Monthly State Let Construction Report For Paris District As Of Mar 13, 2024 Page 4 Of 4

Last Update: Wednesday, March 13, 2024
FTP Icon
page 1 | page 2 | page 3 | page 4

Contract Identification and InformationLengthContract AmountAmount This EstimateTotal Estimate To Date% Comp

CountyLAMAR
HighwayCR
FromCR 26320
ToAT MORRISON CREEK
CSJ0901-29-092
Proj IDBR 2022(837)
Work TypeBRIDGE REPLACEMENT
 
0.068403868.00102600.0025.4
CountyDELTA
HighwayFM 2068
FromFM 2068
ToAT E FORK JERNIGAN CREEK
CSJ1097-05-009
Proj IDBR 2023(930)
Work TypeBRIDGE REPLACEMENT
 
0.2231086059.72391932.5036.0
Work Order07-13-23
Work Began08-23-23
Work Completed
Time Computed08-14-23
Contract Working Days115
Addl Days Granted0
Working Days Charged86
Percent Time Used74
Contractor(s)
HIGHWAY 19 CONSTRUCTION LLC
SUBCONTRACTOR(S) FOR CCSJ: 0901-29-092
FLEX SUPPLY, LLC (1.12)
PEACHTREE CONSTRUCTION, LTD. (8.49)
KING GEORGE TRAFFIC SOLUTIONS LLC (0.63)
A. E. MOORE CONSTRUCTION, INC. (2.50)
Contract #06233041
Totals1489927.7286340.00494532.5033.1

CountyLAMAR
HighwayVA
FromVARIOUS LOCATIONS
To.
CSJ0901-29-102
Proj IDC 901-29-102
Work TypeOVERLAY
 
297263.0018402.006.1
Work Order01-11-24
Work Began02-20-24
Work Completed
Time Computed02-12-24
Contract Working Days64
Addl Days Granted0
Working Days Charged3
Percent Time Used4
Contractor(s)
12TWELVE ROAD AND BRIDGE LLC
SUBCONTRACTOR(S) FOR CCSJ: 0901-29-102
NO SUBCONTRACTORS FOR THIS CCSJ
Contract #12233224
Totals297263.0018402.0018402.006.1

CountyRAINS
HighwayCR
FromCR 1495
ToAT WOODBURY CREEK
CSJ0901-30-018
Proj IDBR 2022(699)
Work TypeBRIDGE REPLACEMENT
 
0.060424043.000.000.0
NO CURRENT ESTIMATE AT TIME OF THIS RUN
Work Order01-04-24
Work Began00-00-00
Work Completed
Time Computed03-04-24
Contract Working Days56
Addl Days Granted0
Working Days Charged0
Percent Time Used0
Contractor(s)
TRUE ROADS CONSTRUCTION, LLC
SUBCONTRACTOR(S) FOR CCSJ: 0901-30-018
DUSTIN ALLEN, INC. (7.34)
FLEX SUPPLY, LLC (1.06)
J. H. ODEN CONTRACTING COMPANY (2.42)
M & D FOUNDATION DRILLING INDUSTRIES, INC. (14.73)
Contract #12233222
Totals424043.000.000.000.0

CountyFANNIN ETC
HighwayCR
FromCR 3210
ToAT BULLARD CREEK
CSJ0901-32-103
Proj IDBR 2022(463)
Work TypeBRIDGE REPLACEMENT
 
0.2802295795.011415503.8061.6
Work Order10-12-23
Work Began10-26-23
Work Completed
Time Computed11-13-23
Contract Working Days310
Addl Days Granted0
Working Days Charged69
Percent Time Used22
Contractor(s)
THK CONSTRUCTION LLC
SUBCONTRACTOR(S) FOR CCSJ: 0901-32-103
SUPERIOR TRAFFIC CONTROL, LLC (0.57)
MORRIS COUNTY CONTRACTORS, L.L.C. (5.82)
PEACHTREE CONSTRUCTION, LTD. (1.99)
SOUTHWEST ENVIRONMENT SERVICES LLC (0.69)
WOLFE CONSTRUCTION GROUP, INCORPORATED (0.54)
WYLIE DRILLING & DRAINAGE, INC. (8.23)
DFW REBAR, INC. (0.00)
Contract #09233232
Totals2295795.01344830.091415503.8061.6

CountyHUNT
HighwayFM 35
FromEAST OF CHESTNUT COURT
ToCREEK DRIVE
CSJ1017-03-035
Proj IDF 2023(059)
Work TypeREHABILITATION OF EXISTING ROAD
 
0.5705020844.20594680.3611.8
CountyHUNT
HighwayFM 2642
FromFM 35
ToSH 66
CSJ2658-01-013
Proj IDF 2023(058)
Work TypeWIDEN NON-FREEWAY
 
25023674.274894388.1919.5
Work Order05-10-23
Work Began06-21-23
Work Completed
Time Computed06-09-23
Contract Working Days495
Addl Days Granted0
Working Days Charged152
Percent Time Used30
Contractor(s)
HARPER BROTHERS CONSTRUCTION LLC
SUBCONTRACTOR(S) FOR CCSJ: 1017-03-035
BUYERS BARRICADES, INC. (0.34)
ROAD SOLUTIONS L.L.C. (1.02)
AMERICAN CONCRETE TRUCKING, LLC (0.23)
HB FARMER FOUNDATION, LLC (1.77)
DUSTROL, INC. (0.95)
SCOTT DERR PAINTING CO, LLC (0.48)
MARCOMS CONSTRUCTION LLC (0.24)
USA SWPPP INSPECTIONS, INC.DBA USA EROSION (1.25)
TOR TEXAS, LLC (0.03)
KING GEORGE TRAFFIC SOLUTIONS LLC (0.93)
FREIGHT OPERATION SERVICES, LLC, DBA FOS BROKERAGE SERVICES (1.07)
REYNOLDS ASPHALT & CONSTRUCTION COMPANY (13.67)
RAILPROS FIELD SERVICES, INC. (0.04)
ACT SAW CUTTING & REMOVAL (0.23)
TEXAS AUGER BORING LLC (0.29)
IRON CONCRETE CONSTRUCTION COMPANY INC (2.22)
Contract #01233002
Totals30044518.47200768.895489068.5518.2

CountyHUNT
HighwayFM 1563
FromSH 50
ToFM 2655
CSJ1097-03-016
Proj IDC 1097-3-16
Work TypeREHABILITATION OF EXISTING ROAD
 
2.7123396610.441129259.6733.2
CountyHUNT
HighwayFM 2655
FromSH 11
ToFM 1563
CSJ2946-01-005
Proj IDC 2946-1-5
Work TypeREHABILITATION OF EXISTING ROAD
 
0.078182441.8144477.7624.3
Work Order07-13-23
Work Began10-16-23
Work Completed
Time Computed10-11-23
Contract Working Days162
Addl Days Granted0
Working Days Charged55
Percent Time Used33
Contractor(s)
SAMMY GIST ENTERPRISES, INC.
SUBCONTRACTOR(S) FOR CCSJ: 1097-03-016
CATOCON, INC. (2.23)
AWP SAFETY (1.18)
MOJICA CONSTRUCTION LLC (17.86)
A. E. MOORE CONSTRUCTION, INC. (1.83)
CHEROKEE SERVICES (0.19)
STRIPING TECHNOLOGY, L.P. (3.37)
SOUTHERN CROSS CONTRACTORS, LLC (4.62)
Contract #06233023
Totals3579052.25375410.441173737.4332.7

CountyHUNT
HighwaySH 276
From0.042 MILES EAST OF FM 36
ToSH 34
CSJ1290-07-001
Proj IDC 1290-7-1
Work TypeNEW LOCATION NON-FREEWAY
 
3.17714191646.9013320625.3295.6
Work Order11-19-20
Work Began01-08-21
Work Completed
Time Computed12-21-20
Contract Working Days384
Addl Days Granted0
Working Days Charged583
Percent Time Used151
Contractor(s)
RPM XCONSTRUCTION, LLC
SUBCONTRACTOR(S) FOR CCSJ: 1290-07-001
DFW REBAR, INC. (0.44)
COPPELL CONSTRUCTION CO., INC. (7.87)
J. H. ODEN CONTRACTING COMPANY (1.13)
DALLAS LITE AND BARRICADE, INC. (0.31)
ACT SAW CUTTING & REMOVAL (0.19)
STRIPING TECHNOLOGY, L.P. (0.59)
AREA WIDE PROTECTIVE, INC. (0.43)
DUSTROL, INC. (0.50)
FORTSON CONTRACTING, INC. (0.17)
TOR TEXAS, LLC (0.22)
TEXAS MATERIALS GROUP, INC. (29.29)
SCOTT DERR PAINTING CO, LLC (0.12)
WYLIE DRILLING & DRAINAGE, INC. (0.87)
NORTH TEXAS TRAFFIC SYSTEMS CONSTRUCTION (4.34)
STOIC CIVIL CONSTRUCTION, INC. (1.05)
ECC TRUCKING LLC (0.14)
FREIGHT OPERATION SERVICES, LLC, DBA FOS BROKERAGE SERVICES (0.28)
BROWN & SONS CONSTRUCTION COMPANY LLC (1.86)
GARY A. CRAIN, INC. (0.02)
LOLLAR CONSTRUCTION GROUP LLC (1.57)
PINNACLE GRINDING AND GROOVING LLC (0.10)
SOUTHEAST GRINDING AND GROOVING LLC (0.10)
WEST TEXAS ROCK RESOURCES, LLC (0.03)
Contract #10203004
Totals14191646.900.0013320625.3295.6

CountyLAMAR
HighwayFM 1507
FromSH 19/CHURCH ST
To0.8 MI N OF LOOP 286
CSJ1452-01-018
Proj IDSTP 2023(479)HES
Work TypeSAFETY IMPROVEMENT PROJECTS
 
1480238.251393638.7894.1
Work Order03-27-23
Work Began05-26-23
Work Completed
Time Computed05-26-23
Contract Working Days160
Addl Days Granted0
Working Days Charged127
Percent Time Used79
Contractor(s)
HIGHWAY 19 CONSTRUCTION LLC
SUBCONTRACTOR(S) FOR CCSJ: 1452-01-018
WITHERS CONSTRUCTION, LLC (3.79)
TRAFFIC HIGHWAY MAINTENANCE, LLC (0.77)
A. E. MOORE CONSTRUCTION, INC. (2.73)
LINEAR TRAFFIC MARKINGS LLC (0.33)
Contract #02233233
Totals1480238.255000.001393638.7894.1

CountyLAMAR
HighwayUS 82
FromBU 82H W
ToBU 82H E
CSJ1690-01-127
Proj IDSTP 2021(612)HES
Work TypeSAFETY IMPROVEMENT PROJECTS
 
6.8691470178.401742240.7599.9
CountyLAMAR
HighwayUS 271
FromBU 82-H
ToSL 286
CSJ1690-01-128
Proj IDSTP 2021(612)HES
Work TypeSAFETY IMPROVEMENT PROJECTS
 
1.081937036.60840231.0489.6
CountyLAMAR
HighwaySL 286
FromUS 82
ToUS 271
CSJ1690-01-129
Proj IDSTP 2021(612)HES
Work TypeSAFETY IMPROVEMENT PROJECTS
 
7.565785069.00548572.7269.8
Work Order07-20-21
Work Began11-08-21
Work Completed
Time Computed08-19-21
Contract Working Days251
Addl Days Granted0
Working Days Charged357
Percent Time Used142
Contractor(s)
HIGHWAY 19 CONSTRUCTION LLC
SUBCONTRACTOR(S) FOR CCSJ: 1690-01-127
STRIPING TECHNOLOGY, L.P. (0.56)
SOUTHERN CROSS CONTRACTORS, LLC (25.75)
FLEX SUPPLY, LLC (0.95)
A. E. MOORE CONSTRUCTION, INC. (1.43)
Contract #06213216
Totals3192284.000.003131044.5199.9

CountyLAMAR
HighwayUS 82
FromFM 79
ToKIAMICHI RAILROAD
CSJ1690-01-134
Proj IDF 2022(126)
Work TypeOVERLAY
 
0.9002962393.902924087.1499.4
Work Order12-16-21
Work Began12-12-22
Work Completed
Time Computed01-17-22
Contract Working Days110
Addl Days Granted0
Working Days Charged140
Percent Time Used127
Contractor(s)
HIGHWAY 19 CONSTRUCTION LLC
SUBCONTRACTOR(S) FOR CCSJ: 1690-01-134
FLEX SUPPLY, LLC (0.64)
STRIPING TECHNOLOGY, L.P. (2.97)
RICHARD DRAKE CONSTRUCTION COMPANY, L.P. (13.54)
TEXOP CONSTRUCTION (0.87)
SOUTHERN CROSS CONTRACTORS, LLC (0.53)
WOLFE CONSTRUCTION GROUP, INCORPORATED (0.36)
SKIDABRADER GROUP LLC (2.17)
Contract #11213213
Totals2962393.901955.002924087.1499.4

CountyFANNIN
HighwayFM 1753
FromFM 1753
ToAT BRUSHY CREEK
CSJ1709-02-021
Proj IDBR 2024(811)
Work TypeBRIDGE REPLACEMENT
 
0.3602948142.080.000.0
NO CURRENT ESTIMATE AT TIME OF THIS RUN
Work Order00-00-00
Work Began00-00-00
Work Completed
Time Computed00-00-00
Contract Working Days69
Addl Days Granted0
Working Days Charged0
Percent Time Used0
Contractor(s)
HIGHWAY 19 CONSTRUCTION LLC
SUBCONTRACTOR(S) FOR CCSJ: 1709-02-021
NO SUBCONTRACTORS FOR THIS CCSJ
Contract #03243033
Totals2948142.080.000.000.0

CountyDELTA
HighwayFM 2675
FromLAMAR COUNTY LINE
ToFM 128
CSJ2003-03-007
Proj IDC 2003-3-7
Work TypeREHABILITATION OF EXISTING ROAD
 
2.3621592112.641810330.6699.9
Work Order03-16-22
Work Began04-21-22
Work Completed
Time Computed04-15-22
Contract Working Days140
Addl Days Granted19
Working Days Charged159
Percent Time Used100
Contractor(s)
SAMMY GIST ENTERPRISES, INC.
SUBCONTRACTOR(S) FOR CCSJ: 2003-03-007
CATOCON, INC. (1.83)
HIGHWAY 19 CONSTRUCTION LLC (18.01)
JM YANEZ CONSTRUCTION, INC. (11.83)
LYON BARRICADE & CONSTRUCTION CO. (0.79)
J. H. ODEN CONTRACTING COMPANY (2.07)
TOTAL HIGHWAY MAINTENANCE, LLC (2.54)
SOUTHERN CROSS CONTRACTORS, LLC (3.62)
A. K. GILLIS & SONS, LLC (0.31)
RICHARD DRAKE CONSTRUCTION COMPANY, L.P. (2.84)
Contract #02223012
Totals1592112.640.001810330.6699.9

CountyRED RIVER
HighwayFM 2120
FromFM 2573
ToCR 2235
CSJ2041-01-018
Proj IDF 2023(957)
Work TypeREHABILITATION OF EXISTING ROAD
 
3.0343270033.74723131.3222.1
CountyRED RIVER
HighwayFM 2120
FromCR 2235
ToSH 37
CSJ2947-03-008
Proj IDF 2023(957)
Work TypeREHABILITATION OF EXISTING ROAD
 
6.3466528157.511880957.7228.8
Work Order07-26-23
Work Began10-24-23
Work Completed
Time Computed10-24-23
Contract Working Days366
Addl Days Granted0
Working Days Charged59
Percent Time Used16
Contractor(s)
A. K. GILLIS & SONS, LLC
SUBCONTRACTOR(S) FOR CCSJ: 2041-01-018
WITHERS CONSTRUCTION, LLC (7.32)
STRIPING TECHNOLOGY, L.P. (2.94)
SOUTHERN CROSS CONTRACTORS, LLC (0.84)
PANOLA SIGN & BARRICADE, INC. (0.48)
A. E. MOORE CONSTRUCTION, INC. (2.70)
BAHENA CONSTRUCTION CO.,INC. (5.46)
ANCHOR CONTRACTING, LLC (0.64)
Contract #06233415
Totals9798191.25273406.472604089.0426.5

CountyHUNT
HighwaySH 11
FromFM 2655
ToSH 24
CSJ2139-04-023
Proj IDF 2024(044)
Work TypeWIDEN NON-FREEWAY
 
4.53411405903.300.000.0
NO CURRENT ESTIMATE AT TIME OF THIS RUN
Work Order10-23-23
Work Began00-00-00
Work Completed
Time Computed01-22-24
Contract Working Days288
Addl Days Granted0
Working Days Charged0
Percent Time Used0
Contractor(s)
D. L. LENNON INCORPORATED - CONTRACTOR
SUBCONTRACTOR(S) FOR CCSJ: 2139-04-023
CATOCON, INC. (0.30)
INDUSTRIAL FABRICS, INC. (0.00)
J. H. ODEN CONTRACTING COMPANY (2.15)
PANOLA SIGN & BARRICADE, INC. (0.45)
RK HALL, LLC (52.52)
SOUTHERN CROSS CONTRACTORS, LLC (2.21)
TEXOP CONSTRUCTION (0.27)
TEXAS HIGHWAY MAINTENANCE, LLC (2.49)
WEST TEXAS ROCK RESOURCES, LLC (0.08)
MOJICA CONSTRUCTION LLC (9.63)
Contract #09233013
Totals11405903.300.000.000.0

CountyGRAYSON
HighwayFM 1417
FromUS 82
ToTAYLOR STREET
CSJ2455-01-031
Proj IDSTP 1902(268)
Work TypeWIDEN NON-FREEWAY
 
1.37912944762.5213840883.0699.9
CountyGRAYSON
HighwayFM 1417
FromTAYLOR STREET
ToSH 56
CSJ2455-01-034
Proj IDSTP 1902(268)
Work TypeWIDEN NON-FREEWAY
 
1.59718445060.6418820499.4199.9
Work Order12-06-19
Work Began02-25-20
Work Completed
Time Computed01-06-20
Contract Working Days767
Addl Days Granted3
Working Days Charged800
Percent Time Used103
Contractor(s)
ZACHRY CONSTRUCTION CORPORATION
SUBCONTRACTOR(S) FOR CCSJ: 2455-01-031
PANOLA SIGN & BARRICADE, INC. (0.06)
FARR FOUNDATION, INC. (1.17)
NORTH TEXAS CONTRACTING, INC. (20.72)
BARRICADES UNLIMITED (1.02)
WYLIE DRILLING & DRAINAGE, INC. (0.44)
RPM XCONSTRUCTION, LLC (4.43)
ELITE ASPHALT, L.L.C. (0.56)
A. E. MOORE CONSTRUCTION, INC. (0.42)
CIRCLE H BORING, LLC (0.08)
PREMIER PAVING, LTD. (9.75)
W.O.E. CONSTRUCTION, INC. (0.30)
HIGHWAY PAVEMENT SPECIALTIES, INC. (0.01)
TORO BRAVO CONSTRUCTION, LLC (0.02)
ROYAL REBAR (0.85)
WITHERS CONSTRUCTION, LLC (0.11)
VISTA RIDGE CONCRETE PUMPING, INC. (0.04)
HERDEZ TRUCKING, INC. (2.46)
CORONADO R. CONSTRUCTION, LLC (0.58)
PENHALL COMPANY (0.03)
NORTH TEXAS TRAFFIC SYSTEMS CONSTRUCTION (4.01)
INLET STRUCTURE SPECIALTIES LTD. (0.00)
INLET STRUCTURES SPECIALTIES (0.90)
ACT SAW CUTTING & REMOVAL (0.29)
REYNOLDS ASPHALT & CONSTRUCTION COMPANY (6.77)
H TORRES TRUCKING, L.L.C. (1.37)
TRP CONSTRUCTION GROUP, LLC (0.48)
GOOD EARTH CORPORATION (0.12)
SOUTHEAST GRINDING AND GROOVING LLC (0.01)
SOUTHERN CROSS CONTRACTORS, LLC (0.10)
Contract #11193202
Totals31389823.16351566.8232661382.4799.9

CountyRED RIVER
HighwayFM 1487
FromFM 910
ToFM 412
CSJ2800-01-010
Proj IDF 2B23(054)
Work TypeREHABILITATION OF EXISTING ROAD
 
5.7876523289.63948696.0714.5
CountyRED RIVER
HighwayFS 1487
FromFM 1487
ToEND OF STATE MNT
CSJ2800-02-004
Proj IDC 2800-2-4
Work TypeREHABILITATION OF EXISTING ROAD
 
0.205232932.429097.203.9
Work Order09-07-23
Work Began01-02-24
Work Completed
Time Computed01-02-24
Contract Working Days304
Addl Days Granted0
Working Days Charged29
Percent Time Used9
Contractor(s)
A. K. GILLIS & SONS, LLC
SUBCONTRACTOR(S) FOR CCSJ: 2800-01-010
CHEROKEE SERVICES (0.16)
ANCHOR CONTRACTING, LLC (0.37)
BAHENA CONSTRUCTION CO.,INC. (9.99)
MURRAY CONSTRUCTION (0.62)
PANOLA SIGN & BARRICADE, INC. (0.48)
DUSTIN ALLEN, INC. (1.20)
STRIPING TECHNOLOGY, L.P. (2.85)
WITHERS CONSTRUCTION, LLC (3.46)
Contract #08233234
Totals6756222.05914577.27957793.2714.1

CountyHUNT
HighwayFM 2649
FromIH 30
ToFM 1567
CSJ2876-01-006
Proj IDC 2876-1-6
Work TypeREHABILITATION OF EXISTING ROAD
 
8.4106681139.874896629.3773.2
Work Order11-16-22
Work Began02-15-23
Work Completed
Time Computed02-14-23
Contract Working Days303
Addl Days Granted16
Working Days Charged193
Percent Time Used60
Contractor(s)
D. L. LENNON INCORPORATED - CONTRACTOR
SUBCONTRACTOR(S) FOR CCSJ: 2876-01-006
J. H. ODEN CONTRACTING COMPANY (2.03)
MOJICA CONSTRUCTION LLC (8.25)
TEXANA LAND & ASPHALT, INC. (2.63)
WIMS ENVIRONMENTAL CONSTRUCTION, LTD. (0.27)
WITHERS CONSTRUCTION, LLC (1.43)
TRAFFIC HIGHWAY MAINTENANCE, LLC (0.34)
TRP CONSTRUCTION GROUP, LLC (1.84)
Contract #10223206
Totals6681139.87643332.424896629.3773.2

page 1 | page 2 | page 3 | page 4