Monthly State Let Construction Report For San Angelo District As Of Aug 23, 2019 Page 1 Of 2

Last Update: Friday, August 23, 2019
FTP Icon
page 1 | page 2

Contract Identification and InformationLengthContract AmountAmount This EstimateTotal Estimate To Date% Comp

CountyRUNNELS ETC
HighwayUS 83 ETC
FromUS 67
ToCONCHO COUNTY LINE
CSJ0035-01-034
Proj IDSTP 2019(269)
Work TypeSEAL COAT
 
332.30513130698.763242161.0824.6
Work Order01-17-19
Work Began07-22-19
Work Completed
Time Computed07-01-19
Contract Working Days68
Addl Days Granted0
Working Days Charged23
Percent Time Used33
Contractor(s)
RONALD R. WAGNER & CO., LP
SUBCONTRACTOR(S) FOR CCSJ: 0035-01-034
FLAT LINE, INC. (5.25)
BARRICADES PLUS, LLC (0.92)
RED SIXTEEN CONSTRUCTION, INC (0.86)
Contract #12183208
Totals13130698.76772808.383242161.0824.6

CountyRUNNELS ETC
HighwayUS 83 ETC
FromUS 67
ToCONCHO CO LINE
CSJ0035-01-035
Proj IDSTP 2019(830)HES
Work TypeSAFETY IMPROVEMENT PROJECTS
 
87.3563077658.580.000.0
NO CURRENT ESTIMATE AT TIME OF THIS RUN
Work Order06-20-19
Work Began00-00-00
Work Completed
Time Computed08-19-19
Contract Working Days276
Addl Days Granted0
Working Days Charged0
Percent Time Used0
Contractor(s)
RELMCO, INC.
SUBCONTRACTOR(S) FOR CCSJ: 0035-01-035
NO SUBCONTRACTORS FOR THIS CCSJ
Contract #05193011
Totals3077658.580.000.000.0

CountyCONCHO ETC
HighwayUS 83 ETC
FromRUNNELS COUNTY LINE
To11.4 MI S OF RUNNELS COUNTY LINE
CSJ0035-02-037
Proj IDSTP 2019(271)
Work TypeSEAL COAT
 
37.3333060704.832717658.2888.7
Work Order01-11-19
Work Began07-16-19
Work Completed
Time Computed07-16-19
Contract Working Days32
Addl Days Granted0
Working Days Charged13
Percent Time Used40
Contractor(s)
COX PAVING OF TEXAS, INC.
SUBCONTRACTOR(S) FOR CCSJ: 0035-02-037
INTERSTATE BARRICADES & MARKINGS, INC. (3.48)
Contract #12183217
Totals3060704.832148625.122717658.2888.7

CountyMENARD
HighwayUS 83
FromSH 29
ToKIMBLE COUNTY LINE
CSJ0035-06-032
Proj IDSTP 2018(059)
Work TypeADD PASSING LANES
 
11.7965814758.835061241.4985.3
Work Order10-16-17
Work Began01-15-18
Work Completed
Time Computed01-14-18
Contract Working Days265
Addl Days Granted31
Working Days Charged226
Percent Time Used76
Contractor(s)
ALLEN KELLER COMPANY
SUBCONTRACTOR(S) FOR CCSJ: 0035-06-032
MOBILE ENTERPRISES, INC. (3.42)
TEXAS ALTERNATIVE GRASSER, INC. (0.28)
WIMS ENVIRONMENTAL CONSTRUCTION, LTD. (2.44)
WEST TEXAS RUMBLE STRIP (0.57)
THE LEVY COMPANY, INC. (0.17)
FLASHER LIMITED (0.42)
DUSTIN ALLEN, INC. (3.82)
(USE 06621)D. I. J. CONSTRUCTION, INC. (1.78)
S & S BRIDGE PAINTING, INC. (0.00)
Contract #09173020
Totals5814758.83806182.445061241.4985.3

CountyKIMBLE
HighwayUS 83
FromMENARD COUNTY LINE
ToIH 10
CSJ0035-07-043
Proj IDSTP 2018(679)
Work TypeADD PASSING LANES
 
13.7445713900.342458879.6943.0
Work Order03-07-18
Work Began03-22-18
Work Completed
Time Computed03-22-18
Contract Working Days339
Addl Days Granted17
Working Days Charged143
Percent Time Used40
Contractor(s)
ALLEN KELLER COMPANY
SUBCONTRACTOR(S) FOR CCSJ: 0035-07-043
FUQUAY, INC. (3.30)
INCE ENTERPRISES, INC. (2.19)
D. I. J. CONSTRUCTION, INC. (2.07)
DOUBLE A CONTRACTING, L.P. (0.57)
TEXAS ALTERNATIVE GRASSER, INC. (0.25)
MOBILE ENTERPRISES, INC. (1.22)
A K FUQUAY CONSTRUCTION (3.30)
Contract #02183236
Totals5713900.3471804.002458879.6943.0

CountyCONCHO
HighwayUS 87
FromON US 87 APPROX 9 MILES WEST OF EDE
To.
CSJ0070-03-049
Proj IDNH 2000(292)
Work TypeRECONSTRUCTION OF SAFETY REST AREA
 
0.2593089888.97231741.677.4
Work Order05-09-19
Work Began07-01-19
Work Completed
Time Computed07-01-19
Contract Working Days365
Addl Days Granted0
Working Days Charged31
Percent Time Used8
Contractor(s)
DCI CONTRACTING, INC.
SUBCONTRACTOR(S) FOR CCSJ: 0070-03-049
NO SUBCONTRACTORS FOR THIS CCSJ
Contract #04193223
Totals3089888.97231741.67231741.677.4

CountyCONCHO
HighwayUS 87
From1.1 MILES EAST OF US 83
ToMCCULLOCH COUNTY LINE
CSJ0070-05-037
Proj IDNH 1902(151)
Work TypeSP2
 
14.20013599407.740.000.0
NO CURRENT ESTIMATE AT TIME OF THIS RUN
Work Order08-16-19
Work Began00-00-00
Work Completed
Time Computed00-00-00
Contract Working Days299
Addl Days Granted0
Working Days Charged0
Percent Time Used0
Contractor(s)
ALLEN KELLER COMPANY
SUBCONTRACTOR(S) FOR CCSJ: 0070-05-037
NO SUBCONTRACTORS FOR THIS CCSJ
Contract #07193008
Totals13599407.740.000.000.0

CountyCROCKETT
HighwayIH 10
From0.25 MILES WEST OF RIO GRANDE ST
ToSH 163 IN OZONA
CSJ0140-11-045
Proj IDC 140-11-45
Work TypeOPERATIONAL IMPROVEMENTS
 
0.9313784610.022770682.9073.2
Work Order09-18-18
Work Began10-22-18
Work Completed
Time Computed10-08-18
Contract Working Days242
Addl Days Granted2
Working Days Charged151
Percent Time Used61
Contractor(s)
ALLEN KELLER COMPANY
SUBCONTRACTOR(S) FOR CCSJ: 0140-11-045
WEST TEXAS ROCK RESOURCES, LLC (0.12)
THE LEVY COMPANY, INC. (2.61)
HJC FARMS, INC. (2.76)
FUQUAY, INC. (1.21)
D. I. J. CONSTRUCTION, INC. (1.20)
RELMCO, INC. (37.17)
AREA WIDE PROTECTIVE, INC. (4.98)
TEXAS SHAFTS, INC. (3.55)
MCL CONTRACTING, LLC (0.00)
A K FUQUAY CONSTRUCTION (1.21)
FRANK JR REINFORCEMENT LLC (0.00)
Contract #08183029
Totals3784610.02142174.202770682.9073.2

CountyKIMBLE
HighwayIH 10
FromSUTTON COUNTY LINE
To9.9 MI E OF SUTTON COUNTY LINE
CSJ0141-08-047
Proj IDNH 2018(061)
Work TypeACP OVERLAY
 
9.8856324553.657122061.9099.9
NO CURRENT ESTIMATE AT TIME OF THIS RUN
Work Order12-14-17
Work Began05-01-18
Work Completed
Time Computed03-14-18
Contract Working Days100
Addl Days Granted5
Working Days Charged136
Percent Time Used129
Contractor(s)
LONE STAR PAVING COMPANY
SUBCONTRACTOR(S) FOR CCSJ: 0141-08-047
FLASHER LIMITED (3.06)
CHEROKEE SERVICES (2.43)
DUSTROL, INC. (12.38)
ROADWAY SPECIALTIES, INC. (0.28)
C-3 ENVIRONMENTAL SPECIALTIES, LP (0.48)
PENHALL COMPANY (0.34)
WOLFE CONSTRUCTION GROUP, INC. (0.20)
GREEN MILLING GROUP (0.07)
J3 COMPANY, LLC (0.03)
Contract #11173004
Totals6324553.650.007122061.9099.9

CountyKIMBLE
HighwayIH 10
From9.9 MI E OF SUTTON COUNTY LINE
To22.8 MI E OF SUTTON COUNTY LINE
CSJ0141-09-070
Proj IDC 141-9-70
Work TypeACP OVERLAY
 
12.9538342120.022061055.3024.7
Work Order07-19-18
Work Began04-15-19
Work Completed
Time Computed10-17-18
Contract Working Days145
Addl Days Granted0
Working Days Charged52
Percent Time Used35
Contractor(s)
LONE STAR PAVING COMPANY
SUBCONTRACTOR(S) FOR CCSJ: 0141-09-070
DUSTROL, INC. (11.08)
CHEROKEE SERVICES (3.76)
FLASHER EQUIPMENT COMPANY (2.70)
4-WAY HAULERS, LLC (0.46)
WIMS ENVIRONMENTAL CONSTRUCTION, LTD. (0.31)
Contract #06183231
Totals8342120.02845372.082061055.3024.7

CountyRUNNELS
HighwayUS 67
FromCOLORADO RIVER BRIDGE
ToTOM GREEN COUNTY LINE
CSJ0158-01-082
Proj IDNH 2019(396)
Work TypeACP OVERLAY
 
19.15416352619.662867653.9817.5
Work Order03-18-19
Work Began06-24-19
Work Completed
Time Computed06-17-19
Contract Working Days166
Addl Days Granted0
Working Days Charged32
Percent Time Used19
Contractor(s)
KIEWIT INFRASTRUCTURE SOUTH CO.
SUBCONTRACTOR(S) FOR CCSJ: 0158-01-082
BRANNAN PAVING CO., LTD. (12.74)
BARRICADES UNLIMITED (2.31)
TEXOP CONSTRUCTION (1.68)
Contract #02193204
Totals16352619.662757136.072867653.9817.5

CountyRUNNELS
HighwayUS 67
From1.6 MI SOUTH OF US 83
ToTOM GREEN COUNTY LINE
CSJ0158-01-083
Proj IDSTP 1902(010)HES
Work TypeSAFETY IMPROVEMENT PROJECTS
 
29.1703312755.350.000.0
NO CURRENT ESTIMATE AT TIME OF THIS RUN
Work Order07-17-19
Work Began00-00-00
Work Completed
Time Computed00-00-00
Contract Working Days202
Addl Days Granted0
Working Days Charged0
Percent Time Used0
Contractor(s)
GRATIOT CONSTRUCTION, LTD.
SUBCONTRACTOR(S) FOR CCSJ: 0158-01-083
NO SUBCONTRACTORS FOR THIS CCSJ
Contract #06193215
Totals3312755.350.000.000.0

CountyTOM GREEN
HighwayUS 67
FromAT TRACTOR TRAIL
To.
CSJ0158-02-084
Proj IDNH 1802(735)
Work TypeCONSTRUCT INTERCHANGE
 
2.38137993285.3910325129.4227.1
Work Order09-18-18
Work Began11-19-18
Work Completed
Time Computed11-19-18
Contract Working Days625
Addl Days Granted0
Working Days Charged145
Percent Time Used23
Contractor(s)
REECE ALBERT, INC.
SUBCONTRACTOR(S) FOR CCSJ: 0158-02-084
TOM"S TREE PLACE (0.13)
CONTRACTORS SERVICE COMPANY (0.38)
BEAVER CONTRACTORS, LLC (5.37)
AARON CONCRETE CONTRACTORS, L.P. (0.24)
DK CONTRACTING, LLC (0.36)
D. I. J. CONSTRUCTION, INC. (0.63)
BAR NONE AG SUPPLY COMPANY, INC. (0.02)
HJC FARMS, INC. (2.68)
DUSTROL, INC. (0.34)
M & D FOUNDATION DRILLING INDUSTRIES, INC. (0.85)
WILLIS ELECTRIC CO., LP (2.35)
TEXAS ENVIRONMENTAL MANAGEMENT - SAN ANTONIO, INC. (1.11)
GARY A. CRAIN, INC. (0.04)
WEST TEXAS ROCK RESOURCES, LLC (0.02)
MARKS CRANE & RIGGING (0.13)
BOWMAN ENGINEERING & CONSULTING, INC. (0.06)
FUSION COMMUNICATIONS, LLC (0.04)
Contract #08183202
Totals37993285.39767139.1010325129.4227.1

CountyREAL ETC
HighwaySH 55 ETC
From7.0 M N OF UVALDE CO LINE
ToUVALDE CO LINE
CSJ0235-03-034
Proj IDSTP 2019(508)HES
Work TypePROFILE EDGELINE/CENTERLINE MARKING
 
89.9871009257.600.000.0
Work Order03-18-19
Work Began00-00-00
Work Completed
Time Computed05-17-19
Contract Working Days70
Addl Days Granted0
Working Days Charged0
Percent Time Used0
Contractor(s)
TRP CONSTRUCTION GROUP, LLC
SUBCONTRACTOR(S) FOR CCSJ: 0235-03-034
NO SUBCONTRACTORS FOR THIS CCSJ
Contract #02193024
Totals1009257.600.000.000.0

CountyTOM GREEN
HighwaySL 306
From2.13 MI NORTH OF US 877
ToUS 67
CSJ0264-07-032
Proj IDSTP 1802(195)
Work TypeACP OVERLAY
 
4.4654500317.864077830.3090.7
Work Order07-17-18
Work Began02-11-19
Work Completed
Time Computed10-15-18
Contract Working Days90
Addl Days Granted2
Working Days Charged98
Percent Time Used106
Contractor(s)
REECE ALBERT, INC.
SUBCONTRACTOR(S) FOR CCSJ: 0264-07-032
CONTRACTORS SERVICE COMPANY (0.91)
TEXOP CONSTRUCTION (2.03)
SCR CONSTRUCTION CO., INC. (0.63)
HJC FARMS, INC. (6.96)
FLASHER EQUIPMENT COMPANY (3.40)
WEST TEXAS ROCK RESOURCES, LLC (0.22)
TITAN MILLING INC. (0.89)
Contract #06183042
Totals4500317.861104242.254077830.3090.7

CountyGLASSCOCK
HighwaySH 158
FromMIDLAND COUNTY LINE
To0.3 MILES WEST OF RM 33
CSJ0463-04-026
Proj IDNH 1802(312)
Work TypeACP OVERLAY
 
45.43820119919.327468579.1937.1
Work Order08-09-18
Work Began12-05-18
Work Completed
Time Computed11-07-18
Contract Working Days217
Addl Days Granted35
Working Days Charged128
Percent Time Used50
Contractor(s)
RK HALL, LLC
SUBCONTRACTOR(S) FOR CCSJ: 0463-04-026
CONTRACTORS SERVICE COMPANY (0.31)
TEX OP CONSTRUCTION, LP (0.59)
RPV CONSTRUCTION, LLC (1.41)
SURFACE PREPARATION TECHNOLOGIES, LLC (0.26)
BARRICADES UNLIMITED (2.85)
TEXAS ENVIRONMENTAL MANAGEMENT - SAN ANTONIO, INC. (0.10)
MOCKINGBIRD INDUSTRIES INCORPORATED (0.06)
Contract #07183204
Totals20119919.3286056.487468579.1937.1

CountyTOM GREEN
HighwayRM 853
FromAT BRUSHY CREEK
To.
CSJ0555-05-024
Proj IDBR 2018(060)
Work TypeREPLACE BRIDGE AND APPROACHES
 
0.0751177930.301165118.9099.4
NO CURRENT ESTIMATE AT TIME OF THIS RUN
Work Order11-15-17
Work Began02-13-18
Work Completed
Time Computed02-13-18
Contract Working Days128
Addl Days Granted0
Working Days Charged137
Percent Time Used107
Contractor(s)
3LW CIVIL LLC
SUBCONTRACTOR(S) FOR CCSJ: 0555-05-024
CONTRACTORS SERVICE COMPANY (0.67)
LONE STAR PAVING COMPANY (7.31)
BARRICADES UNLIMITED (1.31)
BATTEN DRILLING, INC. (2.37)
GRANBURY EXCAVATING, INC. (1.75)
WOLFE CONSTRUCTION GROUP, INC. (0.27)
DALEY"S SUPERIOR ASPHALT MANUFACTURING INC (2.33)
TRP CONSTRUCTION GROUP, LLC (0.76)
Contract #10173016
Totals1177930.300.001165118.9099.4

CountyGLASSCOCK
HighwayRM 33
FromHOWARD COUNTY LINE
To15.5 MI S OF HOWARD CO LINE
CSJ0558-06-015
Proj IDSTP 2019(647)HES
Work TypePROFILE EDGELINE/CENTERLINE MARKING
 
30.991572072.470.000.0
CountyGLASSCOCK
HighwayRM 33
FromHOWARD COUNTY LINE
To15.5 MI SOUTH OF HOWARD COUNTY LINE
CSJ0558-06-016
Proj IDSTP 2019(648)
Work TypeRESTORATION OF EXISTING ROAD
 
15.5036126866.050.000.0
Work Order04-16-19
Work Began00-00-00
Work Completed
Time Computed07-15-19
Contract Working Days124
Addl Days Granted0
Working Days Charged0
Percent Time Used0
Contractor(s)
RK HALL, LLC
SUBCONTRACTOR(S) FOR CCSJ: 0558-06-015
BARRICADES UNLIMITED (0.89)
DUSTROL, INC. (0.84)
DELGADO"S CONTRACTORS, LLC (2.08)
HJC FARMS, INC. (0.88)
DOUBLE A CONTRACTING, L.P. (4.56)
J. H. ODEN CONTRACTING COMPANY (0.87)
Contract #03193008
Totals6698938.520.000.000.0

CountyREAGAN
HighwaySH 137
FromRM 33
To0.6 MILES SOUTH OF US 67
CSJ0558-09-035
Proj IDSTP 2019(831)
Work TypeRER
 
19.94717898104.160.000.0
NO CURRENT ESTIMATE AT TIME OF THIS RUN
Work Order08-16-19
Work Began00-00-00
Work Completed
Time Computed00-00-00
Contract Working Days213
Addl Days Granted0
Working Days Charged0
Percent Time Used0
Contractor(s)
RK HALL, LLC
SUBCONTRACTOR(S) FOR CCSJ: 0558-09-035
NO SUBCONTRACTORS FOR THIS CCSJ
Contract #07193207
Totals17898104.160.000.000.0

CountyTOM GREEN
HighwayVA
FromVARIOUS ROADWAYS IN SJT DISTRICT
To.
CSJ0907-00-170
Proj IDSTP 1802(384)
Work TypeSAFETY IMPROVEMENTS
 
0.001591866.60605724.6299.9
CountyTOM GREEN
HighwayVA
FromVARIOUS LOCATIONS IN SJT DISTRICT
To.
CSJ0907-00-187
Proj IDBR 1802(385)
Work TypeINSTALL CRASH WALLS
 
0.0016187161.461426025.2423.0
Work Order10-05-18
Work Began12-03-18
Work Completed
Time Computed11-05-18
Contract Working Days412
Addl Days Granted0
Working Days Charged148
Percent Time Used35
Contractor(s)
RELMCO, INC.
SUBCONTRACTOR(S) FOR CCSJ: 0907-00-170
DIIBS SPECIALISTS (8.08)
S & S BRIDGE PAINTING, INC. (6.69)
BARRICADES UNLIMITED (4.29)
Contract #07183230
Totals6779028.06121919.562031749.8629.9