Contract Identification and Information | Length | Contract Amount | Amount This Estimate | Total Estimate To Date | % Comp |
|
County | HUNT |
Highway | US0069 |
From | VARIOUS LOCATIONS |
To | IN HUNT & RAINS COUNTIES |
CSJ | 6447-22-001 |
Proj ID | MMC - 644722001 |
Work Type | DENSE GRADED HOT MIX |
|
| 0.010 | 439560.00 | | 45597.02 | 10.3 |
NO CURRENT ESTIMATE AT TIME OF THIS RUN |
Work Order | 00-00-00 |
Work Began | 10-11-23 |
Work Completed | |
Time Computed | 00-00-00 |
Contract Working Days | 120 |
Addl Days Granted | 120 |
Working Days Charged | 173 |
Percent Time Used | 72 |
Contractor(s) |
RK HALL, LLC |
SUBCONTRACTOR(S) FOR CCSJ: 6447-22-001 NO SUBCONTRACTORS FOR THIS CCSJ
|
Contract # | 08234225 |
| Totals | 439560.00 | 0.00 | 45597.02 | 10.3 |
|
County | HOPKINS |
Highway | SH0011 |
From | VARIOUS LOCATIONS IN THE |
To | PARIS DISTRICT |
CSJ | 6447-67-001 |
Proj ID | MMC - 644767001 |
Work Type | DE-ICING SALT |
|
| 0.010 | 329771.80 | | 34554.05 | 10.4 |
NO CURRENT ESTIMATE AT TIME OF THIS RUN |
Work Order | 00-00-00 |
Work Began | 10-01-23 |
Work Completed | |
Time Computed | 00-00-00 |
Contract Working Days | 182 |
Addl Days Granted | 182 |
Working Days Charged | 183 |
Percent Time Used | 50 |
Contractor(s) |
NSG LOGISTICS, LLC |
SUBCONTRACTOR(S) FOR CCSJ: 6447-67-001 NO SUBCONTRACTORS FOR THIS CCSJ
|
Contract # | 08234226 |
| Totals | 329771.80 | 0.00 | 34554.05 | 10.4 |
|
County | GRAYSON |
Highway | US0075 |
From | VARIOUS LOCATIONS IN THE |
To | PARIS DISTRICT |
CSJ | 6447-73-001 |
Proj ID | MMC - 644773001 |
Work Type | AGGREGATE |
|
| 0.010 | 2055511.00 | | 316760.15 | 15.4 |
NO CURRENT ESTIMATE AT TIME OF THIS RUN |
Work Order | 00-00-00 |
Work Began | 10-27-23 |
Work Completed | |
Time Computed | 00-00-00 |
Contract Working Days | 182 |
Addl Days Granted | 0 |
Working Days Charged | 157 |
Percent Time Used | 86 |
Contractor(s) |
RK HALL, LLC |
SUBCONTRACTOR(S) FOR CCSJ: 6447-73-001 NO SUBCONTRACTORS FOR THIS CCSJ
|
Contract # | 09234218 |
| Totals | 2055511.00 | 239119.27 | 316760.15 | 15.4 |
|
County | GRAYSON |
Highway | US0082 |
From | VARIOUS LOCATIONS IN |
To | GRAYSON AND FANNIN COUNTY |
CSJ | 6449-31-001 |
Proj ID | RMC - 644931001 |
Work Type | METAL BEAM GUARD FENCE REPAIR |
|
| 0.010 | 548277.50 | | 40654.38 | 7.4 |
NO CURRENT ESTIMATE AT TIME OF THIS RUN |
Work Order | 00-00-00 |
Work Began | 02-01-24 |
Work Completed | |
Time Computed | 00-00-00 |
Contract Working Days | 365 |
Addl Days Granted | 0 |
Working Days Charged | 60 |
Percent Time Used | 16 |
Contractor(s) |
MARCOM'S MOWING SERVICE, LLC |
SUBCONTRACTOR(S) FOR CCSJ: 6449-31-001 NO SUBCONTRACTORS FOR THIS CCSJ
|
Contract # | 11234216 |
| Totals | 548277.50 | 1.00 | 40654.38 | 7.4 |
|
County | FANNIN |
Highway | US0082 |
From | VARIOUS LOCATIONS |
To | IN FANNIN COUNTY |
CSJ | 6450-35-001 |
Proj ID | RMC - 645035001 |
Work Type | TRAFFIC CONTROL SERVICES |
|
| 0.010 | 599901.00 | | 175515.90 | 29.2 |
NO CURRENT ESTIMATE AT TIME OF THIS RUN |
Work Order | 00-00-00 |
Work Began | 11-01-23 |
Work Completed | |
Time Computed | 00-00-00 |
Contract Working Days | 365 |
Addl Days Granted | 0 |
Working Days Charged | 152 |
Percent Time Used | 41 |
Contractor(s) |
RHINO EQUITY, LLC |
SUBCONTRACTOR(S) FOR CCSJ: 6450-35-001 NO SUBCONTRACTORS FOR THIS CCSJ
|
Contract # | 09234031 |
| Totals | 599901.00 | 50920.00 | 175515.90 | 29.2 |
|
County | HUNT |
Highway | IH0030 |
From | VARIOUS LOCATIONS IN THE |
To | PARIS DISTRICT |
CSJ | 6452-07-001 |
Proj ID | MMC - 645207001 |
Work Type | ROCK/RIPRAP |
|
| 0.010 | 582000.00 | | 45796.40 | 7.8 |
NO CURRENT ESTIMATE AT TIME OF THIS RUN |
Work Order | 00-00-00 |
Work Began | 12-01-23 |
Work Completed | |
Time Computed | 00-00-00 |
Contract Working Days | 182 |
Addl Days Granted | 0 |
Working Days Charged | 122 |
Percent Time Used | 67 |
Contractor(s) |
TOUCHSTONE RESOURCES, LLC |
SUBCONTRACTOR(S) FOR CCSJ: 6452-07-001 NO SUBCONTRACTORS FOR THIS CCSJ
|
Contract # | 10234022 |
| Totals | 582000.00 | 26118.30 | 45796.40 | 7.8 |
|
County | RED RIVER |
Highway | FM1701 |
From | VARIOUS LOCATIONS IN |
To | RED RIVER AND LAMAR CO. |
CSJ | 6453-47-001 |
Proj ID | RMC - 645347001 |
Work Type | CROSS DRAINAGE STRUCTURE REPAIR |
|
| 0.010 | 853971.00 | | 0.00 | 0.0 |
NO CURRENT ESTIMATE AT TIME OF THIS RUN |
Work Order | 00-00-00 |
Work Began | 00-00-00 |
Work Completed | |
Time Computed | 00-00-00 |
Contract Working Days | 96 |
Addl Days Granted | 0 |
Working Days Charged | 0 |
Percent Time Used | 0 |
Contractor(s) |
RB CONTRACTING, LLC |
SUBCONTRACTOR(S) FOR CCSJ: 6453-47-001 NO SUBCONTRACTORS FOR THIS CCSJ
|
Contract # | 04244005 |
| Totals | 853971.00 | 0.00 | 0.00 | 0.0 |
|
County | HOPKINS |
Highway | SH0019 |
From | VARIOUS LOCATIONS IN |
To | HOPKINS AND FRANKLIN COUNTIES |
CSJ | 6454-53-001 |
Proj ID | RMC - 645453001 |
Work Type | TRAFFIC CONTROL SERVICES |
|
| 0.010 | 1246000.00 | | 233937.50 | 18.7 |
NO CURRENT ESTIMATE AT TIME OF THIS RUN |
Work Order | 00-00-00 |
Work Began | 01-01-24 |
Work Completed | |
Time Computed | 00-00-00 |
Contract Working Days | 365 |
Addl Days Granted | 0 |
Working Days Charged | 91 |
Percent Time Used | 24 |
Contractor(s) |
CATOCON, INC. |
SUBCONTRACTOR(S) FOR CCSJ: 6454-53-001 NO SUBCONTRACTORS FOR THIS CCSJ
|
Contract # | 11234217 |
| Totals | 1246000.00 | 121980.00 | 233937.50 | 18.7 |
|
County | LAMAR |
Highway | BU0271B |
From | VARIOUS LOCATIONS IN THE |
To | PARIS DISTRICT |
CSJ | 6455-77-001 |
Proj ID | MMC - 645577001 |
Work Type | HOT-MIX COLD-LAID |
|
| 0.010 | 1525575.00 | | 493727.61 | 32.3 |
NO CURRENT ESTIMATE AT TIME OF THIS RUN |
Work Order | 00-00-00 |
Work Began | 01-11-24 |
Work Completed | |
Time Computed | 00-00-00 |
Contract Working Days | 182 |
Addl Days Granted | 0 |
Working Days Charged | 81 |
Percent Time Used | 44 |
Contractor(s) |
RICHARD DRAKE CONSTRUCTION COMPANY, L.P. |
SUBCONTRACTOR(S) FOR CCSJ: 6455-77-001 NO SUBCONTRACTORS FOR THIS CCSJ
|
Contract # | 11234025 |
| Totals | 1525575.00 | 116646.08 | 493727.61 | 32.3 |
|
County | GRAYSON |
Highway | US0075 |
From | VARIOUS LOCATIONS IN |
To | GRAYSON COUNTY |
CSJ | 6456-37-001 |
Proj ID | RMC - 645637001 |
Work Type | CLEANING AND SWEEPING HIGHWAYS |
|
| 0.010 | 277719.00 | | 59500.00 | 21.4 |
NO CURRENT ESTIMATE AT TIME OF THIS RUN |
Work Order | 00-00-00 |
Work Began | 03-01-24 |
Work Completed | |
Time Computed | 00-00-00 |
Contract Working Days | 365 |
Addl Days Granted | 0 |
Working Days Charged | 31 |
Percent Time Used | 8 |
Contractor(s) |
TEXAS TMA RENTAL |
SUBCONTRACTOR(S) FOR CCSJ: 6456-37-001 NO SUBCONTRACTORS FOR THIS CCSJ
|
Contract # | 12234037 |
| Totals | 277719.00 | 59500.00 | 59500.00 | 21.4 |
|
County | HUNT |
Highway | SH0034 |
From | VARIOUS LOCATIONS IN |
To | HUNT COUNTY |
CSJ | 6457-50-001 |
Proj ID | BPM - 645750001 |
Work Type | BRIDGE PREVENTATIVE MAINTENANCE |
|
| 0.010 | 416470.00 | | 0.00 | 0.0 |
NO CURRENT ESTIMATE AT TIME OF THIS RUN |
Work Order | 00-00-00 |
Work Began | 00-00-00 |
Work Completed | |
Time Computed | 00-00-00 |
Contract Working Days | 90 |
Addl Days Granted | 0 |
Working Days Charged | 0 |
Percent Time Used | 0 |
Contractor(s) |
DCC CONSTRUCTION AND SERVICES, L.L.C. |
SUBCONTRACTOR(S) FOR CCSJ: 6457-50-001 NO SUBCONTRACTORS FOR THIS CCSJ
|
Contract # | 02244217 |
| Totals | 416470.00 | 0.00 | 0.00 | 0.0 |
|
County | FANNIN |
Highway | SH0056 |
From | VARIOUS LOCATIONS IN |
To | FANNIN COUNTY |
CSJ | 6457-53-001 |
Proj ID | BPM - 645753001 |
Work Type | BRIDGE PREVENTATIVE MAINTENANCE |
|
| 0.010 | 720186.52 | | 0.00 | 0.0 |
NO CURRENT ESTIMATE AT TIME OF THIS RUN |
Work Order | 00-00-00 |
Work Began | 00-00-00 |
Work Completed | |
Time Computed | 00-00-00 |
Contract Working Days | 42 |
Addl Days Granted | 0 |
Working Days Charged | 0 |
Percent Time Used | 0 |
Contractor(s) |
L & N BRIDGE, LLC |
SUBCONTRACTOR(S) FOR CCSJ: 6457-53-001 NO SUBCONTRACTORS FOR THIS CCSJ
|
Contract # | 04244203 |
| Totals | 720186.52 | 0.00 | 0.00 | 0.0 |
|
County | FANNIN |
Highway | SH0056 |
From | VARIOUS ROADWAYS IN |
To | FANNIN COUNTY |
CSJ | 6458-13-001 |
Proj ID | RMC - 645813001 |
Work Type | MOWING HIGHWAY RIGHT OF WAY |
|
| 0.010 | 287920.00 | | 0.00 | 0.0 |
NO CURRENT ESTIMATE AT TIME OF THIS RUN |
Work Order | 00-00-00 |
Work Began | 00-00-00 |
Work Completed | |
Time Computed | 00-00-00 |
Contract Working Days | 76 |
Addl Days Granted | 0 |
Working Days Charged | 0 |
Percent Time Used | 0 |
Contractor(s) |
PREMIER CONTRACTORS LLC |
SUBCONTRACTOR(S) FOR CCSJ: 6458-13-001 NO SUBCONTRACTORS FOR THIS CCSJ
|
Contract # | 12234038 |
| Totals | 287920.00 | 0.00 | 0.00 | 0.0 |
|
County | GRAYSON |
Highway | US0069 |
From | VARIOUS ROADWAYS IN |
To | GRAYSON COUNTY |
CSJ | 6458-27-001 |
Proj ID | RMC - 645827001 |
Work Type | MOWING HIGHWAY RIGHT OF WAY |
|
| 0.010 | 290019.80 | | 0.00 | 0.0 |
NO CURRENT ESTIMATE AT TIME OF THIS RUN |
Work Order | 00-00-00 |
Work Began | 00-00-00 |
Work Completed | |
Time Computed | 00-00-00 |
Contract Working Days | 74 |
Addl Days Granted | 0 |
Working Days Charged | 0 |
Percent Time Used | 0 |
Contractor(s) |
DOUBLE S TRACTOR SERVICES, LLC |
SUBCONTRACTOR(S) FOR CCSJ: 6458-27-001 NO SUBCONTRACTORS FOR THIS CCSJ
|
Contract # | 12234217 |
| Totals | 290019.80 | 0.00 | 0.00 | 0.0 |
|
County | GRAYSON |
Highway | US0075 |
From | VARIOUS ROADWAYS IN |
To | GRAYSON AND FANNIN COUNTY |
CSJ | 6458-29-001 |
Proj ID | RMC - 645829001 |
Work Type | MOWING HIGHWAY RIGHT OF WAY |
|
| 0.010 | 350423.40 | | 0.00 | 0.0 |
NO CURRENT ESTIMATE AT TIME OF THIS RUN |
Work Order | 00-00-00 |
Work Began | 00-00-00 |
Work Completed | |
Time Computed | 00-00-00 |
Contract Working Days | 58 |
Addl Days Granted | 0 |
Working Days Charged | 0 |
Percent Time Used | 0 |
Contractor(s) |
AMS TRACTOR SERVICES, LLC |
SUBCONTRACTOR(S) FOR CCSJ: 6458-29-001 NO SUBCONTRACTORS FOR THIS CCSJ
|
Contract # | 12234218 |
| Totals | 350423.40 | 0.00 | 0.00 | 0.0 |
|
County | HOPKINS |
Highway | IH0030 |
From | VARIOUS ROADWAYS IN |
To | HOPKINS, HUNT, AND FRANKLIN CO. |
CSJ | 6458-33-001 |
Proj ID | RMC - 645833001 |
Work Type | MOWING HIGHWAY RIGHT OF WAY |
|
| 0.010 | 273394.00 | | 0.00 | 0.0 |
NO CURRENT ESTIMATE AT TIME OF THIS RUN |
Work Order | 00-00-00 |
Work Began | 00-00-00 |
Work Completed | |
Time Computed | 00-00-00 |
Contract Working Days | 54 |
Addl Days Granted | 0 |
Working Days Charged | 0 |
Percent Time Used | 0 |
Contractor(s) |
EASTGATE SERVICES |
SUBCONTRACTOR(S) FOR CCSJ: 6458-33-001 NO SUBCONTRACTORS FOR THIS CCSJ
|
Contract # | 12234039 |
| Totals | 273394.00 | 0.00 | 0.00 | 0.0 |
|
County | GRAYSON |
Highway | SH0005 |
From | GRAYSON COUNTY |
To | MAINTENANCE GROUNDS |
CSJ | 6459-59-001 |
Proj ID | MMC - 645959001 |
Work Type | DENSE GRADED HOT MIX |
|
| 0.010 | 941000.00 | | 34921.05 | 3.7 |
NO CURRENT ESTIMATE AT TIME OF THIS RUN |
Work Order | 00-00-00 |
Work Began | 03-01-24 |
Work Completed | |
Time Computed | 00-00-00 |
Contract Working Days | 182 |
Addl Days Granted | 0 |
Working Days Charged | 31 |
Percent Time Used | 17 |
Contractor(s) |
RK HALL, LLC |
SUBCONTRACTOR(S) FOR CCSJ: 6459-59-001 NO SUBCONTRACTORS FOR THIS CCSJ
|
Contract # | 12234219 |
| Totals | 941000.00 | 34921.05 | 34921.05 | 3.7 |
|
County | LAMAR |
Highway | US0271 |
From | VARIOUS LOCATIONS IN |
To | LAMAR COUNTY |
CSJ | 6459-65-001 |
Proj ID | RMC - 645965001 |
Work Type | ILLUMINATION MAINTENANCE |
|
| 0.010 | 354775.00 | | 0.00 | 0.0 |
NO CURRENT ESTIMATE AT TIME OF THIS RUN |
Work Order | 00-00-00 |
Work Began | 00-00-00 |
Work Completed | |
Time Computed | 00-00-00 |
Contract Working Days | 45 |
Addl Days Granted | 0 |
Working Days Charged | 0 |
Percent Time Used | 0 |
Contractor(s) |
VACA UNDERGROUND UTILITIES INC |
SUBCONTRACTOR(S) FOR CCSJ: 6459-65-001 NO SUBCONTRACTORS FOR THIS CCSJ
|
Contract # | 03244016 |
| Totals | 354775.00 | 0.00 | 0.00 | 0.0 |
|
County | LAMAR |
Highway | US0082 |
From | VARIOUS ROADWAYS IN |
To | PARIS DISTRICT |
CSJ | 6460-45-001 |
Proj ID | RMC - 646045001 |
Work Type | REFLECTIVE PAVEMENT MARKINGS (LONG LINE) |
|
| 0.010 | 1127841.68 | | 0.00 | 0.0 |
NO CURRENT ESTIMATE AT TIME OF THIS RUN |
Work Order | 00-00-00 |
Work Began | 00-00-00 |
Work Completed | |
Time Computed | 00-00-00 |
Contract Working Days | 80 |
Addl Days Granted | 0 |
Working Days Charged | 0 |
Percent Time Used | 0 |
Contractor(s) |
STRIPING TECHNOLOGY, L.P. |
SUBCONTRACTOR(S) FOR CCSJ: 6460-45-001 NO SUBCONTRACTORS FOR THIS CCSJ
|
Contract # | 02244022 |
| Totals | 1127841.68 | 0.00 | 0.00 | 0.0 |
|
County | HOPKINS |
Highway | IH0030 |
From | VARIOUS ROADWAYS IN |
To | IN HOPKINS COUNTY |
CSJ | 6460-90-001 |
Proj ID | MMC - 646090001 |
Work Type | EMULSION |
|
| 0.010 | 267750.00 | | 0.00 | 0.0 |
NO CURRENT ESTIMATE AT TIME OF THIS RUN |
Work Order | 00-00-00 |
Work Began | 00-00-00 |
Work Completed | |
Time Computed | 00-00-00 |
Contract Working Days | 182 |
Addl Days Granted | 0 |
Working Days Charged | 0 |
Percent Time Used | 0 |
Contractor(s) |
ERGON ASPHALT & EMULSIONS, INC. |
SUBCONTRACTOR(S) FOR CCSJ: 6460-90-001 NO SUBCONTRACTORS FOR THIS CCSJ
|
Contract # | 03244017 |
| Totals | 267750.00 | 0.00 | 0.00 | 0.0 |
|