17
Work Began00-00-00
Work Completed
Time Computed00-00-00
Contract Working Days50
Addl Days Granted0
Working Days Charged0
Percent Time Used0
Contractor(s)
WIDGEON CONSTRUCTION, INC.
SUBCONTRACTOR(S) FOR CCSJ: 0920-30-079
CRABTREE BARRICADE SYSTEMS, INC. (2.61)
Contract #08173048
Totals316837.100.000.000.0

CountyORANGE
HighwayCR
FromOLD HIGHWAY 90, S.OF I10 ACCESS RD.
ToEAST BANK OF NECHES RIVER
CSJ0920-30-081
Proj IDCM 2015(253)
Work TypeGR,BS,STR, PVMT,RR, SIGN
 
0.4208977087.387860190.3587.9
Work Order06-01-15
Work Began01-07-16
Work Completed
Time Computed06-17-15
Contract Working Days157
Addl Days Granted137
Working Days Charged322
Percent Time Used109
Contractor(s)
OLDCASTLE MATERIALS TEXAS, INC.
SUBCONTRACTOR(S) FOR CCSJ: 0920-30-081
A. H. BECK FOUNDATION CO., INC. (14.83)
INDUS CONSTRUCTION, L.P. (1.81)
J & M CONTRACTING, COMPANY (0.88)
RIVER CITY RAILROAD TROLLEY & TRANSIT CONSULTANTS (1.60)
CRABTREE BARRICADE SYSTEMS, INC. (0.44)
AMERICAN REMEDIATION OPTIONS, INC. (1.11)
ALLSTATE SIGNAL & CONSTRUCTION, LLC (1.90)
JA BRUMLEY ENTERPRISES, INC. DBA RAM INDUSTRIAL CONSTRUCTION (1.31)
Contract #10143215
Totals8977087.38122557.797860190.3587.9

CountyJEFFERSON
HighwayCS
FromCONCORD RD FROM SH 105
ToLUCAS DR.
CSJ0920-38-153
Proj IDHP 450(1)
Work TypeGR, STR, BS, PVMT, STRIPE, SIGNAL
 
1.78011284746.7111470191.7399.9
NO CURRENT ESTIMATE AT TIME OF THIS RUN
Work Order09-26-12
Work Began04-23-13
Work Completed
Time Computed00-00-00
Contract Working Days364
Addl Days Granted170
Working Days Charged526
Percent Time Used98
Contractor(s)
AMERICAN HOME ASSURANCE COMPANY
SUBCONTRACTOR(S) FOR CCSJ: 0920-38-153
CRABTREE BARRICADE SYSTEMS, INC. (0.39)
HEMPHILL PILE DRIVING CO., A CORP. (0.19)
DREWERY CONSTRUCTION COMPANY, INCORPORATED (0.49)
AMERICAN REMEDIATION OPTIONS, INC. (0.88)
SOLIS TRUCKING (0.56)
GARY WHITMAN MATERIALS, INC. (0.16)
ACCESS DATA SUPPLY, INC. (6.52)
VIMAC-USA, INC. (5.87)
PREMIERE DESIGN SOLUTIONS, INC. (5.87)
APAC-TEXAS, INC. (0.56)
TEX OP CONSTRUCTION, LP (0.22)
TRAFFIC CONTROL PRODUCTS (HOUSTON) (0.50)
CJ EXPRESS (1.59)
TEXAS STERLING CONSTRUCTION CO. (75.51)
ROADSAFE TRAFFIC SYSTEMS, INC. (1.02)
L D CONSTRUCTION (4.37)
AAA FLEXIBLE PIPE CLEANING COMPANY, INC. (0.22)
CPAV SPECIALTIES, LP (1.10)
WIMS ENVIRONMENTAL CONSTRUCTION, LTD. (1.12)
MESA ROD BUSTERS, INC. (0.54)
R. ORTIZ TRUCKING (1.32)
TRAFFIC SYSTEMS CONSTRUCTION, INC. (0.92)
CJ EXPRESS (5.52)
CURB PLANET INC. (0.11)
PENHALL COMPANY (0.03)
Contract #07123217
Totals11284746.710.0011470191.7399.9

CountyJEFFERSON
HighwayCS
FromON WASHINGTON BLVD, FROM LOMA LANE
ToIH-10
CSJ0920-38-187
Proj IDHP 2008(125)
Work TypePLANE, ACP
 
4.1001690881.520.000.0
NO CURRENT ESTIMATE AT TIME OF THIS RUN
Work Order09-21-17
Work Began00-00-00
Work Completed
Time Computed00-00-00
Contract Working Days60
Addl Days Granted0
Working Days Charged0
Percent Time Used0
Contractor(s)
OLDCASTLE MATERIALS TEXAS, INC.
SUBCONTRACTOR(S) FOR CCSJ: 0920-38-187
AMERICAN REMEDIATION OPTIONS, INC. (1.58)
CPAVE, INC. (12.34)
DUSTROL, INC. (6.90)
CRABTREE BARRICADE SYSTEMS, INC. (2.53)
Contract #08173234
Totals1690881.520.000.000.0

CountyJEFFERSON
HighwayCS
FromLAUREL AVENUE AT DRAINAGE DITCH
To(STR B006-78-001)
CSJ0920-38-256
Proj IDBR 2017(503)
Work TypeSTR, BASE, CONC PAV
 
0.009225289.0019630.008.7
NO CURRENT ESTIMATE AT TIME OF THIS RUN
Work Order08-08-17
Work Began09-18-17
Work Completed
Time Computed00-00-00
Contract Working Days56
Addl Days Granted0
Working Days Charged7
Percent Time Used12
Contractor(s)
NORMAN HIGHWAY CONSTRUCTORS, INC.
SUBCONTRACTOR(S) FOR CCSJ: 0920-38-256
CRABTREE BARRICADE SYSTEMS, INC. (2.93)
Contract #07173239
Totals225289.0019630.0019630.008.7

CountyCHAMBERS
HighwayVA
FromON FM 565 FROM FM 3360 TO FISHER RD
ToFM 3360 FROM CHERRY PT TO EAGLE PT
CSJ0920-39-023
Proj IDSTP 2017(422)TAPS
Work TypeGR, PVMT
 
1.733964954.45281835.0229.2
NO CURRENT ESTIMATE AT TIME OF THIS RUN
Work Order01-31-17
Work Began04-17-17
Work Completed
Time Computed00-00-00
Contract Working Days90
Addl Days Granted0
Working Days Charged60
Percent Time Used66
Contractor(s)
DEZTEX INDUSTRIAL SERVICES, LLC
SUBCONTRACTOR(S) FOR CCSJ: 0920-39-023
PERFORMANCE SILT, LLC (1.57)
W. W. FOUNDATION DRILLING, LTD. (3.71)
Contract #12163037
Totals964954.4514940.00281835.0229.2

CountyJEFFERSON
HighwayFM 365
FromAT GROUND GULLY
To.
CSJ0932-02-053
Proj IDBR 1502(424)
Work TypeREPLACE BRIDGE AND APPROACHES
 
1.0361565852.571747013.8199.9
NO CURRENT ESTIMATE AT TIME OF THIS RUN
Work Order11-12-15
Work Began10-26-16
Work Completed
Time Computed00-00-00
Contract Working Days89
Addl Days Granted15
Working Days Charged149
Percent Time Used143
Contractor(s)
OLDCASTLE MATERIALS TEXAS, INC.
SUBCONTRACTOR(S) FOR CCSJ: 0932-02-053
AMERICAN REMEDIATION OPTIONS, INC. (3.62)
CRABTREE BARRICADE SYSTEMS, INC. (1.61)
DUSTROL, INC. (0.91)
HEMPHILL WBE PILE DRIVING CO. (5.03)
CPAVE, INC. (0.17)
HOUSTON SAWING & DRILLING (0.22)
Contract #08153263
Totals1565852.570.001747013.8199.9

CountyJEFFERSON
HighwayFM 365
From0.2 MILES EAST OF IH 10, EAST
ToSH 124
CSJ0932-02-055
Proj IDSTP 2016(957)HES
Work TypeSAFETY TREAT FIXED OBJECTS
 
0.960400896.15405064.11100.0
NO CURRENT ESTIMATE AT TIME OF THIS RUN
Work Order07-13-16
Work Began10-06-16
Work Completed08-14-17
Time Computed00-00-00
Contract Working Days45
Addl Days Granted29
Working Days Charged74
Percent Time Used100
Contractor(s)
EXCAVATION & CONSTRUCTION, LLC
SUBCONTRACTOR(S) FOR CCSJ: 0932-02-055
AMERICAN REMEDIATION OPTIONS, INC. (10.47)
CRABTREE BARRICADE SYSTEMS, INC. (1.25)
Contract #04163026
Totals400896.150.00405064.11100.0

CountyCHAMBERS
HighwayFM 1405
FromFM 565, SOUTH
To1.28 MILES SOUTH OF SH 99
CSJ1024-02-044
Proj IDSTP 1502(426)
Work TypeBS, PVMT, STRIPE
 
5.11610486302.4510137920.8996.8
NO CURRENT ESTIMATE AT TIME OF THIS RUN
Work Order02-16-16
Work Began03-14-16
Work Completed
Time Computed00-00-00
Contract Working Days143
Addl Days Granted2
Working Days Charged158
Percent Time Used108
Contractor(s)
ANGEL BROTHERS HOLDINGS CORP.
SUBCONTRACTOR(S) FOR CCSJ: 1024-02-044
CRABTREE BARRICADE SYSTEMS, INC. (1.93)
WILLOW CITY SIGN & RAIL, INC. (1.20)
WIMS ENVIRONMENTAL CONSTRUCTION, LTD. (0.47)
CPAVE, INC. (2.34)
Contract #08153059
Totals10486302.450.0010137920.8996.8

CountyLIBERTY
HighwayFM 686
FromCR 623
To0.083 MI W OF CR 621
CSJ1067-01-026
Proj IDSSW 1067-1-26
Work TypeGR,BASE, PAV, STRIPE
 
2.9501690130.301485101.81100.0
NO CURRENT ESTIMATE AT TIME OF THIS RUN
Work Order08-11-16
Work Began09-12-16
Work Completed09-18-17
Time Computed00-00-00
Contract Working Days84
Addl Days Granted0
Working Days Charged81
Percent Time Used96
Contractor(s)
ANGEL BROTHERS HOLDINGS CORP.
SUBCONTRACTOR(S) FOR CCSJ: 1067-01-026
STRIPE LINES, INC. (1.61)
Contract #07163034
Totals1690130.300.001485101.81100.0

CountyHARDIN
HighwayFM 770
From1.1 MI E OF FM 1003
To0.6 MI E OF FM 787
CSJ1096-01-061
Proj IDSTP 2018(240)HES
Work TypeSAFETY TREAT FIXED OBJECTS
 
8.68199411.000.000.0
CountyTYLER
HighwayFM 1745
FromUS 287
ToFM 256
CSJ1584-01-024
Proj IDSTP 2018(241)HES
Work TypeSAFETY TREAT FIXED OBJECTS
 
13.618128945.000.000.0
NO CURRENT ESTIMATE AT TIME OF THIS RUN
Work Order00-00-00
Work Began00-00-00
Work Completed
Time Computed00-00-00
Contract Working Days38
Addl Days Granted0
Working Days Charged0
Percent Time Used0
Contractor(s)
NORMAN HIGHWAY CONSTRUCTORS, INC.
SUBCONTRACTOR(S) FOR CCSJ: 1096-01-061
NO SUBCONTRACTORS FOR THIS CCSJ
Contract #10173219
Totals228356.000.000.000.0

CountyJASPER
HighwayFM 777
FromUS 190 AT SCIENCE HALL
To1.430 MI S OF US 190
CSJ1109-01-021
Proj IDSTP 1702(510)HES
Work TypeGR,BS,ACP
 
1.490499477.500.000.0
NO CURRENT ESTIMATE AT TIME OF THIS RUN
Work Order08-16-17
Work Began00-00-00
Work Completed
Time Computed00-00-00
Contract Working Days44
Addl Days Granted0
Working Days Charged0
Percent Time Used0
Contractor(s)
DREWERY CONSTRUCTION COMPANY, INCORPORATED
SUBCONTRACTOR(S) FOR CCSJ: 1109-01-021
NO SUBCONTRACTORS FOR THIS CCSJ
Contract #07173028
Totals499477.500.000.000.0

CountyJASPER
HighwayFM 777
FromUS 190 (WEST)
To5 MILES SOUTH OF US 190 (WEST)
CSJ1109-01-023
Proj IDSTP 2017(626)HES
Work TypeSAFETY TREAT FIXED OBJECTS
 
5.000368813.00335846.1092.0
NO CURRENT ESTIMATE AT TIME OF THIS RUN
Work Order03-16-17
Work Began04-10-17
Work Completed
Time Computed00-00-00
Contract Working Days50
Addl Days Granted2
Working Days Charged58
Percent Time Used111
Contractor(s)
NORMAN HIGHWAY CONSTRUCTORS, INC.
SUBCONTRACTOR(S) FOR CCSJ: 1109-01-023
CRABTREE BARRICADE SYSTEMS, INC. (2.38)
Contract #02173207
Totals368813.000.00335846.1092.0

CountyTYLER
HighwayFM 1013
From7.75 MI E OF US 69
To9.85 MI E OF US 69
CSJ1237-01-032
Proj IDSTP 2017(814)HES
Work TypeINCREASE SUPERELEVATION
 
2.100301388.520.000.0
CountyJASPER
HighwayFM 1005
From1.482 MI W OF US 96
To1.950 MI W OF US 96
CSJ1275-01-042
Proj IDSTP 2017(815)HES
Work TypeCURVE
 
0.468156958.580.000.0
NO CURRENT ESTIMATE AT TIME OF THIS RUN
Work Order04-19-17
Work Began00-00-00
Work Completed
Time Computed00-00-00
Contract Working Days44
Addl Days Granted0
Working Days Charged0
Percent Time Used0
Contractor(s)
A. L. HELMCAMP, INC.
SUBCONTRACTOR(S) FOR CCSJ: 1237-01-032
NO SUBCONTRACTORS FOR THIS CCSJ
Contract #03173033
Totals458347.100.000.000.0

CountyNEWTON
HighwayFM 1012
FromAT BIG COW CREEK
To(STR 127701004)
CSJ1277-01-015
Proj IDBR 2016(411)
Work TypeREPLACE BRIDGE AND APPROACHES
 
0.1501777740.741851828.30100.0
NO CURRENT ESTIMATE AT TIME OF THIS RUN
Work Order00-00-00
Work Began05-03-16
Work Completed09-15-17
Time Computed00-00-00
Contract Working Days101
Addl Days Granted46
Working Days Charged202
Percent Time Used137
Contractor(s)
LONGVIEW BRIDGE AND ROAD, LTD.
SUBCONTRACTOR(S) FOR CCSJ: 1277-01-015
AMERICAN REMEDIATION OPTIONS, INC. (3.73)
CRABTREE BARRICADE SYSTEMS, INC. (0.70)
PANOLA SIGN & BARRICADE, INC. (0.40)
TEXOP CONSTRUCTION (0.39)
MAC TRANSPORTATION, LTD, L.L.P. (0.80)
SOUTHWEST ENVIRONMENT SERVICES LLC (1.13)
NAMCO, INC. (0.89)
Contract #02163228
Totals1777740.740.001851828.30100.0