Monthly State Let Construction Report For San Antonio District As Of Sep 17, 2020 Page 2 Of 7

Last Update: Monday, September 21, 2020
FTP Icon
page 1 | page 2 | page 3 | page 4 | page 5 | page 6 | page 7

Contract Identification and InformationLengthContract AmountAmount This EstimateTotal Estimate To Date% Comp

CountyUVALDE ETC
HighwayUS 90 ETC
FromAT FM 2369
To.
CSJ0024-01-105
Proj IDSTP 1902(207)HES
Work TypeSFT
 
4.4001455288.951069207.5073.4
Work Order08-22-19
Work Began04-16-19
Work Completed
Time Computed09-21-19
Contract Working Days120
Addl Days Granted0
Working Days Charged86
Percent Time Used71
Contractor(s)
F & W ELECTRICAL CONTRACTORS, INC.
SUBCONTRACTOR(S) FOR CCSJ: 0024-01-105
FLASHER EQUIPMENT COMPANY (3.28)
Contract #07193036
Totals1455288.952100.001069207.5073.4

CountyUVALDE ETC
HighwayUS 90 ETC
From0.103 MI E OF CR 306
To0.641 MI W OF FM 2730
CSJ0024-02-075
Proj IDSTP 2020(956)HES
Work TypeSAFETY IMPROVEMENT PROJECTS
 
4.1202070932.030.000.0
NO CURRENT ESTIMATE AT TIME OF THIS RUN
Work Order08-20-20
Work Began00-00-00
Work Completed
Time Computed09-19-20
Contract Working Days145
Addl Days Granted0
Working Days Charged0
Percent Time Used0
Contractor(s)
E-Z BEL CONSTRUCTION, LLC
SUBCONTRACTOR(S) FOR CCSJ: 0024-02-075
NO SUBCONTRACTORS FOR THIS CCSJ
Contract #07203031
Totals2070932.030.000.000.0

CountyBEXAR
HighwayUS 90
FromIH 410
ToLP 13
CSJ0024-08-128
Proj IDSTP 2017(331)HES
Work TypeGRAD, STR, SIGN,
 
1.1722331043.072344615.9699.9
Work Order02-22-17
Work Began05-08-17
Work Completed
Time Computed03-24-17
Contract Working Days210
Addl Days Granted0
Working Days Charged351
Percent Time Used167
Contractor(s)
RELMCO, INC.
SUBCONTRACTOR(S) FOR CCSJ: 0024-08-128
FLASHER EQUIPMENT COMPANY (0.10)
SCOTT DERR PAINTING CO, LLC (0.42)
RDI FOUNDATION DRILLING (4.34)
F & W ELECTRICAL CONTRACTORS, INC. (3.22)
ENVIRONMENTAL SAFETY SERVICES, INC. (1.04)
VALLEY PLACERS, LLC (0.27)
NATIONAL REINFORCEMENT STEEL (2.74)
Contract #01173030
Totals2331043.070.002344615.9699.9

CountyBEXAR
HighwayUS 90
FromIH 410
ToSW 36TH STREET
CSJ0024-08-135
Proj IDNH 2020(676)
Work TypeOVERLAY
 
4775401.10852489.2917.8
Work Order04-23-20
Work Began06-08-20
Work Completed
Time Computed05-23-20
Contract Working Days138
Addl Days Granted0
Working Days Charged62
Percent Time Used44
Contractor(s)
ANGEL BROTHERS HOLDINGS CORP.
SUBCONTRACTOR(S) FOR CCSJ: 0024-08-135
A K FUQUAY CONSTRUCTION (1.68)
THE LEVY COMPANY, INC. (4.09)
FLASHER EQUIPMENT COMPANY (4.11)
CHEROKEE SERVICES (1.33)
RPV CONSTRUCTION, LLC (7.87)
Contract #03203224
Totals4775401.10230197.87852489.2917.8

CountyBEXAR
HighwaySS 371
FromBILLY MITCHELL ROAD
ToUS 90
CSJ0024-09-024
Proj IDC 24-9-24
Work TypeSURFACE & PAVEMENT MARKINGS
 
1.7753620525.944025723.7599.9
CountyBEXAR
HighwaySS 421
FromIH 410
ToCHERYL DR.
CSJ0291-10-103
Proj IDC 291-10-103
Work TypeSURFACE & PAVEMENT MARKERS
 
2.9852622395.221890940.0872.1
Work Order03-25-19
Work Began07-09-19
Work Completed
Time Computed04-24-19
Contract Working Days255
Addl Days Granted30
Working Days Charged241
Percent Time Used84
Contractor(s)
ANGEL BROTHERS HOLDINGS CORP.
SUBCONTRACTOR(S) FOR CCSJ: 0024-09-024
FLASHER EQUIPMENT COMPANY (4.17)
TEXAS R & G CONSTRUCTION SERVICES LLC (3.11)
THE LEVY COMPANY, INC. (3.36)
LONE STAR EROSION CONTROL (0.13)
TEXAS SITE SERVICES, LLC (0.01)
Contract #02193015
Totals6242921.162789.805916663.8394.7

CountyBEXAR
HighwaySS 371
FromAT QUINTANA ROAD
To.
CSJ0024-09-026
Proj IDC 24-9-26
Work TypeLANDSCAPE & SCENIC ENHANCEMENT
 
0.360428776.00118514.0027.6
Work Order07-07-20
Work Began07-27-20
Work Completed
Time Computed08-06-20
Contract Working Days73
Addl Days Granted0
Working Days Charged26
Percent Time Used35
Contractor(s)
ENCINO LANDSCAPE, INC.
SUBCONTRACTOR(S) FOR CCSJ: 0024-09-026
BUYERS BARRICADES SAN ANTONIO, LLC (0.00)
Contract #05203030
Totals428776.00116514.00118514.0027.6

CountyBEXAR
HighwayIH 10
FromIH 410
ToLOOP 1604
CSJ0025-02-160
Proj IDC 25-2-160
Work TypeGRAD,STR,BASE & SURF
 
6.235108886144.2489416727.3782.1
Work Order06-11-18
Work Began10-15-18
Work Completed
Time Computed07-11-18
Contract Working Days700
Addl Days Granted47
Working Days Charged555
Percent Time Used74
Contractor(s)
WEBBER, LLC
SUBCONTRACTOR(S) FOR CCSJ: 0025-02-160
AREA WIDE PROTECTIVE, INC. (0.08)
TEXAS ENVIRONMENTAL MANAGEMENT - SAN ANTONIO, INC. (0.93)
ROADSAFE TRAFFIC SYSTEMS, INC. (0.62)
OLDCASTLE MATERIALS TEXAS, INC. (5.96)
K. L. DURHAM CONSTRUCTION, L.L.C. (0.53)
BEAIRD DRILLING (1.59)
HIGHWAY INFRASTRUCTURE SAFETY SERVICES, INC. (0.46)
F & W ELECTRICAL CONTRACTORS, INC._(SAN ANTONIO) (4.47)
BOWMAN ENGINEERING & CONSULTING, INC. (1.49)
GRL ENGINEERS, INC. (0.00)
DEPENDABLE FENCE & WELDING CO. INC. (0.05)
GK CONSTRUCTION, LLC (0.10)
E&E GROUP INC., DBA LIGHT IT UP ELECTRIC (0.22)
ANCORTEX, INC. (2.07)
M & M STRIPING & POWER WASHING, LLC (0.01)
HIGHWAY PAVEMENT SPECIALTIES, INC. (0.21)
INDUS ROAD & BRIDGE, INC (1.39)
ADCOCK 4 INVESTMENTS, LLC (1.80)
FLASHER EQUIPMENT COMPANY (0.07)
URBAN INFRACONSTRUCTION LLC (0.25)
BEXAR COUNTY CONCRETE, LLC (0.12)
A. H. BECK FOUNDATION CO., INC. (0.14)
Contract #05183001
Totals108886144.243960639.0589416727.3782.1

CountyBEXAR
HighwayIH 10
FromFOSTER ROAD
ToGRAYTOWN ROAD
CSJ0025-02-198
Proj IDC 25-2-198
Work TypeGRAD, BS, STR, PVMT MRKG
 
6.26963752806.4462536664.8998.4
CountyBEXAR
HighwayIH 10
FromFOSTER ROAD
ToGRAYTOWN ROAD
CSJ0025-02-206
Proj IDROW 25-2-206
Work TypeUTILITY ADJUSTMENTS
 
0.8331536399.452277782.2099.9
Work Order10-14-16
Work Began10-27-16
Work Completed
Time Computed07-08-16
Contract Working Days812
Addl Days Granted180
Working Days Charged1,082
Percent Time Used109
Contractor(s)
STERLING DELAWARE HOLDING COMPANY, INC.
SUBCONTRACTOR(S) FOR CCSJ: 0025-02-198
ANCORTEX, INC. (0.52)
BAY CITY TRAFFIC (2.37)
PERFORMANCE EQUIPMENT SERVICE (0.15)
PENHALL COMPANY (AUSTIN) (0.02)
W. W. FOUNDATION DRILLING, LTD. (0.74)
C-3 ENVIRONMENTAL SPECIALTIES, LP (0.21)
DC CIVIL CONSTRUCTION LLC (2.09)
ENVIRONMENTAL SAFETY SERVICES, INC. (1.33)
FLASHER EQUIPMENT COMPANY (0.61)
FOX QUALITY CONCRETE, L.L.C. (1.35)
HIGHWAY PAVEMENT SPECIALTIES, INC. (0.04)
J.R. RAMON & SONS, INC. (0.17)
THE LEVY COMPANY, L.P. (1.06)
ROYAL REBAR (0.27)
SOUTH TEXAS PAINTING COMPANY (0.13)
ELLIS AND ELLIS (0.56)
RIO GRANDE REBAR RODBUSTERS, LLC. (0.01)
GK CONSTRUCTION, LLC (0.04)
Contract #06163201
Totals65289205.891484201.1364814447.0999.6

CountyBEXAR
HighwayIH 10
FromGRAYTOWN RD
ToGUADALUPE/BEXAR COUNTY LINE
CSJ0025-02-215
Proj IDC 25-2-215
Work TypeWIDEN FREEWAY
 
5.039140318444.720.000.0
CountyBEXAR
HighwayIH 10
FromGRAYTOWN RD
ToGUADALUPE/BEXAR COUNTY LINE
CSJ0025-02-218
Proj IDROW 25-2-218
Work TypeRIGHT OF WAY
 
5.0398881679.060.000.0
NO CURRENT ESTIMATE AT TIME OF THIS RUN
Work Order08-14-20
Work Began00-00-00
Work Completed
Time Computed11-12-20
Contract Working Days1,379
Addl Days Granted0
Working Days Charged0
Percent Time Used0
Contractor(s)
ZACHRY CONSTRUCTION CORPORATION
SUBCONTRACTOR(S) FOR CCSJ: 0025-02-215
NO SUBCONTRACTORS FOR THIS CCSJ
Contract #07203201
Totals149200123.780.000.000.0

CountyBEXAR
HighwayIH 10
FromIH 35
ToIH 37
CSJ0025-02-216
Proj IDC 25-2-216
Work TypeUPGRADE ILLUMINATION
 
2.6055251366.125779479.9399.9
CountyBEXAR
HighwayIH 37
FromFAIR AVENUE
ToIH 35
CSJ0073-08-192
Proj IDC 73-8-192
Work TypeUPGRADE ILLUMINATION
 
4.054916543.23578422.1663.1
Work Order08-21-18
Work Began04-01-19
Work Completed
Time Computed09-20-18
Contract Working Days183
Addl Days Granted37
Working Days Charged261
Percent Time Used118
Contractor(s)
HIGHWAY INTELLIGENT TRAFFIC SOLUTIONS, INC.
SUBCONTRACTOR(S) FOR CCSJ: 0025-02-216
FUQUAY, INC. (2.31)
TEXAS R & G CONSTRUCTION SERVICES LLC (8.00)
DOUBLE S CONSTRUCTION (1.27)
THOMAS 11 DEVELOPMENT LLC (14.91)
BUYERS BARRICADES SAN ANTONIO, LLC (0.86)
RANSOM DRILLING SERVICES, LLC (3.61)
ADCOCK 4 INVESTMENTS, LLC (15.63)
A K FUQUAY CONSTRUCTION (2.31)
Contract #07183019
Totals6167909.35198403.616357902.0999.9

CountyBEXAR
HighwayIH 10
FromIH 10 NFR AT CIBOLO CREEK
To.
CSJ0025-02-217
Proj IDBR 2019(035)
Work TypePAINT & REPAIR BRG, SURF, PAV'T MRK
 
0.1841479046.42968633.4767.2
Work Order10-22-18
Work Began06-17-19
Work Completed
Time Computed11-21-18
Contract Working Days130
Addl Days Granted0
Working Days Charged168
Percent Time Used129
Contractor(s)
RELMCO, INC.
SUBCONTRACTOR(S) FOR CCSJ: 0025-02-217
DIIBS SPECIALISTS (2.09)
FLASHER EQUIPMENT COMPANY (0.67)
S&S BRIDGE PAINTING (41.95)
Contract #09183019
Totals1479046.42125992.31968633.4767.2

CountyBEXAR
HighwayIH 10
FromLOOP 1604
ToGRAYTOWN RD
CSJ0025-02-219
Proj IDNH 1902(314)
Work TypeWIDEN FREEWAY
 
2.84191651868.2719479547.7021.2
Work Order09-16-19
Work Began02-03-20
Work Completed
Time Computed10-16-19
Contract Working Days1,174
Addl Days Granted0
Working Days Charged175
Percent Time Used14
Contractor(s)
JORDAN FOSTER CONSTRUCTION, LLC
SUBCONTRACTOR(S) FOR CCSJ: 0025-02-219
TRP CONSTRUCTION GROUP, LLC (0.66)
BUYERS BARRICADES SAN ANTONIO, LLC (0.56)
TEXAS ENVIRONMENTAL MANAGEMENT - SAN ANTONIO, INC. (0.54)
ADCOCK 4 INVESTMENTS, LLC (1.94)
PENHALL COMPANY (0.00)
AARON CONCRETE CONTRACTORS, L.P. (1.25)
J. R. (JOE) RAMON & SONS, INC. (0.19)
BEXAR CONCRETE WORKS INCORPORATED (3.51)
ROADWAY SPECIALTIES, INC. (0.51)
TEXAS MATERIALS GROUP, INC. (11.57)
F & W ELECTRICAL CONTRACTORS, INC. (2.60)
TORO BRAVO CONSTRUCTION, LLC (1.13)
BEAIRD DRILLING (1.64)
ROADWAY CONSTRUCTION, LLC (3.10)
LIGHT IT UP ELECTRIC (0.23)
ANCORTEX, INC. (1.59)
Contract #08193202
Totals91651868.271474451.5919479547.7021.2

CountyBEXAR
HighwayIH 10
From0.1 MILES WEST OF OF S. WALTERS
ToAMANDA
CSJ0025-02-223
Proj IDSTP 1902(318)
Work TypeLSE
 
1.1651049982.001032773.6598.3
Work Order09-25-19
Work Began12-09-19
Work Completed
Time Computed10-25-19
Contract Working Days125
Addl Days Granted0
Working Days Charged88
Percent Time Used70
Contractor(s)
TIGHT LINE CONSTRUCTION, LLC
SUBCONTRACTOR(S) FOR CCSJ: 0025-02-223
TX DOWN UNDER CONSTRUCTION, LLC (0.94)
BUYERS BARRICADES SAN ANTONIO, LLC (0.69)
Contract #08193232
Totals1049982.002000.001032773.6598.3

CountyBEXAR
HighwayFM 78
From2.939 MI W OF FM 1516
To2.325 MI W OF FM 1516
CSJ0025-09-079
Proj IDSTP 1902(315)HES
Work TypeSFT
 
0.614355921.72343470.9396.5
CountyBEXAR
HighwaySH 16
FromBRAUN RD
ToMYSTIC PARK
CSJ0291-10-112
Proj IDSTP 1902(315)HES
Work TypeSFT
 
0.481271953.1383695.3430.7
Work Order09-25-19
Work Began02-10-20
Work Completed
Time Computed10-25-19
Contract Working Days75
Addl Days Granted0
Working Days Charged70
Percent Time Used93
Contractor(s)
THE LEVY COMPANY, INC.
SUBCONTRACTOR(S) FOR CCSJ: 0025-09-079
CALAME CONTRACTING, LLC (13.32)
A K FUQUAY CONSTRUCTION (1.24)
AREA WIDE PROTECTIVE, INC. (0.90)
G 6 CONSTRUCTION, INC. (2.27)
Contract #08193028
Totals627874.8536958.61427166.2768.0

CountyGUADALUPE
HighwayFM 78
From0.2 MI EAST OF GEMBLER ROAD
To0.1 MI WEST OF WESTGATE DRIVE
CSJ0025-10-092
Proj IDSTP 2019(171)
Work TypeSURFACE & PAVEMENT MARKINGS
 
6.9773808766.713177086.0083.4
CountyGUADALUPE
HighwaySH 46
FromC.H. MATTHIES JR
To0.7 MI EAST OF FM 467
CSJ0216-02-062
Proj IDSTP 2019(171)
Work TypeSURFACE & PAVEMENT MARKINGS
 
4.4343512735.994703284.1799.9
Work Order02-13-19
Work Began04-01-19
Work Completed
Time Computed03-15-19
Contract Working Days182
Addl Days Granted28
Working Days Charged189
Percent Time Used90
Contractor(s)
HUNTER INDUSTRIES, LTD.
SUBCONTRACTOR(S) FOR CCSJ: 0025-10-092
F & W ELECTRICAL CONTRACTORS, INC. (5.11)
A K FUQUAY CONSTRUCTION (0.43)
FLASHER EQUIPMENT COMPANY (2.78)
INTERSTATE BARRICADES & MARKINGS, INC. (4.12)
PRIMATE CONSTRUCTION, LP (3.50)
TRP CONSTRUCTION GROUP, LLC (0.25)
ROADWAY SPECIALTIES, INC. (4.69)
RUCOBA & MAYA CONSTRUCTION, LLC (6.25)
SOUTHERN CUTTING & CORING, LLC (0.04)
BEAVER BOYS SERVICES (0.06)
Contract #11183218
Totals7321502.7055573.557880370.1799.9

CountyUVALDE ETC
HighwayUS 83 ETC
From1.587 MI SW OF SH 127
To2.252 MI SW OF SH 127
CSJ0036-08-054
Proj IDSTP 1902(208)HES
Work TypeSFT
 
38.4523103120.922765951.1889.1
Work Order08-13-19
Work Began03-16-20
Work Completed
Time Computed09-12-19
Contract Working Days254
Addl Days Granted0
Working Days Charged115
Percent Time Used45
Contractor(s)
E-Z BEL CONSTRUCTION, LLC
SUBCONTRACTOR(S) FOR CCSJ: 0036-08-054
FIBERTEL, LLC (3.09)
TOTAL HIGHWAY MAINTENANCE, LLC (19.99)
FLASHER EQUIPMENT COMPANY (17.80)
LOZANO CONSTRUCTION COMPANY, INC. (0.69)
CATO ELECTRIC COMPANY (0.11)
LONE STAR EROSION CONTROL (3.34)
G 6 CONSTRUCTION, INC. (0.00)
Contract #07193241
Totals3103120.92315822.882765951.1889.1

CountyUVALDE
HighwayUS 83
FromFM 1435
ToZAVALA COUNTY LINE
CSJ0037-01-042
Proj IDSTP 2019(170)
Work TypeGRADE, BASE, SC, SURF, PAVMT MRK
 
8.04010197040.687831122.7576.7
Work Order12-17-18
Work Began03-04-19
Work Completed
Time Computed01-16-19
Contract Working Days287
Addl Days Granted183
Working Days Charged342
Percent Time Used72
Contractor(s)
HUNTER INDUSTRIES, LTD.
SUBCONTRACTOR(S) FOR CCSJ: 0037-01-042
HIGHWAY BARRICADES AND SERVICES, LLC (2.51)
A K FUQUAY CONSTRUCTION (2.07)
INTERSTATE CONCRETE & STEEL SERVICES INCORPORATED (2.03)
DEPENDABLE FENCE & WELDING CO. INC. (0.60)
PRIMATE CONSTRUCTION, LP (0.49)
STRIPE-A-ZONE, INC. (0.21)
AREA WIDE PROTECTIVE, INC. (0.15)
FLASHER EQUIPMENT COMPANY (0.05)
Contract #11183203
Totals10197040.68386787.027831122.7576.7

CountyKENDALL
HighwayIH 10
FromCASCADE CAVERNS/SCENIC LOOP
ToKENDALL/BEXAR COUNTY LINE
CSJ0072-06-074
Proj IDNH 2019(776)
Work TypeGRAD, BS, STR, PVMT MRKG
 
1.47117816512.9010937408.5961.3
CountyKENDALL
HighwayIH 10
FromCASCADE CAVERNS/SCENIC LOOP
ToKENDALL/BEXAR COUNTY LINE
CSJ0072-06-079
Proj IDROW 72-6-79
Work TypeUTILITY
 
1.475518572.25221274.0042.6
Work Order05-14-19
Work Began07-15-19
Work Completed
Time Computed06-13-19
Contract Working Days603
Addl Days Granted0
Working Days Charged334
Percent Time Used55
Contractor(s)
AUSTIN BRIDGE & ROAD SERVICES, LP
SUBCONTRACTOR(S) FOR CCSJ: 0072-06-074
ADCOCK 4 INVESTMENTS, LLC (11.00)
AUSTIN WOOD RECYCLING (0.15)
BLACKTOP INDUSTRIES LLC (0.39)
ENVIRONMENTAL SAFETY SERVICES, INC. (2.68)
FLASHER EQUIPMENT COMPANY (0.31)
FRANK JR REINFORCEMENT LLC (0.29)
HIGHWAY PAVEMENT SPECIALTIES, INC. (0.02)
M5 UTILITIES, LLC (1.66)
PRESIDIO CONTRACTING, LLC (1.26)
SCOTT DERR PAINTING CO, LLC (0.14)
TEXAS ENVIRONMENTAL MANAGEMENT - SAN ANTONIO, INC. (1.01)
THE LEVY COMPANY, INC. (1.86)
TRP CONSTRUCTION GROUP, LLC (1.23)
VOGES DRILLING CO. (0.85)
WEBBER, LLC (1.12)
TEXAS MATERIALS GROUP, INC. (21.50)
HARRIS HARDROCK TRENCHING, L.L.C. (0.80)
CALIDAD, LLC (2.15)
MTAM CORPORATION (0.11)
WILLIAMS ROAD, LLC (0.21)
EARTH REINFORCEMENTS LLC (0.33)
CALAME CONTRACTING, LLC (0.19)
Contract #04193203
Totals18335085.151246139.3511158682.5960.8

CountyKENDALL
HighwayIH 10
FromUS 87 SOUTH "Y"
ToCASCADE CAVERNS/SCENIC LOOP
CSJ0072-06-075
Proj IDC 72-6-75
Work TypeGRAD, BS, STR, SURF, PVMT MRKG
 
1.71934617612.0523607096.4668.1
CountyKENDALL
HighwayIH 10
FromSH 46
ToUS 87 SOUTH "Y"
CSJ0072-06-076
Proj IDC 72-6-76
Work TypeGRAD, BS, STR, SURF, PVMT MRKG
 
1.37424687889.3813070802.3552.9
CountyKENDALL
HighwayIH 10
FromUS 87 SOUTH "Y"
ToCASCADE CAVERNS/SCENIC LOOP
CSJ0072-06-078
Proj IDNH 1702(844)
Work TypeROW UTILITIES ADJUSTMENTS
 
1.719540022.00741205.9299.9
CountyKENDALL
HighwayIH 10
FromSH 46
ToUS 87 SOUTH "Y"
CSJ0072-06-080
Proj IDNH 1702(845)
Work TypeROW UTILITIES ADJUSTMENTS
 
1.374436734.00599153.7299.9
Work Order04-18-18
Work Began06-18-18
Work Completed
Time Computed05-18-18
Contract Working Days720
Addl Days Granted0
Working Days Charged636
Percent Time Used88
Contractor(s)
STERLING DELAWARE HOLDING COMPANY, INC.
SUBCONTRACTOR(S) FOR CCSJ: 0072-06-075
ROADWAY SPECIALTIES, INC. (2.71)
LONE STAR EROSION CONTROL (0.34)
C-3 ENVIRONMENTAL SPECIALTIES, LP (0.05)
FUQUAY, INC. (0.91)
VOGES DRILLING (0.80)
ADCOCK 4 INVESTMENTS, LLC (4.70)
RELMCO, INC. (5.13)
FRANK JR REINFORCEMENT LLC (0.30)
THE LEVY COMPANY, INC. (2.84)
PERFORMANCE EQUIPMENT SERVICE (0.75)
ROADSAFE TRAFFIC SYSTEMS, INC. (0.85)
J. R. (JOE) RAMON & SONS, INC. (0.24)
GEOSOURCE, INC. (0.56)
J.A. ROAD BORING, INC. (0.13)
SCOTT DERR PAINTING CO, LLC (0.12)
HIGHWAY PAVEMENT SPECIALTIES, INC. (0.04)
WEST TEXAS RUMBLE STRIP (0.01)
LONE STAR PAVING COMPANY (4.97)
H. L. CHAPMAN PIPELINE CONSTRUCTION, INC. (0.41)
H & T UTILITIES, L.C. (0.07)
B&E TRUCKING (0.78)
IVY ROSALVA CRUZ DBA IVY"S TRUCKING (0.77)
C & C ALCOSER TRUCKING (0.49)
MICKIE SERVICE, INC. (0.07)
1 PRIORITY ENVIRONMENTAL SERVICES, LLC (0.04)
Contract #03183001
Totals60282257.43743147.1138018258.4563.0

CountyKENDALL
HighwayIH 10
FromCIBOLO CREEK
ToSH 46
CSJ0072-06-084
Proj IDNH 2019(768)
Work TypeOVERLAY
 
2.7502599609.29802739.4930.8
CountyGILLESPIE
HighwayIH 10
FromKERR/GILLESPIE COUNTY LINE
ToGILLESPIE/KERR COUNTY LINE
CSJ0142-13-017
Proj IDNH 2019(768)
Work TypeOVERLAY
 
5.9545137834.574397640.1785.5
CountyKERR
HighwayIH 10
FromGILLESPIE/KERR COUNTY LINE
To1.3 MI E OF GILLESPIE/KERR CTY LINE
CSJ0142-14-063
Proj IDNH 2019(768)
Work TypeOVERLAY
 
1.2311499688.611167993.4677.8
CountyKERR
HighwayIH 10
From0.4 MI E OF SH 16
ToKERR/KENDALL COUNTY LINE
CSJ0142-14-064
Proj IDNH 2019(768)
Work TypeOVERLAY
 
13.10212200286.556859033.0756.2
Work Order11-20-19
Work Began03-18-20
Work Completed
Time Computed12-20-19
Contract Working Days271
Addl Days Granted0
Working Days Charged90
Percent Time Used33
Contractor(s)
LONE STAR PAVING COMPANY
SUBCONTRACTOR(S) FOR CCSJ: 0072-06-084
WEST TEXAS ROCK RESOURCES, LLC (0.19)
TRP CONSTRUCTION GROUP, LLC (3.27)
PRIMATE CONSTRUCTION, LP (1.13)
FLASHER EQUIPMENT COMPANY (0.28)
LONE STAR EROSION CONTROL (0.74)
RELMCO, INC. (1.17)
DUSTROL, INC. (30.23)
C-3 ENVIRONMENTAL SPECIALTIES, LP (1.92)
RPV CONSTRUCTION, LLC (3.09)
Contract #10193004
Totals21437419.027049882.8413227406.1961.7